Formations en business analyse, gestion de projet - Genève, Lausanne, Bern, Zurich

CBAP Certification Study Guide v3.0

Cover of CBAB Certification Study Guide v3.0

The 1st CBAP v3.0 Study Guide from a leader in CBAP and CCBA!

CBAP and CCBA certification are the industry benchmarks for those who practice the profession of business analysis. This comprehensive guide is easy to work with. Watermark Learning’s experience as early supporters of the IIBA, as well as contributors to the BABOK Guide, gives this publication an extra edge. It covers the BABOK Guide version 3 in depth, and is also the premier resource for CCBA candidates. The guide provides a single tool to prepare not only for the exam but also for the real-life world of the business analyst.

  • Paperback: 520 pages
  • Langue: Anglais
  • ISBN-13: 978-0692691458
  • Prix: CHF 90.00

Passez simplement votre commande avec le bulletin de versement ci-contre.

Frais de port (Suisse): CHF 9.00
Envoi en Europe: envoyez-nous un message: [Cliquez vour envoyer un message]

Bulletin de versement Smart Gecko Academy

Why you need this study guide

Not only does this guide show you what to study, it also details how to study. Included is:

  • A detailed BABOK summary, focused on aligning your business analysis experience with the BABOK Knowledge Areas and passingOnline Study Trial Offer the CBAP/ CCBA exam.
  • A full CBAP exam simulation and answer key designed to improve your test-taking skills and prepare you for the exam questions
  • Tips, hints, and techniques for structuring, mastering, and retaining information to help you streamline your study time and pass the test
  • Hundreds of diagrams, figures, and tables to help you focus on the important points from the BABOK
  • A glossary of business analysis terms and a cross-reference to the BABOK
  • A useful resource even after you pass the exam.

Includes

  • Business Analysis Key Concepts
  • Business Analysis Planning and Monitoring
  • Elicitation and Collaboration
  • Requirements Life Cycle Management
  • Strategy Analysis
  • Requirements Analysis and Design Definition
  • Solution Evaluation
  • Underlying Competencies
  • Techniques
  • Perspectives
  • Terminology Summary

    Smart Gecko AG

    +41 22 570 09 31 (fr)
    +41 55 505 27 60 (de/en)

    training@smartgecko.academy