Wise Crowds
Wise Crowds is a meeting structure in which a group of peers advises one of its members on a problem that member brings. The person being helped is called the client and the others take the role of consultants. They ask the client clarifying questions. They then advise the client among themselves while the client turns their back and takes notes. Henri Lipmanowicz and Keith McCandless designed it and describe it in The Surprising Power of Liberating Structures (2013). The book gives a small format of 15 minutes per person and a large format of one hour for a single client. The authors' site publishes a third version of about 25 to 55 minutes.
Goal
Wise Crowds is a facilitation structure: one participant presents a problem and the rest of their group advises them. In the small format, each member of the group takes the client role in turn. According to the authors, the learning is cumulative: each participant learns during their turn as client and during their successive turns as consultant.
The Field Guide (part four of the book) sets out the structure's purposes for each participant: to refine the skill of giving, receiving and asking for help; to practise listening without defending. For the group, the structure is meant to tap everyone's intelligence without long presentations, free the knowledge that exists across silos, replace status briefings and build trust. According to the authors, the results last because each individual and the group produced them together without outside expertise. The book claims that a group can outperform the expert. The site links the structure to the Liberating Structures principle "Build Trust as You Go".
Each client takes notes during their consultation. In the large format, the satellite teams can also write their recommendations for the client on index cards. At the end of the consultation, the client tells the consultants what was useful and what they take away. The client leaves with their notes and decides alone what to keep.
You'll find the other structures in the repertoire in the Liberating Structures fiche.
Usage
When to use it
- Progress review: the book proposes Wise Crowds to replace progress presentations and reviews.
- Peers on several sites who learn from one another: the book cites multisite research groups that support one another with it.
- Merger of organisations: managers from several units use it to tackle the problems the merger creates.
- Problem that cuts across functions: consultants from several functions, levels and disciplines examine it. The book considers this mix ideal.
- Implementing a strategy: after Critical Uncertainties, each person receives advice from several disciplines on their share of the work.
- Large group around a single case: in the large format, one person asks a whole room for help.
- Difficult relationship with one person: the client asks for advice on that relationship.
- Videoconference session: the client turns off their camera during the advice.
- First try at Liberating Structures: the book lists it among the simple structures to start with.
When not to use it
- Problem shared by the whole group: Wise Crowds advises one person at a time. With 1-2-4-All, the whole room works on the same question.
- Three participants: the small format needs groups of four or five. Troika Consulting advises in trios.
- Confidential problem: in our view, the client holds back sensitive facts in front of peers and does so even more in front of a room. A one-to-one conversation with a mentor or a coach fits better.
Description
The book's formats and the site's version
The Field Guide describes two formats. In the small format, the room holds one or more groups of four or five people. Within each group, everyone becomes the client in turn. In the large format, a single client asks a whole room for help. According to the book, such a room can hold a hundred people or more. The authors' site publishes a third version. The facilitator chooses two or three volunteers. One to three of them take their turn one after the other in front of a group of at least ten people.
In our view, the facilitator chooses one of the three procedures and keeps its durations.
The roles
The client brings a problem and asks for help. The consultants help the client clarify this problem, then give advice and recommendations. In the large format, two or three primary consultants advise the client in front of the room. The other participants form satellite teams of five to seven people. The site distinguishes the facilitator, the client, three central consultants and the participants. The participants listen to the consultation, then talk it over in satellite groups.
The book's small format
The Field Guide asks for groups of four or five chairs around small tables or in circles without tables. Each participant receives paper for notes. Everyone has the same time to ask for help and the same opportunity to give it.
In our view, each person writes down their statement in one minute before the first round. They note the three points that the book asks of the client in the large format: their problem, the status of the work in progress and the help they are looking for.
Each client has 15 minutes. The client presents their problem and request for help (2 min). The consultants ask the client clarifying questions (3 min). The client then turns their back on them and gets ready to take notes. The consultants ask questions and give advice and recommendations as a team (8 min). Finally, the client tells them what was useful and what they take away (2 min).
By our calculation, a group of five spends 75 minutes on its consultations and a group of four spends 60. The book allows groups of up to seven people.
The book's large format
The client and the primary consultants sit at the front of the room and speak into microphones. The satellite teams occupy groups of five to eight chairs around small tables or in circles. Each table receives paper and index cards for the recommendations. The book allows a projector only if it is indispensable.
The client has one hour. The invitation asks them to describe their problem, the status of the work in progress and the help they are looking for.
| Step and duration | Client | Primary consultants | Satellite teams |
|---|---|---|---|
| Selection (2 min) | Presents their question. Chooses the primary consultants. | Take their seats at the front of the room. | Listen. |
| Presentation (10 min) | Presents their problem and request for help. | Listen. | Listen. |
| Questions (10 min) | Answers. | Ask clarifying questions into the microphone. | Listen. |
| Advice (7 min) | Turns their back on the consultants and takes notes. | Build their advice and recommendations as a team over the microphones. | Follow the discussion. |
| Critique (10 min) | Turns around and talks with the primary consultants. | Talk with the client. | Critique the work of the primary consultants. Produce their own recommendations. |
| Gathering (10 min) | Receives the critiques, then the recommendations. | Listen. | A first round gathers one critique per team. A second round gathers one recommendation per team. No team repeats what another has said. |
| Feedback (2 min) | Says what was useful and what they take away. | Listen. | Listen. |
| Closing conversation (5 min) | The whole group reflects on the process, then on "So What?" and "Now What?". | ||
What, So What, Now What? supplies two of the questions in the closing conversation. The book lets the facilitator adjust each duration to the complexity of the problem and the size of the group. But it insists on keeping strictly to the schedule. According to the book, a second round is always better than a discussion that runs over. In our view, when the facilitator lets a small-format round run over, the last client in the group receives shortened advice.
The book gives three different numbers of primary consultants. The group configuration provides for two or three. The room plan reserves three chairs for them. The selection step names two to four. For the satellite teams, the book specifies five to seven people and five to eight chairs per table. In our view, three primary consultants fit all three figures.
The site's version
The site states about 25 to 55 minutes and a minimum of ten participants. Satellite groups of three to four chairs surround a central group of the same size. The room has no tables. Each participant receives paper. The steps stay on display throughout the session.
The facilitator reads the invitation and explains the procedure (1 min). Each person notes a problem they face (1 min). The facilitator chooses two or three volunteers who are ready to be clients. The first comes to the front of the room and chooses three central consultants.
A round lasts 20 minutes. The client presents their problem (2 min). The central consultants ask the client clarifying questions (2 min). The other participants observe. The client turns around and gets ready to take notes. The consultants give the client their best advice (7 min). They build on one another's ideas and pretend that the client is not listening. The participants then split into satellite groups of two to three people and share their observations (4 min). In plenary, a few participants say what everyone should hear (4 min). The client faces the room and says what they take away (1 min). The facilitator reminds the client to thank their consultants.
Each subsequent client goes through the same steps in 20 minutes. The site tells the facilitator to "be firm with timing". A 4-minute plenary closes the session. In it, a few participants say what Wise Crowds made possible for the clients and the consultants.
On the site, the room plan sets out satellite groups of three or four chairs. Yet the list of steps splits the other participants into groups of two to three people. By our calculation, the session lasts 26 minutes with one client, 46 with two and 66 with three. The site allows three clients but states 55 minutes at most. In our view, the facilitator plans 70 minutes for three clients or keeps to two.
Timing by source
| Element | Small format (book) | Large format (book) | Authors' site |
|---|---|---|---|
| Stated duration | 15 min per person | 1 h | About 25 to 55 min |
| Group | Groups of 4 or 5 people. Up to 7. One or more groups in parallel. | A whole room | At least 10 participants |
| Clients | Each member of the group in turn | One person | 1 to 3 clients from 2 or 3 volunteers |
| Consultants | The other 3 or 4 members of the group | 2 to 3 primary consultants. Satellite teams of 5 to 7 people. | 3 central consultants. The other participants observe. |
| Room | Chairs in fours or fives around small tables or in circles | The client's chair and 3 chairs at the front of the room. Tables of 5 to 8 chairs. Microphones and index cards. | Central group of 3 to 4 chairs surrounded by satellite groups. No tables. |
| Opening | None | Selection of the primary consultants (2 min) | Introduction (1 min). Individual reflection (1 min). |
| Presentation | 2 min | 10 min | 2 min |
| Questions | 3 min | 10 min | 2 min |
| Advice (client's back turned) | 8 min | 7 min | 7 min |
| After the advice | No step | Critique by the satellite teams (10 min). Gathering of the critiques and recommendations (10 min). | Satellite groups (4 min). Sharing in plenary (4 min). |
| Client feedback | 2 min | 2 min | 1 min |
| Closing | None | Whole-group conversation (5 min) | Plenary after the last client (4 min) |
| Calculated total | 15 min per client | 56 min | 26 min for one client. 46 for two. 66 for three. |
The client turns their back
In our view, the client who turns their back changes what the consultants say to one another. They talk among themselves instead of watching for the client's approval. The client can neither correct them nor justify themselves. The client notes how three or four people understand their problem. The consultants must therefore have understood this problem before the advice step: the clarifying questions serve that purpose.
Online, the client turns off their camera. According to the site, turning off the camera improves listening and focus.
Running the session
According to the Field Guide, the facilitator invites a very diverse group of people. Experts and leaders form only part of it. Everyone takes the client role: everybody has at least one problem. The facilitator also invites the participants to present complex problems without easy answers.
According to the Field Guide, the consultants take risks while keeping their empathy. To stay close to the client's direct experience, they ask: "What is happening here? How are you experiencing what is happening?"
According to the Field Guide, the participants critique themselves when they fall into a trap. Helping Heuristics gives the full list of behaviours to avoid when helping or asking for help. When the first round is weak, the facilitator runs a second one. The site invites creative adaptations in later rounds.
What makes Wise Crowds fail
Consultants who start advising during the clarifying questions answer a problem they have not understood. The book and the site list this premature advice among the traps.
In our view, a client who answers the consultants during the feedback, corrects them or justifies themselves cancels the effect of turning their back. That client then misses the purpose the book sets: to practise listening without defending. The client says only what was useful and what they take away.
In our view, a large-format client who picks the primary consultants from among close colleagues hears advice they already know.
Variations
In the questions-only variation, the consultants ask only open questions to which they themselves do not know the answer. These questions help the client gain clarity for themselves. The book forbids recommendations, advice disguised as a question and speeches. It calls this variation Q-Storming and compares it to the Quakers' Clearness Committees. The site takes up the variation. In our view, "Have you thought about…?" is typical disguised advice.
The site also proposes small groups of five to six people in which everyone is in turn client and consultant. It compares them to Troika Consulting.
For a virtual group, a few consultants first answer through the chat. The facilitator then opens the chat and the whiteboard to the whole group.
Wise Crowds and Troika Consulting
Troika Consulting follows the same sequence in threes: one client and two consultants. The book gives it 30 minutes for the three rounds. The small format of Wise Crowds brings three or four consultants to each client and gives each consultation 15 minutes. In our view, Wise Crowds gives each client more points of view. Troika Consulting takes less of the group's time.
Wise Crowds in strings
The Field Guide proposes stringing Wise Crowds with Helping Heuristics, "Heard, Seen, Respected", Nine Whys, Troika Consulting, What I Need From You and Appreciative Interviews. The site cites Helping Heuristics, Nine Whys and Talking with Pixies. According to the book, Helping Heuristics helps when Wise Crowds fails to reach its purpose, for example when participants fall into one of the behaviours to avoid. The Field Guide also proposes opening a Wise Crowds session with Nine Whys.
Chapter 6 places Wise Crowds in two strings. In the first, each group uses What I Need From You to clarify what it expects from the other functions. Each group then decides its next actions with a What, So What, Now What? debrief. Finally, the spokespeople of all the groups hold a Wise Crowds consultation in a Fishbowl. The book expects it to improve relationships and coordination between the groups. In the second, Critical Uncertainties produces strategies that stand up to an unpredictable future. Wise Crowds and 15% Solutions then give each person advice from several disciplines on implementing them.
In chapter 7, a leadership team retreat opens its third part with Wise Crowds and 15% Solutions. According to the book, these peer consultations deal with individual concerns first. They build the group's confidence and spark practical action.
When the participants in Creative Destruction (TRIZ in the book) have shared their actions, the Field Guide proposes continuing with Troika Consulting, Wise Crowds or Open Space.
In the 15% Solutions entry, the Field Guide lists Wise Crowds among the structures that fit with it. Integrated~Autonomy ends with action steps that the participants refine with 15% Solutions and with Wise Crowds or Troika Consulting.
AI considerations
Neither the book nor the site mentions AI. In our view, it helps before and after the consultation. During the consultation, it has no place.
The Field Guide counts the skill of asking for help among the structure's purposes. A client who has a language model write their request skips that exercise. In our view, the client writes the request themselves, then asks the model what is still unclear in it.
During the advice, the client hears the views of colleagues who know the organisation and its people. According to the book, the results last because the group produces them without outside expertise. An AI assistant consulted during the round would be outside expertise. It would also interrupt the conversation the client is listening to.
After the session, a model can take the recommendations copied from the satellite teams' index cards and group them by theme. Online, it summarises the whole-group chat for the client. The client decides what to keep.
A problem often involves colleagues or customers. Information that identifies them is personal data within the meaning of the Federal Act on Data Protection (FADP, Art. 5 let. a). Before entrusting their notes to an external AI service, the client removes the names and any detail that would make a person recognisable.
Examples
The following constructed case shows a client's sheet in the small format. During the advice, the consultants build on one another's ideas. The book provides no template for the sheet.
| Step | The client's sheet |
|---|---|
| Presentation (2 min) | The business signs my specifications without reading them. The gaps show up in user acceptance testing (UAT). How do I get my specifications reviewed before that test? |
| Questions (3 min) | "How many pages does a specification run to?" "What does the signature commit the signer to?" "Has the business ever reviewed a document that it then used?" |
| Advice (8 min) | 1. Tester: write the acceptance criteria with the business before the specification. 2. Product owner (building on idea 1): start from three customer complaints from the last quarter to write these criteria. 3. Lawyer: to the business, the signature releases the analyst from responsibility. So the business signs quickly to close the request. 4. Developer (building on idea 3): drop the signature. Replace it with a 30-minute session on three cases. |
| Feedback (2 min) | Useful: idea 3. I ask for a review and the business hears a request to release me from responsibility. I take away ideas 1 and 2 for the specification of the new mortgage form. I am submitting idea 4 to my project manager. |
Ideas 2 and 4 extend ideas 1 and 3. The client's first pick is idea 3, which describes her situation without proposing a solution.
Visualisations
A diagram shows a small-format consultation with its durations and the client's position at each step. A second diagram shows the large-format room. Tables carry the steps of the large format, the three published procedures and the client's sheet.
Cost
| Phase | Level | Justification |
|---|---|---|
| Preparation | Low (small format) · Medium (large format) | Small format: chairs in fours or fives and paper. Large format: a room set up for the satellite teams, microphones, index cards and a client who has prepared a ten-minute presentation. |
| Execution | Medium | 15 minutes per person. By our calculation, a group of four or five needs 60 to 75 minutes. One hour per client in the large format. About 25 to 55 minutes according to the site. |
| Documentation | Low | Each client keeps their notes. The large format adds the satellite teams' index cards. |
Tooling
The small format needs chairs in groups of four or five, paper and a timer that every group can see. The large format adds microphones for the client and the primary consultants. Each table receives 3-by-5-inch index cards (about 8 × 13 cm). The site displays the steps throughout the session.
In a remote session, Zoom or Microsoft Teams spotlights the central group's video and splits the participants into breakout rooms. In the book's virtual variation, the chat and a shared whiteboard collect the whole group's contributions.
Sources
Henri Lipmanowicz and Keith McCandless designed Wise Crowds. According to the book, the Quakers' Clearness Committees inspired it. The book is published under a Creative Commons BY-NC-SA 3.0 licence. The site publishes the structure's page under a BY-SA 4.0 licence.
- Henri Lipmanowicz, Keith McCandless, The Surprising Power of Liberating Structures: Simple Rules to Unleash a Culture of Innovation, 2013, ISBN 978-0-615-89337-2: the description of Wise Crowds in small and large format with its elements, its purposes, its tips, its variations, its examples and its attribution (Field Guide, part four); the structures to start with (chapter 5); the strings (chapter 6); the leadership team retreat (chapter 7); the entries Helping Heuristics, Nine Whys, TRIZ, 15% Solutions and Integrated~Autonomy (Field Guide).
- Wise Crowds, Liberating Structures: the site's version with its durations, its roles, its room, the minimum of ten participants, the online format, its variations, its string and the principle "Build Trust as You Go".

