Wireframes
A wireframe is a two-dimensional schematic of a screen or an interface page. It shows where each element sits, how much space it takes and the order of importance of the content. It leaves out colour, font choice and real images. Rectangles and lines stand for the navigation, the search, the headings, the text, the images, the fields and the buttons. Numbered notes describe the intended behaviour of each element. The team agrees on this structure before visual design and code, when a change still costs little. The Agile Extension to the BABOK Guide counts the wireframe among the formats of a backlog item beside the user story.
Goal
A wireframe settles the structure of a screen before its appearance. According to the 18F methods guide of the US federal government, it puts substance and the relationships between elements before decoration. The team uses it when it starts to define the solution.
It helps the team decide what a screen carries: which content and which functions, which come first and which screens it leads to. The deliverable is one annotated wireframe per screen type. The analyst also uses it to elicit interface requirements. A stakeholder corrects a drawn layout more easily than they describe a screen they have never seen.
Wireframe, paper prototype, storyboard
The sources classify the wireframe in two ways. The Nielsen Norman Group files it among low-fidelity prototypes. Digital.gov calls it a static prototype, then writes on the same page that prototypes show interaction where wireframes do not. The same page asks for prototypes that are quick to create and even quicker to throw away. 18F treats it on a method page separate from prototyping.
The three neighbouring techniques differ in how they are used: a wireframe is read, a paper prototype is tried out during a session, a storyboard is followed from one frame to the next.
| Technique | How it is used | Question asked | What comes out |
|---|---|---|---|
| Wireframe | the team reads and annotates it | What does this screen carry, where and with what priority? | a validated layout per screen type |
| Paper prototype | a user works through it while one person plays the computer | Does the user complete the task? | the difficulties observed |
| Storyboard | the team follows the frames in order | What happens from one step to the next? | a user path that the stakeholders discuss |
Usage
When to use it
- Eliciting interface requirements: give the stakeholders a layout to correct instead of a blank page.
- Disagreement on what comes first: the space each block takes makes the trade-off visible.
- Before visual design and code: settle the structure while a change is still a pencil stroke.
- Uncertain feasibility: put the structure to the developers from the first sketch.
- Backlog item about a screen: attach the wireframe to the user story or make it the item itself.
- Preparing a usability test: the validated wireframe supplies the screens of the paper or clickable prototype.
- Team spread over several sites: an online tool shares the wireframe and collects comments block by block.
- Stakeholders who hesitate to contradict: an unfinished sketch draws the criticism that a polished mock-up discourages.
When not to use it
- Specifying interaction or dynamic content: the wireframe shows a single state of the screen. Move to a wireflow or a clickable prototype.
- Verifying user behaviour: reading a screen does not prove that the user completes the task on it. Run a paper prototyping session.
- User tasks still unknown: the wireframe would arrange invented blocks. Elicit the scenarios first.
Description
What the wireframe settles
The Agile Extension glossary defines the wireframe as a two-dimensional illustration of a user interface. It covers the allocation of space, the priority of content, the available functions and the intended behaviour. The wireframe depicts a web or mobile screen. On each screen it settles the layout of the blocks, their size, their order of importance, the functions offered and the links to other screens. Size carries priority. Kelley Gordon treats size as a marker of importance and advises giving the largest block to the most important content.
According to the same glossary, a wireframe generally has no styling, no colour and no graphics. 18F also rules out the choice of fonts and any element that would distract the researcher or the reviewer. The content stays realistic. The Nielsen Norman Group advises against placeholder text such as Lorem Ipsum in wireframes and prototypes. A reviewer cannot judge the priority of a block whose content they cannot read.
Choosing the fidelity
Fidelity measures how closely the drawing resembles the final system. Kara Pernice breaks it down into interactivity, visuals and content. A wireframe is low fidelity in interactivity and in visuals. According to Gordon, its fidelity ranges from a quick sketch to a detailed drawing of the final screen.
A freehand sketch is enough to discuss the structure. Gordon recommends thick markers, a time limit and a small drawing surface to keep the team from dwelling on aesthetics. A messy sketch is normal at this stage. When the wireframe is the basis for the developers or for a test, the analyst draws the detailed version in a tool at the dimensions of the target screen.
According to Pernice, the designer is less attached to a sketch and changes it more willingly. The stakeholders see unfinished work in it and expect changes. Faced with a polished mock-up, a decision-maker more readily says "this looks good, let's launch it".
Preparing
The wireframe arranges content and functions that the analyst already knows. Before drawing, the analyst gathers the usage scenarios, the personas, the user stories for the screen and the inventory of the content to display. The 18F method has the wireframes reviewed with the scenarios and the personas in hand. They must therefore exist before the review.
The analyst then lists the screen types. The pages of a portal come down to a few screen types: home, list, detail, form, confirmation. Each type gets its own wireframe. The analyst also decides which formats get one: desktop, mobile or both. Each chosen format adds a set of wireframes to keep up to date.
Drawing a screen
- Set the frame. The analyst chooses the format of the target screen. For the web, Gordon cites the common sizes of 1024×768 and 1920×1080 pixels. On mobile, the target device sets the format. The analyst draws the browser or device frame around the screen to give context.
- Place the navigation and the search. A horizontal or vertical rectangle stands for the navigation bar where it sits on the screen. The search appears as a magnifier inside a field. An underline or a box marks the link to the current page.
- Draw the large elements. Headings, large banners, images and text blocks come next. A thick line stands for a heading. Thin lines stand for body text. A rectangle crossed by an X stands for an image.
- Add the details. Buttons, drop-down lists, checkboxes, radio buttons and input fields complete the screen. A flow of several screens adds progress bars and dialog boxes. A drop-down list appears as a rectangle and a caret. The analyst draws it open when its options matter for the discussion. Gordon asks for the selections to be shown and for the main call to action to carry a label.
With these conventions, a person who cannot draw sketches a wireframe that the whole team can read.
Annotating the behaviour
A wireframe shows one state of the screen. The intended behaviour goes into annotations. A number placed on the element points to a note. The note says what happens when the user acts, where a piece of data comes from, which rule applies and which requirement the element serves. It also describes the states that the drawing leaves out: the confirmation or the error message after an action and the empty screen ("No reimbursements" for a new policyholder). The numbering and the table of notes fit on one page. The team goes through it in a session.
The annotation separates the requirement from the drawn solution. "The home page shows the amount of the deductible used so far" is a requirement. The position of the block at the top right is a design choice that the visual designer can revisit. The analyst writes the first in the note and leaves the second open. Otherwise the layout of the wireframe becomes a requirement by default.
Reviewing with the team
While the team draws, 18F has it list the UX/UI patterns that the screen needs: filterable list, multi-step form, sortable table. The team reuses a pattern spotted on one screen on the others.
At the first review, the team walks through each scenario from screen to screen from the point of view of its personas. It notes each piece of information or function that is missing at a step. 18F asks: can the user complete their task with this wireframe? At the second review, the developers and the rest of the team judge whether the structure is feasible.
What the wireframe does not show
Page Laubheimer of the Nielsen Norman Group states where the wireframe reaches its limit. The wireframe shows a layout and describes interaction poorly. It suits sites made of distinct and mostly static pages, where a click leads to another page. It documents an application poorly when a few of its screens change their content with the user's actions: the filters of an online shop, a configurator, a mobile app.
For these screens, Laubheimer proposes the wireflow. A wireflow links wireframes with arrows. Each arrow starts from the element where the user acts and points to the resulting state on the same screen or on another one.
Who sees the wireframe
In 2015 Laubheimer published a survey of 86 UX professionals. The static wireframe was the deliverable they produced most: 71% of respondents created one often. For none of the audiences studied did it rank among the four deliverables judged most effective. Laubheimer concludes that designers produce it mainly for their own use. In 2024 Evan Sunwall keeps wireframes out of reviews with senior management: a person far from the project needs high visual and content fidelity to understand a screen.
The analyst therefore talks the wireframe through in a session with the people who know the tasks the screen supports. A management board sees a prototype or the visual design.
AI considerations
A language model fills the wireframe with realistic content. Sunwall proposes the promptframe for this. For each zone of the wireframe, the team documents the purpose of the content, its message, its length constraints and its tone. The model draws plausible text from it to replace the Lorem Ipsum before the review or the test. Sunwall asks for several variants per zone and warns that the generated content needs rework.
From the user stories, the model drafts the list of content and functions for the screen. It transcribes the photo of a whiteboard sketch into a list of blocks to redraw in the tool. It follows a scenario through the description of a wireframe and flags the information or the button missing at a step.
The stakeholders still decide the priority of the content. In 2024 Sunwall judged that AI design tools most often produce an incoherent assembly of common interface patterns that needs heavy rework. A generated layout reproduces the screens common in its training data rather than the priorities of the organisation.
A screenshot of a live system often contains personal data. The model generates fictitious test data in its place. A provider that processes personal data on behalf of the organisation is a processor (Art. 9 FADP). The organisation binds it by a contract. If the service processes the data outside Switzerland, Art. 16 FADP governs their disclosure abroad. The analyst checks that the organisation's AI policy authorises the tool before uploading a screenshot to it.
Examples
A health insurer redesigns the home page of its customer portal. The annotated wireframe of the desktop version expresses a priority decision: submitting an invoice comes before everything else.
| No. | Element | Behaviour or rule | Requirement |
|---|---|---|---|
| 1 | "Submit an invoice" button | Submits the photo or PDF dropped in the zone. The file may not exceed 10 MB. | REQ-12 |
| 2 | Latest reimbursements | Shows the last three invoices submitted and their status. "View all" opens the Reimbursements page. | REQ-15 |
| 3 | Deductible 2026 | Shows the amount of the annual deductible used so far and updates with each benefits statement. | REQ-21 |
| 4 | Language selector | Offers FR, DE and IT. The choice stays active at the next login. | REQ-03 |
The reviewer reads the decision in the space each block takes: submitting an invoice fills the largest block and the deductible gets a narrow column. Note 3 sets requirement REQ-21: the deductible appears on the home page. The position of the block in the column remains a design choice.
Visualisations
The same screen can be drawn at several levels of fidelity. The sketch places the blocks. The detailed wireframe adds the dimensions, the real labels and the state of the controls. The visual design adds colour, typography and images. It follows the wireframe.
Cost
| Phase | Level | Justification |
|---|---|---|
| Preparation | Low | The scenarios, the personas and the content inventory come from elicitation. Only the list of screen types remains to be drawn up. |
| Execution | Medium | One sketch per screen type takes one session. The detailed version and the two reviews take several days on a portal. |
| Documentation | Medium | The annotations keep up with every change to a screen until visual design. |
Tooling
Paper, thick markers and a whiteboard are enough for the sketch. Gordon recommends the thick marker: it stops the hand from polishing details. A photo of the whiteboard keeps a record of the session.
18F cites Balsamiq and OmniGraffle because they give digital wireframes the look of a sketch. They suit a team that shares and versions its wireframes.
Interface design tools such as Figma or Penpot suit a detailed wireframe that evolves into the visual design and the clickable prototype in the same file. Penpot is open source. An organisation can host it on its own servers when the screens show internal data. Diagrams.net and Visio offer libraries of interface shapes to a team that has no design tool.
Sources
- IIBA, Agile Extension to the BABOK Guide v2: the glossary entry "wireframes" gives the definition. §7.1 Backlog Refinement counts the wireframe among the formats of a backlog item.
- 18F, "Wireframing", 18F Methods: the purpose and the steps of the method. Online page.
- Gordon, K., "How to Draw a Wireframe (Even if You Can't Draw)", Nielsen Norman Group, 20 June 2021: fidelity, the drawing steps and their conventions. Online article.
- Gordon, K., "Visual Hierarchy in UX: Definition", Nielsen Norman Group, 17 January 2021: size as a marker of importance. Online article.
- Pernice, K., "UX Prototypes: Low Fidelity vs. High Fidelity", Nielsen Norman Group, 18 December 2016: the dimensions of fidelity and the effects of the sketch. Online article.
- Laubheimer, P., "Wireflows: A UX Deliverable for Workflows and Apps", Nielsen Norman Group, 4 December 2016: the wireflow and the limit of the wireframe with interaction. Online article.
- Laubheimer, P., "Which UX Deliverables Are Most Commonly Created and Shared?", Nielsen Norman Group, 18 October 2015: the survey of 86 professionals and realistic content. Online article.
- Sunwall, E., "Promptframes: Evolving the Wireframe for the Age of AI", Nielsen Norman Group, 17 May 2024: the promptframe, AI design tools and the audience of the wireframe. Online article.
- Digital.gov, "Prototypes": the wireframe as a static prototype and interaction as the criterion of a prototype. Online page.

