At the top, the template to complete: "How is it that we are … and we are … simultaneously?" Its two blanks carry the poles "integrated" and "autonomous". Below, two questions from the authors' book. A tilted balance goes with the question that leans to one side: "How does our effort to be ONE integrated organization squash local autonomy?" A level balance goes with the balanced question: "How is it that we are both integrated and autonomous in our current operations?"

Wicked Questions

Wicked Questions is a meeting structure in which a group names the paradoxes of its work. A paradox here means two forces that seem opposed and that the group must hold together to succeed. Each participant writes one as a question: "How is it that we are … and we are … simultaneously?" Small groups work on the questions. The room then keeps the strongest. The structure is one of the 33 original structures that Henri Lipmanowicz and Keith McCandless describe in The Surprising Power of Liberating Structures (2013). The book allots it 25 minutes. The authors' site gives about 30.

Goal

Wicked Questions turns a tension that the group endures into a question that it can work on. The question puts two opposing truths on an equal footing: "How is it that we are both integrated and autonomous?" The group stops choosing a side. It looks for ways to serve both poles.

The word wicked here means a tricky question: it has no simple answer and both of its poles stay valid. According to the authors' site, a question that is wicked enough draws an "arrrgh" from the group.

The book says that with Wicked Questions a group describes the messy reality of a situation while engaging its imagination. The structure helps the group develop strategies to move forward and avoid swings from one policy to its opposite. The group also uses it to evaluate a decision: does the decision advance one side only or both? The authors add that it reduces "yes, but…" and "either-or" thinking. It exposes the gap between the espoused strategy and the circumstances on the ground.

The structure produces a list of refined questions that the group displays in the room. This list is the only deliverable. In the site version, a vote picks the three questions that will move the work forward most. The group then works on the selected questions with another structure.

The business analyst uses Wicked Questions in a workshop where stakeholders defend requirements that pull in opposite directions: fewer steps for the user and stricter controls, a common process and local adaptations. The group names the tension before it prioritises. The Liberating Structures fiche shows you how to nest and string the structures together.

Usage

When to use it

  • Valid requirements that conflict: name the tension between two stakeholders before prioritising.
  • Repeated reversals (centralise, then decentralise): avoid these swings.
  • An official message that reality on the ground contradicts: the balanced form names the gap without accusing management.
  • Head office and local units: hold a common identity and local adaptation together.
  • A decision to evaluate: check that it serves both sides of the tension.
  • After a User Experience Fishbowl or a Shift & Share: continue with Wicked Questions.
  • A distributed team: post the questions in the chat and vote by reaction or by poll.

When not to use it

  • A question that a measurement can settle (volumes, lead times, error rates): look for the answer in metrics and KPIs or through document analysis.
  • A choice between two options that exclude each other (one supplier or the other): in our view the structure has nothing to reconcile. Compare the options in a decision matrix.

Description

The question

A wicked question joins two truths that seem to oppose each other. The group needs both of them. The book gives a template to complete: "How is it that we are … and we are … simultaneously?"

The book asks that the question set both sides next to each other in an appreciative form. The authors show the difference in their description of Integrated~Autonomy. This other structure applies the same logic to a single pair: central control and local freedom. The question "How does our effort to be ONE integrated organization squash local autonomy?" blames one side. The question "How is it that we are both integrated and autonomous in our current operations?" gives both sides the same weight.

How is it that we are integrated and we are autonomous simultaneously?
Leans to one side
How does our effort to be ONE integrated organization squash local autonomy?
Balanced
How is it that we are both integrated and autonomous in our current operations?
Questions from the authors' book (Integrated~Autonomy)
Both questions come from the authors' book. The first blames integration for squashing local autonomy. The second gives both poles the same weight.

According to the site, the question works best when a single word carries each truth. The two words have opposite meanings or connotations. The group tries other words until it gets the "arrrgh". The site's examples write these words in capitals: "How is it that we are being more STRUCTURED AND more LIBERATED in our interactions?"

The book rules out nasty questions that assign blame or lean to one side: "How can we focus on our customers when we are forced to spend more and more time on the headquarters' bureaucracy?" It also rules out the data question: more analysis answers it.

The elements of the structure

The authors describe each structure through five design elements. Their site revises the 2013 book version: the invitation, the group size and the steps change.

ElementBook (2013)Authors' site
Structuring invitation"What opposing-yet-complementary strategies do we need to pursue simultaneously in order to be successful?""Let's identify realities that make progress in our work challenging and rewarding." The group then looks for opposing forces that become complementary when it addresses them together. The invitation ends with the book's question
Space and materialsGroups of 4 to 6 chairs with or without small round tables. Paper for recordingGroups of four to six chairs with or without small tables. Paper for each participant. The examples and the template on display
How participation is distributedEveryone involved in the work or the topic. Everyone has an equal opportunity to contributeA host and the participants. Two participants at minimum. Everyone has an equal opportunity to contribute
How groups are configuredAlone, in small groups of six people or fewer, as a whole groupAlone, in groups of four to six, as a whole group
Question template"How is it that we are … and we are … simultaneously?""How is that we are ___ while simultaneously ___?"
Sequence of steps and time allocationFour steps of 5, 5, 5 and 10 min. The book states 25 minEight steps of 1, 3, 2, 2, 5, 10, 3 and 2 min. They add up to 28 min. The site states about 30 min
OnlineNot describedQuestions posted in the chat. Vote by reactions or by poll
The design elements of Wicked Questions according to the 2013 book and according to the authors' site.

The steps according to the site

  1. Introduction (1 min): the facilitator states the invitation. The group agrees on a shared challenge.
  2. Individual reflection (3 min): each person notes the difficulties and the opportunities that this challenge presents.
  3. Finding tensions (2 min): each person circles two truths that seem opposed or that are in creative tension.
  4. Presenting the template (2 min): the facilitator explains the form of the question and displays the examples.
  5. Drafting (5 min): each person writes a question with the template and their two circled truths.
  6. Refining in groups (10 min): groups of four to six help each person make their question more wicked. The group's "arrrgh" signals that it is.
  7. Sharing (3 min): in plenary, a few participants read out their most striking questions. The facilitator records them where everyone can see them.
  8. Vote (2 min): the group looks for the questions that will move its work forward most. Each person votes for the top three by applause or by "arrrgh".

The site adds steps 2 and 3 to the book's version. In our view the list of truths makes the first draft easier: the person starts from facts they know. In the book they start from the template. The site version therefore suits a group that is new to the structure. The book version suits a group that knows its tensions or whose session must fit into 25 minutes.

The book version

  1. Presentation (5 min): the facilitator introduces the notion of a wicked question and of paradox with a few examples. They give the template to complete with the two opposing strategies at play.
  2. Questions (5 min): first alone and then in small groups, each person writes the pairs of opposites at work in their job in the form of the question.
  3. Selection (5 min): each group chooses its strongest and most wicked question. All the groups read their choice to the room.
  4. Refining (10 min): the whole group picks out the strongest questions and refines them.

The book gives the refining step to the whole group. The site gives it to the small groups and has the whole group vote.

Whole groupAloneSmall groups
Book (2013): 25 min stated
Presentation5 min
Questions5 min
Selection5 min
Refining10 min
Alone then small groupsthen shared with the room
Authors' site: about 30 min stated28 min
1
3
2
2
Drafting5 min
Refining in groups10 min
3
2
IntroductionIndividual reflectionFinding tensionsPresenting the templateSharingVote
051015202530min
Book (2013): 25 min stated
  • PresentationWhole group5 min
  • QuestionsAlone then small groups5 min
  • SelectionSmall groups, then shared with the room5 min
  • RefiningWhole group10 min
Authors' site: about 30 min stated
  • IntroductionWhole group1 min
  • Individual reflectionAlone3 min
  • Finding tensionsAlone2 min
  • Presenting the templateWhole group2 min
  • DraftingAlone5 min
  • Refining in groupsSmall groups10 min
  • SharingWhole group3 min
  • VoteWhole group2 min
The two published sequences of Wicked Questions on a shared time axis. The book has four steps and states 25 minutes. The site has eight steps that add up to 28 minutes and states about 30. Refining takes 10 minutes in both versions: as a whole group in the book, in small groups on the site.

Running the session

For a requirements workshop, the facilitator prepares two or three varied examples from the participants' domain. These examples make the pairs accessible. The book gives examples for infection-control leaders who "have stepped up and stepped back" and for a global organisation that is "always and never the same". The site offers "DECIDING what to do while keeping all of our OPTIONS OPEN" and "making it SAFE to take bolder RISKS".

The facilitator works in quick cycles. An imperfect question improves in the next round. Participants can ask others to make their question more wicked. When a pair stays abstract, the facilitator asks: "When have you noticed these two things to be true at the same time?" The answer brings the question back to the participants' lived experience.

A few people often find the strongest questions. The facilitator lets them speak first. The others take their questions as models. If the group has no shared challenge, the site has each person work on their own.

Online

The site adapts the structure to a video conference with breakout rooms. At the sharing step, each participant posts one question in the chat. The vote uses reactions or a poll. According to the site, the chat or a shared whiteboard keeps a record of the questions and speeds up the work.

After the question

After a strong question, the facilitator follows with another structure. According to the authors, progress on any one wicked question can shift what is possible.

SourceStringPurpose
Book (Field Guide)Wicked Questions, then 15% Solutions (what each person has the freedom and the resources to do now) and 1-2-4-AllGenerate ideas and then sift them
Book (chapter 6)User Experience Fishbowl, then 1-2-4-All to write wicked questionsName the paradoxical goals that the group's next steps must address
Book (chapter 6)Shift & Share (spread good ideas and meet the people behind them), then Wicked Questions, then 1-2-4-AllBring innovative activities into the open, find the narrow path to more success, sort the follow-up activities
SiteWicked Questions, then 1-2-4-All, 25/10 Crowdsourcing (generate and sift a group's strongest ideas fast) and Critical Uncertainties (strategies for a range of plausible futures)Generate imaginative options and then sift them
The strings that the authors propose around Wicked Questions and their purpose.

The analyst files the selected questions with the workshop minutes. During prioritisation or in the decision matrix, they check whether each solution option advances one pole only or both. The book gives this test for evaluating a decision.

What makes Wicked Questions fail

Two words that do not oppose each other ("competent" and "motivated") draw no "arrrgh".

A list displayed on the wall and never revisited leaves the group where it was. The facilitator chooses the next structure while preparing the session.

A group that expects a solution in one session loses heart: there is no quick fix. The facilitator plans further rounds on the challenge over time.

The Memorial Health System case

In a story the book reports, Jonathan Velez runs IT at Memorial Health System. He names a pair without the template: "how to invite and insist on liberation throughout the department?" The book calls any pair that the group must hold together a wicked question. The template helps to write it.

Origin

The authors name professors Brenda Zimmerman and Scott Kelso as their inspiration. Brenda Zimmerman wrote Edgeware with Curt Lindberg and Paul Plsek. Scott Kelso wrote The Complementary Nature with David Engstrøm. That book argues that pairs such as individual and collective are complementary.

Management research also studies these lasting tensions. Wendy Smith and Marianne Lewis (2011) observe that contradictory demands intensify in global, dynamic and competitive environments. Their model shows how cyclical responses to paradoxical tensions enable an organisation to last.

AI considerations

A language model helps the facilitator prepare varied examples. The facilitator gives it the workshop's domain. It proposes pairs of opposing words, then questions built on the template. The facilitator keeps those whose two poles are true for this group. They discard those that assign blame.

During the refining step, a participant can ask the model to reword a question that leans to one side. The model can put both poles in an appreciative form and suggest words with stronger connotations. It cannot test the "arrrgh": only the group's reaction tells whether the question hits home.

The model does not replace the list of truths. On a project that it knows only through its prompt, it proposes generic tensions: cost and deadline, speed and rigour. The truths that the site has participants write down come from their experience. They carry the tensions specific to the organisation.

Online, the model can group the questions from the chat and flag duplicates before the vote. The questions often name departments or people in tension. The facilitator removes these names before sending the chat to an external AI service.

Examples

Wicked Questions leaves a list of refined questions.

Author's departmentFirst draftRefined questionRank in the vote
Client advisory"How is it that our customers want to do everything themselves?""How is it that our customers are both SELF-RELIANT and SUPPORTED?"1
IT security"How does our concern for simplicity weaken security?""How is it that the app is both SIMPLER and more SECURE?"2
Customer service"How is it that we are keeping the old e-banking while we launch the new app?""How is it that we are KEEPING the old e-banking while LEAVING it?"3
Development"How can we release every month when customers complain about every change?""How is it that the app CHANGES every month and stays FAMILIAR to our customers?"Not selected
Marketing"How is it that we offer an app that is identical for everyone and tailored to each customer?""How is it that we offer the SAME app to everyone and a TAILORED app to each customer?"Not selected
Constructed case. A cantonal bank is replacing its mobile app. Twenty-six employees from five departments open the requirements workshop with Wicked Questions. The flipchart records the questions that five participants read out at the sharing step. It also records the rank of the three questions selected in the vote. The "First draft" column shows the question that each author wrote alone before the refining step.

Refining reduces each first draft to two opposing words. The bank wants both. The question ranked first goes into a 1-2-4-All. There the group looks for ways to support self-reliant customers.

Visualisations

One diagram sets a question that leans to one side against a balanced question. A second diagram places the two published sequences on a shared time axis. Tables carry the comparison of the two versions, the strings and the flipchart of the example.

Cost

PhaseLevelJustification
PreparationLowWrite the invitation, prepare two or three examples from the group's domain and display the template.
ExecutionLow25 minutes according to the book and about 30 according to the site. Further rounds over the course of the project if the challenge calls for them.
DocumentationLowThe displayed list of questions and a photo of it.

Tooling

In the room, each person gets paper. The template and the examples stay on display on a flipchart or a screen. A visible timer keeps the steps on time. A second flipchart receives the questions from the sharing step and the vote.

Remotely, the facilitator uses a video conference with breakout rooms (Zoom, Microsoft Teams). The group votes in a built-in poll or on a shared whiteboard (Miro, Mural).

Sources

Henri Lipmanowicz and Keith McCandless designed Wicked Questions. The book is published under a Creative Commons BY-NC-SA 3.0 licence. The site publishes the structures under a CC BY-SA 4.0 licence.