What I Need From You (WINFY)
What I Need From You (WINFY) is a meeting structure in which groups from different functions put their needs to each other as requests. Each group writes its priority requests with the sentence stem "What I need from you is…". Its spokesperson states them to the other spokespeople gathered in a circle at the centre of the room. Each function then answers each request with one of the four allowed answers without discussion or explanation. Henri Lipmanowicz and Keith McCandless designed the structure and describe it in The Surprising Power of Liberating Structures (2013). According to the book, the session lasts 55 to 70 minutes.
Goal
What I Need From You is a facilitation structure in which each function asks the others for what it needs to reach a common goal. It receives a clear answer to each request.
According to the book, people from different functions and disciplines improve how they ask each other for what they need. The structure can clear up misunderstandings and prejudices that have built up over time. Each person a request is addressed to gets the chance to answer it. According to the authors' site, the groups learn to balance their needs against the shared goals.
The structure produces the list of requests between functions and the answer to each one. It sets neither the priority of the accepted requests nor the way to carry them out. The What, So What, Now What? debrief that closes it identifies the next actions.
In our view, the requests that functions exchange show the business analyst the dependencies a cross-functional project must manage. A dated yes becomes a dependency to track in the schedule. A no becomes a risk the sponsor decides on. A whatever signals a poorly framed need that the analyst takes up in an interview. You will find the other structures of the repertoire under Liberating Structures.
Usage
When to use it
- Strained relations between functions that complain about each other: turn the complaints into requests that the other function can answer.
- A strategy that demands close cooperation between functions: focus one day of a retreat on a single cross-functional problem.
- Leaders who give inconsistent instructions: the leaders first tell each other what each one expects from the others.
- An initiative that needs several specialities to work together: each speciality asks the others for what it needs to launch the initiative.
- Annual planning in a company that operates in several countries: the functions settle what they expect from each other for the next financial year.
- A team of interdependent people: the same sequence works with people in place of functions.
- A distributed team: according to the site, the structure moves online if the facilitator prepares the breakout rooms and the whiteboards.
When not to use it
- Functions without a common goal: the requests have no goal to measure themselves against. Clarify the goal first with Nine Whys.
- A climate where a public refusal exposes the person who gives it: in our view, no spokesperson will say no in front of their superiors. Collect the needs in individual interviews.
Description
The invitation
The facilitator invites the participants to ask the other functions directly for what they need to reach a specific goal. The facilitator also invites them to practise answering the requests of others without ambiguity.
The facilitator can read the invitation in our wording: "Each group will ask the other functions for what it needs to reach [the common goal]. Everyone will also practise giving clear answers to the requests they receive."
The request
A request uses the sentence stem from the sources: "What I need from you is ___". In a French-speaking room, the group can write "Ce dont j'ai besoin de votre part, c'est…". According to the book, only a clear and specific request can receive an unambiguous yes or no. According to the site, a good request is specific, concrete, actionable, relevant and timely. It may set a deadline. In our view, a request that the other function can accept or refuse names what it expects, from whom and by when.
The allowed answers
The person who receives a request may give only four answers. The two sources give two different lists.
| Answer | 2013 book | Authors' site |
|---|---|---|
| yes | Allowed | Allowed |
| no | Allowed | Allowed |
| I will try | Allowed | Not listed |
| huh? | Not listed | Allowed: the request was too vague |
| whatever | Allowed: the request was too vague for a precise answer | Allowed: the request is not relevant or does not deserve the group's attention |
On the site, huh? takes the meaning "too vague" that the book gives to whatever. The site uses whatever to set aside a request of no interest to the group. The site's list has no I will try. The facilitator displays the chosen list and the meaning of each answer before the requests. In our view, the facilitator writes the list in the language of the room. In a French-speaking room, the book's list reads "oui", "non", "je vais essayer" and "trop vague".
The room and the groups
The book and the site call for a large room with three to seven groups. Each function forms one group. The groups can be any size. Each group appoints a spokesperson. At the centre of the room, a circle of three to seven chairs seats the spokespeople. The book has the facilitator provide paper. The site asks for sticky notes and pens. It also asks the facilitator to display the room layout.
The book's figure and the site's caption call this circle a Fishbowl: the spokespeople speak in it and the other participants listen from their group.
The site distinguishes the roles of facilitator, spokesperson and participant. According to the book, each participant contributes on equal terms within their group.
In our view, each group appoints a spokesperson who can commit the function. A yes from someone who controls neither the budget nor the people does not hold after the session.
The book limits the structure to seven functions: beyond that, the exchange gets too muddled. In our view, a facilitator with more functions merges related ones or runs several sessions.
The sequence according to the book
- The facilitator explains the steps and restates the goal or the problem at hand so that everyone shares the same context. The facilitator states that a request must be clear and specific to receive an unambiguous yes or no. The facilitator announces the allowed answers: yes, no, I will try and whatever. Then the facilitator places the groups around the room. 3 min.
- With 1-2-4-All or 1-2-All, each group lists its priority needs from each of the other functions. It phrases each need as a request with the sentence stem "What I need from you is ___". It cuts its list to two priority needs, writes them down and appoints its spokesperson. 5 to 15 min.
- The spokespeople gather in a circle at the centre of the room.
- In turn, each spokesperson states their two needs to each of the other spokespeople. The others note the requests they receive. Nobody answers. 15 min.
- Alone or with their group, each spokesperson writes an answer to each request received. 5 to 10 min.
- Each spokesperson addresses the other spokespeople one after another. The spokesperson repeats the requests each one made and then gives the answers. The book insists: "No discussion! No elaboration!" 10 min.
- The whole group debriefs with What, So What, Now What? 15 min.
The sequence according to the site
The site splits the explanation. The facilitator shares the invitation and the goal. Two or three participants clarify the context. The facilitator displays the allowed answers and explains what makes a good request.
Each group keeps one or two requests and writes them on sticky notes. All participants gather in plenary. The facilitator displays and explains the allowed answers again. The spokespeople take their places at the centre and state their requests one after another. The spokespeople who listen note each request without answering. All participants return to their group to decide the answers. The group copies each request received onto a sticky note and writes its answer on another. The spokespeople come back to the centre and give their answers without explanation.
The timing by source
| Step | 2013 book | Authors' site |
|---|---|---|
| Invitation and goal | Part of the explanation | 1 min |
| Context clarified by participants | None | 2 min |
| Explanation of the steps and the answers | 3 min | 2 min |
| Needs listed in groups | 5 to 15 min | 10 to 20 min |
| Requests stated at the centre | 15 min | 15 to 20 min |
| Answers decided | 5 to 10 min, alone or in a group | 5 to 15 min, in groups |
| Answers given at the centre | 10 min | 10 min |
| What, So What, Now What? debrief | 15 min | 15 to 20 min |
| Sum of the steps | 53 to 68 min | 60 to 90 min |
| Stated duration | 55 to 70 min | None |
The rules the facilitator enforces
Nobody answers a request on hearing it. Nobody explains their answer. The facilitator enforces these rules strictly. The facilitator reminds the room what the answer for a too-vague request means.
The book encourages everyone to ask for what they need to succeed. It invites people to have fun and to accept some tension as long as it stays safe. According to the site, the facilitator prepares the participants for harsh feedback.
The debrief
According to the book, the facilitator helps the group see that people are good at complaining and poor at asking for what they need. The facilitator also asks the participants what nobody asked for: a contribution that would help the group reach its goal.
If too many requests remain vague or open after one round, the facilitator runs a second round.
Online
Only the site describes the online version. The facilitator prepares the breakout rooms and the whiteboards. In a visual collaboration space, the facilitator asks the groups not to look at each other's work. In plenary, the facilitator spotlights the video of the spokespeople. The other participants switch off their cameras.
What makes What I Need From You fail
In our view, a spokesperson who explains their no reopens the discussion that the structure rules out. The refusal turns into a negotiation. The next requests wait. The facilitator interrupts and reminds the room of the book's rule: "No discussion! No elaboration!"
A vague request receives whatever in the book and huh? on the site. In the book, coach and consultant Neil McCarthy describes what happens without the structure: a long discussion waters the request down until accepting it becomes the easy way to end the exchange. The book concludes that what looks like a yes becomes a whatever in practice. The group that receives whatever or huh? rephrases its request for the second round.
A group that states its grievances against another function receives no usable answer. "Orders always arrive late" is a complaint. "What I need from you is for every order entered before 15:00 to reach the warehouse before 16:00" is a request. The book presents the structure as a shift from complaint to request.
According to the book, the structure also fails when participants fall back into unwanted ways of asking for help or offering it. The book then proposes Helping Heuristics.
In our view, a yes with no owner and no deadline fades after the session. The facilitator records each answer in a register that the debrief works from.
Variants
The same sequence applies to a small group or to a team of interdependent people. Each person addresses personal requests to the others. The book also uses the structure to improve a working relationship between two people.
What I Need From You in strings
| Source | String | Role of What I Need From You |
|---|---|---|
| Chapter 6 of the book | What I Need From You, then What, So What, Now What? in each group, then Wise Crowds in a Fishbowl between spokespeople | Each group clarifies its needs from the other functions and learns what support it can expect. |
| Chapter 7 of the book: retreat of a leadership team | Wise Crowds, 15% Solutions, 25/10 Crowd Sourcing and Ecocycle, then What I Need From You, then What, So What, Now What? | The group focuses on a problem that demands close cooperation between functions. |
| Variants of the structure in the book | Helping Heuristics, Integrated~Autonomy, Appreciative Interviews and Ecocycle | – |
| Authors' site | Integrated~Autonomy, Purpose-to-Practice and Ecocycle Planning | The string produces a strategy and puts it into practice. |
AI considerations
The book and the site say nothing about AI.
In our view, a language model can test each request of step 2 against the criteria of the site. It flags "better communication" as too vague to receive a yes or a no. The group rephrases the request itself. The model does not know the actual need and must not invent it.
In the circle, no model plays a role. The answer commits the function that receives the request. Its spokesperson gives it.
After the session, a model can transcribe the photos of the sticky notes into a register: requesting function, answering function, request, answer. It isolates the whatever and huh? answers to rephrase in a later session. The requests often concern budgets, headcount or internal projects. The facilitator gives them to an AI service that the organisation approves for this data.
Examples
The structure produces the register of answers: one answer for each request. A precise request receives yes, no or I will try. A vague request receives whatever.
| From | Request: "What I need from you is…" | Answer |
|---|---|---|
| Common goal: open the online ordering portal on 1 March. | ||
| Logistics | …for the portal to send every order entered before 15:00 to the warehouse before 16:00 from 1 March. | yes |
| Logistics | …better communication about your changes. | whatever |
| Sales | …for the portal to show the available stock of each item from 1 March. | I will try |
| Sales | …for the portal to accept payment by QR-bill from 1 March. | no |
| Logistics (second round) | …for you to announce each production release of the portal to the warehouse five working days in advance. | yes |
The vague request from Logistics receives whatever. Its second-round version names what is asked, who acts and by when. It receives yes. The no on the QR-bill is also a result: Sales learn during the session that they need another payment method for the launch.
Visualisations
One diagram shows the room: the groups by function around the circle of spokespeople and the allowed answers according to each source. A second diagram shows the back-and-forth between the groups and the circle. The answers by source, the timing, the strings and the register of answers fit in rows and columns.
Cost
| Phase | Level | Justification |
|---|---|---|
| Preparation | Medium | Set the common goal, choose three to seven functions and bring their members together. Display the allowed answers. |
| Execution | Medium | 55 to 70 minutes according to the book. All the functions sit in the same room. |
| Documentation | Low | The requests and answers written during the session form the register. |
Tooling
A large room holds the groups. A circle of chairs at the centre holds the spokespeople. The groups write on paper according to the book or on sticky notes according to the site. A poster shows the allowed answers and their meaning. The book suggests question-and-response cards to sharpen the requests.
Remotely, Zoom or Microsoft Teams split the groups into breakout rooms and spotlight the video of the spokespeople. A shared whiteboard such as Miro or Mural replaces the sticky notes. A spreadsheet is enough for the register of answers.
Sources
According to the book, the structure draws on the work of consultant Kathie Dannemiller and professor Dan Pesut.
- Henri Lipmanowicz, Keith McCandless, The Surprising Power of Liberating Structures: Simple Rules to Unleash a Culture of Innovation, 2013, ISBN 978-0-615-89337-2: the description of What I Need From You with its invitation, steps, purposes, tips, variants, examples and attribution (Field Guide, part four); the account of Neil McCarthy (part three); the strings of chapters 6 and 7; the cross-references from Helping Heuristics.
- What I Need from You (WINFY), Liberating Structures: the site's version with its invitation, roles, steps, durations, answer diagram, online facilitation and variants.

