Your Training Partner
Techniques Toolbox
Invented warehouse example. At the top sits the statement to test: "The application is too slow." On the left, nine verbatims each carry the person's role and the source. In the centre, eight of them form three themes with their hypothesis: "The scanner loses the network", "No code for substitutions" and "The order follows the shelves". Only one person mentioned the size of the screen. That remark stays off-theme.

Verbatim Mapping

Verbatim Mapping is a listening technique that tests a problem statement before the team looks for a solution. The analyst records word for word the phrases that the people concerned repeat in meetings, in interviews or in old minutes. They group these verbatims into themes and write one hypothesis per theme. From the themes they draw the next steps: what to explore, what to understand and what can already be fixed. The themes then enter the stakeholder map and the empathy map as speech bubbles. George W. Anderson describes the technique in Design Thinking for Tech (2023).

Purpose

Verbatim Mapping holds a problem statement up against the exact words of the people who live with the problem. A verbatim is the word-for-word quotation of a sentence, a story or a remark, spoken or written. Anderson includes complaints as well as good news and insights. In his view, the themes hidden in the verbatims can explain why, when, where, how and with whom the problem occurs.

Anderson places the technique among four lightweight techniques that validate a problem. The other three are the Five Whys, AEIOU and Pattern Matching. It comes after the problem statement is written and before ideation. It prepares a decision: does the statement hold, does it need correcting, what must the team learn before acting?

It delivers the verbatim log, the themes with their hypotheses, the next steps and the speech bubbles added to the maps. Anderson names no deliverables. This list follows from his steps.

Usage

When to use it

  • Problem statement to test: hold it against the words of the people affected before ideation.
  • Problem framed by a single stakeholder: the verbatims show whether the people on the ground describe it in the same terms.
  • Minutes and notes available: past reports supply verbatims without a new session.
  • Listening sessions already planned: interviews, workshops or sprint reviews supply verbatims without an extra meeting.
  • Stakeholder or empathy maps to complete: the themes enter them as speech bubbles with their source.
  • Scope to confirm: check the users' needs and priorities with them before freezing the scope.
  • Change to justify: the verbatims show the problems behind the change to the people it affects.
  • Distributed team: with the participants' consent, the transcript of a video call supplies the word-for-word text.

When not to use it

  • People hold back even one to one: send out an anonymous questionnaire.
  • Statement already confirmed by measurements: the validation is done; trace the causes with the Five Whys.

Description

What the analyst records

Anderson asks the analyst to note the spoken and written words and phrases that recur. A message in a team channel or a note on a board counts as much as a sentence spoken in a meeting. The analyst writes the sentence down without correcting or summarising it.

The log keeps the positive remarks. A sentence such as "I walk less than before" tells the team what the next version must keep. A log made of complaints alone pushes the team to change everything.

The analyst's comment goes in its own column. For test feedback, Anderson asks that the log show who said what when the team adds its comments. A separate column guarantees this. The same rule holds for the verbatim log. A log where interpretation mixes with the quotations no longer tests anything.

Columns of the verbatim log. Proposed format and invented example.
ColumnContentExample
No.Sequence number. A theme cites the numbers of its verbatims.2
VerbatimThe sentence word for word in quotation marks."In aisle 14 I scan three times before it goes through."
WhoThe person's role. The name stays in the analyst's notes.Picker C
Source and dateThe meeting, the interview or the document and its date.Team meeting 14.04
CommentWhat the analyst saw or understood. Never in the Verbatim column.He points to aisle 14 on the warehouse floor plan. The network looks like the cause.

Where to find verbatims

Anderson names meetings, stories and listening sessions. Elsewhere he describes two forms of listening session. In Silence by Design the analyst leaves silences unfilled: the other person fills them with what is on their mind. In Supervillain Monologuing the analyst invites someone who knows the history to set out their view at length. The analyst prompts them without contradicting them.

Old notes and minutes show how the problem has evolved. A sentence that recurs in three successive sets of minutes weighs more than a complaint from this week.

When people hold back in front of their managers, the analyst collects the verbatims in individual interviews. In a multilingual team the analyst notes each sentence in the language in which it was spoken. The translation goes in the Comment column so that the theme rests on the original words.

Participants and duration

Anderson allows for one to three people and 15 to 30 minutes per person or per meeting assessed. The duration grows when there are many documents. The split of roles comes from our practice. With two people, one facilitates and the other takes notes. With three, two people take notes and then compare their logs. When a sentence appears in only one log, the analyst checks it against the recording or with the person who said it.

The steps

The steps are Anderson's. The guidance that goes with them is our reading.

  1. Inform. Before the session the analyst tells the person or the team that their words will be written down. Anderson cites privacy. The analyst also says who will read the log.
  2. Note word for word. The analyst records the spoken or written words and phrases that recur. For each one they note the person and the source.
  3. Group live. In a live session the analyst can already bring similar sentences together. When the analyst works from past notes, they move straight to step 4.
  4. Form the themes. After the session the analyst groups the repeated phrases into themes. Anderson gives the affinity map (Affinity Clustering) as an example. Each theme takes its name from the participants' words.
  5. Write one hypothesis per theme. The analyst writes down what they think explains the theme. Anderson speaks of a personal hypothesis.
  6. List the next steps. Anderson sorts the next steps into what needs exploring, what needs learning or understanding and the points where the team knows enough to start a first action or a fix.
  7. Place the themes on the maps. Each theme enters the Stakeholder+ Map and the empathy map as a speech bubble. It attaches to the people or teams who expressed it.

The Stakeholder+ Map is Anderson's variant of the stakeholder map. Each stakeholder on it carries thought bubbles and speech bubbles. Thought bubbles say what the team believes the stakeholder thinks. Speech bubbles say what the stakeholder said. On the empathy map the themes go in the "Says" zone.

Before and after the technique

The log then feeds Pattern Matching, which Anderson describes in the same section. Pattern Matching looks for recurring themes in a set of data. Anderson lists its sources: documented incidents, earlier interviews and Verbatim Mapping exercises, observations, listening sessions, risk reviews and minutes. These other sources confirm or contradict each theme in the log. Once a theme is confirmed, the Five Whys trace it back to its cause. When the change arrives later, Anderson uses the verbatims again to explain its purpose to the people affected.

Pitfalls

Anderson names no pitfalls specific to the technique. These come from our practice.

The reworded quotation. A summarised sentence carries the analyst's vocabulary. The theme then reflects what the analyst already thought. The analyst notes the exact sentence even when it is clumsy. They flag every word they missed.

The loud voice taken for a theme. A person who repeats the same complaint five times produces five lines and one opinion. The analyst counts people, not occurrences. A theme brings together at least two people. A remark from one person stays off-theme in the log.

The missing voices. The log holds only what the people present said. The night shift, a partner department or the customers are often missing. A stakeholder absent from the Who column has not been heard. On the map that stakeholder has no bubble. The analyst holds one more session before concluding.

The hypothesis taken for a finding. If the analyst reports a hypothesis to the steering committee without marking it, the committee bases its decision on a guess. The hypothesis stays in the log with the next step that tests it.

AI considerations

A transcription tool supplies the word-for-word text and the time of each passage. At step 1 the analyst also announces the recording and the transcript. Automatic transcription of a meeting held in Swiss German produces Standard German. The resulting text is a translation. The analyst marks those lines or writes down the dialect sentence by hand. A language model then counts the sentences that recur from one transcript to the next. It proposes groupings. For each grouping it cites the sentences, their speakers and the times.

By default a model summarises and rewords. It can also invent a quotation. The analyst enters in the log only the sentences they find in the transcript. The model does not know the context of a sentence: "it crawls" can mean the network for one speaker and the procedure for another. The analyst decides on each grouping. The hypotheses and the next steps stay with the team, which knows the work on the ground.

Transcripts contain names and opinions about colleagues or management. The analyst submits them to a service that the organisation has approved. For any other service they first remove the names and the passages that identify a person.

Examples

The case is invented. A regional warehouse has introduced a scanning app for order picking. The logistics manager wrote in the minutes: "The application is too slow." The analyst records the verbatims from a team meeting, from the project minutes and from a listening session with two pickers.

Statement to test"The application is too slow."Logistics managerProject minutes 21.03
1"The scanner loses the network at the back of the warehouse."Picker Alistening session 16.04
2"In aisle 14 I scan three times before it goes through."Picker Cteam meeting 14.04
3"The app crawls in aisles 12 to 16."Team leaderProject minutes 21.03
The scanner loses the network123
Hypothesis: Wi-Fi coverage is missing in aisles 12 to 16.
4"When the item is missing I don't know what to scan."Picker Cteam meeting 14.04
5"The substitute product has no code in the app."Picker Blistening session 16.04
6"They're getting the paper sheets out again for substitutions."Team leaderteam meeting 14.04
No code for substitutions456
Hypothesis: the app offers no scan for a substitute item. The paper causes the errors.
7"The order of the items finally follows the shelves."Picker Alistening session 16.04
8"I walk less than before."Picker Blistening session 16.04
The order follows the shelves78
Hypothesis: the new picking order shortens the walking routes.
Off-theme: one person only
9"The screen is too small."Picker Cteam meeting 14.04
Invented example. The logistics manager's statement speaks of slowness. The verbatims from three sources form three themes: "The scanner loses the network", "No code for substitutions" and "The order follows the shelves". A remark made by one person only stays off-theme.

The remark about the screen stays off-theme: only one person made it. The verbatims shift the statement. The only verbatim that speaks of slowness places it in aisles 12 to 16. The pickers talk about a scanner that loses the network at the back of the warehouse and about substitutions without a code. They welcome the new picking route.

Next steps for the warehouse. Proposed format and invented example.
ThemeType of stepNext stepWho
The scanner loses the networkActInstall a temporary Wi-Fi repeater in aisles 12 to 16. Compare the repeated scans of the week before and the week after.IT department
No code for substitutionsUnderstandIn the warehouse management system, count the share of picking errors that involve a substituted item.Analyst
No code for substitutionsExploreObserve a team during a peak in stock-outs. Note how it handles each substitution.Analyst and team leader
The order follows the shelvesActRecord the current picking order as a requirement for the next version.Analyst

At step 7 each theme joins the map as a speech bubble.

Project team: scanning app
Pickers
The scanner loses the network
No code for substitutions
The order follows the shelves
Team leader
The scanner loses the network
No code for substitutions
IT departmentNo verbatim
Invented example. Extract from the warehouse's Stakeholder+ Map after step 7. Each theme attaches as a speech bubble to the people who expressed it. The IT department carries no bubble: nobody heard from it.

The IT department carries no bubble. Nobody heard from it. Yet it installs the repeater.

Visualisations

The theme diagram shows how repeated phrases form the themes and their hypotheses. It leaves the isolated remark off-theme. The next-steps table shows step 6. The map shows step 7.

Cost

PhaseLevelJustification
PreparationLowInform the people, gather the minutes, prepare the log.
ExecutionLowOne to three people, 15 to 30 minutes per person or per meeting according to Anderson.
DocumentationMediumRecording word for word takes time. The themes, hypotheses, next steps and map updates come on top.

Tooling

A notebook or a laptop is enough for taking notes in a session. With the participants' consent, transcription in Teams or Zoom gives the word-for-word text of a video call. A spreadsheet holds the log. Beyond about ten transcripts, qualitative analysis software (MAXQDA, ATLAS.ti, NVivo) keeps each theme linked to its passages. The team forms the themes on a whiteboard with sticky notes or on an online whiteboard (Miro, Mural). The same board holds the Stakeholder+ Map and the empathy map.

Sources

  • George W. Anderson, Design Thinking for Tech: Solving Problems and Realizing Value in 24 Hours, Addison-Wesley, 2023, ISBN 978-0-13-793303-7. Hour 9 "Identifying the Right Problem", section "Design Thinking in Action: Verbatim Mapping", pp. 125-126: the definition, the sources of verbatims, the participants and the duration, the seven steps. Same chapter, "Pattern Matching for Themes": verbatims as input data. Hour 6: Silence by Design and Supervillain Monologuing. Hour 7: the Stakeholder+ Map. Hour 19, section "Testing Tools for Feedback": the instruction to show who said what. Hour 23, section "Techniques for Providing Purpose": verbatims that justify a change. Hour 24, section "Managing Scope": the technique for confirming scope.

Anderson gives no log format, no pitfalls and no grouping example: the log, the pitfalls and the warehouse case are our constructions.

Vendor Assessment
All techniques
Virtual Teams and Colocation