TWI Job Methods
Job Methods (JM, also Job Methods Training) is the four-step method that the American Training Within Industry (TWI) programme taught supervisors from 1942 to improve their own work. The supervisor breaks the present method down into details and questions each one. He eliminates, combines, rearranges and simplifies the details. Then he writes up a proposal and gets it approved before he applies it. The method fits on a pocket card. Its authors took the principles of work simplification and stripped out the engineering jargon.
Goal
Job Methods is a procedure for improving work methods. The first-line supervisor runs it himself on the jobs in his own department. The TWI Report sets it one objective: to help the supervisor produce greater quantities of quality products in less time with the manpower, machines and materials available.
Before Job Methods, methods engineers studied the jobs and decided on the improvements. Apart from the suggestion boxes, nobody else took this on. Yet the supervisor knows the work and the operators. He sees the small details that a visiting engineer misses. Job Methods gives him a short procedure that he applies without engineering training.
The method answers one question: which new method should this job adopt? It delivers a written proposal that contains the breakdown of the present method and the breakdown of the proposed method. It names the people who helped. After approval, the supervisor puts the new method to work. It stays in place until a better one replaces it.
In the demonstration case, the Report credits the gain to eliminating unnecessary details and rules out a speed-up. The TWI trainer showed this at the end of the first session: he acted out the present method at high speed. The errors multiplied.
Usage
When to use it
- Repetitive work that can be observed at the workstation: the supervisor breaks down what he sees done every day.
- Higher volume without new equipment: the method looks for the gain in the resources already in place.
- Jobs loaded with walking, handling and rework: the breakdown makes every unnecessary detail visible.
- A method to lock in as standardised work: Job Methods finds the best method; the standard locks it in at the workstation.
- Improvement ideas rejected as incomplete: the supervisor checks the proposal with the operator and the other supervisors and submits it in writing.
- Routine clerical work: according to the Report, a supervisor improves an office method the same way as a shop operation.
- Repetitive back-office work to analyse: the business analyst runs the method with the supervisor in charge of the job. The present breakdown gives the analyst the as-is picture.
When not to use it
- A gain that requires new machines or a new layout: the card aims at small improvements; hand the redesign to an engineering project.
- A defect whose cause is unknown: Job Methods improves a method and diagnoses nothing; start from a root cause analysis.
Description
Where the method comes from
Training Within Industry was a United States government service created in 1940. It trained the supervisors of war plants with three programmes: Job Instruction to teach a job, Job Methods to improve it and Job Relations to handle problems between people.
In the autumn of 1941, the TWI district heads asked for a programme in "production supervision". In the New Jersey district, Glenn Gardiner set its requirements: a means of reviewing a plant quickly to spot the jobs to improve, a method for daily use, ten hours for ten supervisors, the principles of methods engineering in simplified form and the Job Instruction model. The industrial engineer Clifton Cox built the programme. The district heads approved it in May 1942. National use began in September 1942. The card took its final form in the December 1942 edition of the manual.
According to the Lean Enterprise Institute, the United States forgot TWI after the war. In Japan, Toyota and other companies took it up.
The four steps of the card
Step 1 produces the breakdown of the present method. Step 2 fills the Ideas column of that breakdown. Step 3 produces the breakdown of the proposed method and the written proposal. Step 4 produces the method in use. The step 4 instruction that puts the method to work also opens a new cycle: the new method serves "until a better way is developed".
Step 1: break down the job
The supervisor lists all the details of the job exactly as the operator does them today. The list covers material handling, machine work and hand work. The first card named operations, moves, inspections and delays. A detail starts with a verb: "Walk to box of copper sheets", "Pick up 15 to 20 copper sheets", "Walk to bench".
The supervisor makes the breakdown at the workstation while the work is being done. Only observation captures the small details. The Job Methods breakdown goes further down than the Job Instruction breakdown. The Job Instruction breakdown keeps what must be taught: the important steps and their key points. The Job Methods breakdown keeps what must be questioned: every motion, every inspection and every delay. TWI told the two apart by the form. On the Job Methods sheet, each column has its own content:
- Details: every thing done, every inspection, every delay.
- Notes: reminders, tolerances, distances, time taken.
- Ideas: the ideas that come to the supervisor while he questions the details.
Step 2: question every detail
The supervisor asks these questions of every detail in this order:
- Why is it necessary?
- What is its purpose?
- Where should it be done?
- When should it be done?
- Who is best qualified to do it?
- How is "the best way" to do it?
The order matters. A detail that serves no purpose needs no better way. The Report notes that a supervisor who asks "How" before "Why" wastes time. To tell the first two questions apart, TWI reserved "What is its purpose?" almost entirely for quality. The supervisor also questions the materials, machines, equipment, tools, product design, layout, workplace, safety and housekeeping.
The supervisor questions the verb of the detail rather than its object. The Report cites two details: "Reach down to box on floor" and "Pick up bolt". The question "Why is it necessary to reach down to box?" probably gets the answer "in order to pick up the bolt". The analysis stops there. The question "Why is it necessary to reach down?" leads to putting the box of bolts on the bench.
On the radio shield, the supervisor asks why the operator stamps "TOP" on every shield (detail 21). The stamp has served no purpose for several months. He asks why the operator weighs the full tote box (detail 23). The case is weighed again at detail 28.
Step 2 gathers information. The solution comes at step 3. In the early trials, the "How" question pushed supervisors to design the new method as early as step 2. So the supervisor notes each answer in the Ideas column and moves on to the next detail.
Step 3: develop the new method
The supervisor takes up the ideas he noted and applies the verbs of the card in order:
- Eliminate unnecessary details.
- Combine details when practical.
- Rearrange for better sequence.
- Simplify all necessary details.
An eliminated detail no longer needs combining or simplifying. So the supervisor starts by eliminating. The card gives leads for simplifying. He makes the work easier and safer. He pre-positions materials, tools and equipment at the best places in the work area. He uses gravity-feed hoppers and drop-delivery chutes. He lets both hands do useful work. He holds the work in a jig or a fixture instead of by hand.
The acronym ECRS (Eliminate, Combine, Rearrange, Simplify) is a later label that the Report does not use.
The supervisor then works out his idea with other people. He asks his boss whether the job is worth improving. He consults the other supervisors for their experience. He works with the operator. Then he writes up the proposal. It contains the breakdown of the proposed method on the same form as the present method.
The supervisor looks for the flaws in his idea himself before he presents it. TWI dealt with this problem from the start: an incomplete idea that the boss turns down discourages the next proposal.
Step 4: apply the new method
The supervisor sells his proposal to his boss. He explains the new method to the operators and sells it to them. He gets the final approval of all concerned on safety, quality, quantity and cost. He puts the new method to work and uses it until a better way is developed. He gives credit where credit is due.
The first card also asked the supervisor to give the new method a fair test with the operators. From 1943, the proposal form carries a line that credits the person who helped develop the method.
The proposal channel
The supervisor applies Job Instruction and Job Relations alone when he trains an operator or settles a problem in his own department. An improvement often affects other departments. So each proposal goes up the line of supervision, which accepts or rejects it. The Report attributes the failure of Job Methods in some plants to the lack of a definite company plan. This plan assigns responsibilities, sets how many supervisors take the training, provides for their coaching, reports results to management and gives credit. For Job Methods, it also provides the proposal channel. Without a channel, proposals get lost and supervisors stop making them.
TWI recommended appointing a line executive as expediter to clear the proposals and keep them moving. The follow-through plan of July 1943 details the channel. Second-line supervisors hand out numbered breakdown and proposal sheets. They set a return date. They help the supervisors pick the jobs and make the breakdowns. They approve what lies within their authority and pass on the rest. The expediter keeps the register of all proposals and reports on it to management.
An improvement sometimes removes a job or changes a pay rate. TWI left these questions to the company and suggested rules for the war period: nobody is laid off because of a change of method; the person affected is transferred; take-home pay does not drop. An organisation that launches the method today settles the same questions before the first session.
The TWI training format
A trainer brings together ten supervisors for five two-hour sessions. At the first session, he acts out the present method of a demonstration case and then the improved method. He then hands out the card. At the following sessions, each participant presents the improvement he developed with the four steps on a job in his own department.
The demonstration case is the assembly of a radio shield. The trainer replaced the copper and brass sheets with coloured cards and the riveters with staplers.
Pitfalls
Breaking down from memory. A supervisor who writes the list at his desk describes the job as he believes it is done. He forgets the walks and the delays. These are often the details to eliminate. He makes the breakdown at the workstation.
Lumping details together. "Prepare the sheets" hides five details. Three of them are walks that the supervisor can no longer question. He writes each detail starting with its verb.
Designing the solution at step 2. A supervisor who answers "How" from the first detail improves a detail that could have disappeared. He notes the idea and keeps questioning.
Proposing an old idea without the four steps. Some supervisors took an idea they had had for a long time and wrote it up as a proposal. They skipped the four steps. TWI added a warning to the manual in 1943. The Report states the intent: the supervisor grasps every idea that flashes through his mind. Then he breaks down the job and develops the idea.
Aiming at redesign. A proposal that requires a new machine or a new department layout lies outside the supervisor's authority. TWI trainers steered supervisors toward the improvements closest to their daily work.
Speeding up instead of eliminating. A method that keeps the same details at a faster pace multiplies the errors. A breakdown that leads to no change is an accepted result: the December 1942 edition of the manual certified a supervisor who had broken down two jobs without finding an improvement.
Leaving the operator out of the proposal. The operator knows the motions that the supervisor does not see. TWI built the operator into the procedure. The forms carry the operator's name.
Launching the training without a proposal channel. The proposal channel and its expediter exist before the first session.
Related techniques
| Technique | Contribution | Run by | Deliverable |
|---|---|---|---|
| Job Methods | The procedure from the breakdown to the method in use | The supervisor with the operator | The written proposal and then the method in use |
| The eight wastes | What to look for | The team on the shop floor | The record of the wastes found |
| SCAMPER | Variants of a product, a service or a process | A group in a workshop or the analyst alone | The sorted list of variants |
| Standardised work | The known method locked in at the workstation | The supervisor and the team | The standardised work chart |
Detail by detail, Job Methods removes what the eight wastes name. The TWI card predates Ohno's seven wastes. The Report does not use the word "waste" as a category.
SCAMPER and Job Methods are both lists of verbs. The TWI card (1942) precedes Osborn's list of questions (1953) and Eberle's acronym (1971). SCAMPER gets a group to produce variants. With Job Methods, the supervisor observes a job and breaks down its present method.
At the workstation, standardised work locks in the method that Job Methods found. The supervisor applies this standard until he breaks down the job again with Job Methods.
AI considerations
The supervisor dictates the details as the work proceeds. A transcription assistant turns them into a numbered list. It flags any line that does not start with a verb. The supervisor checks the list at the workstation before questioning.
At step 2, a language model receives the breakdown and applies the six questions to the verb of each detail. The supervisor or the business analyst forbids it to propose solutions at this stage. A model readily answers "How" and reproduces the pitfall that TWI corrected. At step 3, the model compares the two breakdowns. It checks that every present detail is kept, changed or eliminated. It counts the walks and distances that disappear. It drafts a first version of the proposal.
The model does not see the workstation. A detail that it adds to the breakdown is invented. Its ideas come from the general literature: a conveyor, a robot, new software. They often fall outside the scope of the card, which is limited to the resources available. The supervisor and the operator judge the safety of each change at the workstation.
A video of the workstation helps with the breakdown, but it records people. Art. 26 of Ordinance 3 to the Employment Act (OLT 3 / ArGV 3) prohibits systems designed to monitor the behaviour of workers at their workstation. Systems needed for other reasons remain permitted if they harm neither the health nor the freedom of movement of the workers. So the supervisor films the work method and uses the video for the breakdown alone. As a precaution, he films with the operator's consent and deletes the video once the breakdown is written. These two rules go beyond what the ordinance requires.
Examples
The details and the notes come from the TWI Report (Exhibits 9 and 11). For each detail, the Ideas column notes the step 3 verb that the detail calls for. This classification interprets the two breakdowns: TWI does not classify the changes by verb.
| No. | Details | Notes | Ideas |
|---|---|---|---|
| 1 | Walk to box of copper sheets | Placed about 1.8 m (6 ft) from the bench by the handler | Eliminate: box on the bench |
| 2 | Pick up 15 to 20 copper sheets | Simplify: pile in a jig | |
| 3 | Walk to bench | Eliminate | |
| 4 | Inspect and lay out 12 sheets | Scratches and dents; scrap in bins | Simplify: scrap through a slot in the bench |
| 5 | Walk to box and replace extra sheets | Eliminate | |
| 6 | Walk to box of brass sheets | Placed about 0.9 m (3 ft) from the copper box by the handler | Eliminate: box on the bench |
| 7 | Pick up 15 to 20 brass sheets | Simplify: pile in a jig | |
| 8 | Walk to bench | Eliminate | |
| 9 | Inspect and lay out 12 brass sheets | One on top of each copper sheet | Combine with 4: one sheet in each hand |
| 10 | Walk to box and replace extra sheets | Eliminate | |
| 11 | Walk to bench | Eliminate | |
| 12 | Stack 12 sets near riveter | Eliminate | |
| 13 | Pick up one set with right hand | Simplify: both hands | |
| 14 | Line up sheets and position in riveter | Line-up tolerance 0.13 mm (0.005 in) | Simplify: a fixture lines up the sheets and locates the holes |
| 15 | Rivet top left corner | Combine: two corners at a time | |
| 16 | Move sheets and rivet top right corner | Combine | |
| 17 | Remove, reverse, position in riveter | Keep | |
| 18 | Rivet bottom right corner | Combine | |
| 19 | Move sheets and rivet bottom left corner | Combine | |
| 20 | Remove, reverse, place shield on table | Simplify: place in front of the fixture | |
| 21 | Stamp identification and pile on table | "TOP" at the lower right corner of the brass | Eliminate: unneeded for months |
| Repeat 13 to 21, 11 times | |||
| 22 | Carry 12 shields to tote box and place in box | Combine with 27: pack in the shipping case at the bench | |
| 23 | Carry full tote box to scale and weigh | About 15 m (50 ft) from the bench to the scale | Eliminate: the weighing is done again at 28 |
| 24 | Make weight ticket and place in box | About 34 kg (75 lb) gross | Eliminate |
| 25 | Carry tote box to packing department | By the handler, about 30 m (100 ft) | Simplify: full cases on a hand truck |
| 26 | Take shields out of tote box | By the packer | Eliminate |
| 27 | Pack shields in shipping case, 200 per case | Final inspection; wooden cases supplied by the handler | Rearrange: at the bench |
| 28 | Close, weigh and stencil case | Keep | |
| 29 | Mark weight on delivery slip | Keep | |
| 30 | Set case aside for shipment | Empty tote boxes returned by the handler | Keep |
The breakdown of the proposed method has 14 details. The repeated cycle goes from nine details for 12 shields to seven details for 20 shields.
| No. | Details | Notes |
|---|---|---|
| 1 | Put pile of copper sheets in right jig | Boxes placed on the bench by the handler |
| 2 | Put pile of brass sheets in left jig | |
| 3 | Pick up one copper sheet in right hand and one brass sheet in left hand | |
| 4 | Inspect both sheets | Scratches and dents; scrap dropped through the slots |
| 5 | Assemble sheets and place in fixture | The fixture lines up the sheets and locates the rivet holes; brass sheet on top |
| 6 | Rivet the two bottom corners | |
| 7 | Remove, reverse, replace sheets | |
| 8 | Rivet the two top corners | |
| 9 | Place shield in front of fixture | |
| Repeat 3 to 9, 19 times | ||
| 10 | Put 20 shields in shipping case, 200 per case | Cases placed by the handler |
| 11 | Carry full cases to packing department | By the handler with a hand truck |
| 12 | Close, weigh and stencil cases | Final inspection by the packer |
| 13 | Mark weight on delivery slip | |
| 14 | Set cases aside for shipment |
The Ideas column of the first sheet anticipates the second. Every line marked "Eliminate" is absent from it. Every line marked "Keep" still appears in it. The Report puts the result at a 300% improvement in production per operator. The new method also removes tiring motions and heavy work. These figures are TWI's for a demonstration case.
Visualisations
The Job Methods cycle shows what each step produces and how the method in use returns to a new breakdown. The radio shield diagram links the 30 details of the present method to the 14 details of the proposed method through the step 3 verbs. The two breakdowns of the example and the comparison with related techniques are tables.
Cost
| Phase | Level | Justification |
|---|---|---|
| Preparation | Low | Choose a job with the boss, print the card and the sheets. For an organisation, appoint the expediter of the proposal channel before the training. |
| Execution | Medium | Observe the job over several cycles, question every detail, discuss with the boss, the colleagues and the operator. The TWI training takes ten hours for ten supervisors. |
| Documentation | Low | Two breakdowns on the same form and one proposal sheet. The expediter numbers them in the register. |
Tools
The pocket card, the three-column breakdown sheet, a clipboard and a pencil are enough. A tape measure measures the walks. A stopwatch times the delays. The spaghetti diagram traces the walks on a plan when they dominate the breakdown.
A spreadsheet keeps the register of proposals: number, job, supervisor, return date, decision, people credited. A kaizen board displays the proposals in progress near the workstations. For a training session, the trainer replays the radio shield case with paper in two colours, two staplers and two waste baskets.
Sources
- War Manpower Commission, Bureau of Training, The Training Within Industry Report 1940-1945, U.S. Government Printing Office, 1945. Part I, "The Job Methods Card" and "The Radio Shield": the final card and the demonstration case. Chapter 15, "The Development of the Job Methods Program": Gardiner's requirements, the first card, the radio shield breakdowns (Exhibits 9 to 12), the order of the questions, the successive versions of the manual.
- Lean Enterprise Institute, Training Within Industry (TWI), Lean Lexicon: the three programmes, TWI forgotten in the United States after the war and its adoption by Toyota and other Japanese companies.
- Ordinance 3 to the Employment Act (OLT 3 / ArGV 3), SR 822.113, art. 26: the prohibition of systems designed to monitor the behaviour of workers at their workstation.

