Troika Consulting
Troika Consulting is a meeting structure in which participants advise one another as peers in groups of three. In each round, one of them is the client: they present a problem and the help they need. The other two are the consultants. They ask the client clarifying questions, then discuss the problem with each other while the client listens. The client role passes from one person to the next until each has held it once. Henri Lipmanowicz and Keith McCandless designed it and describe it in The Surprising Power of Liberating Structures (2013). The book times it at 30 minutes.
Goal
Troika Consulting is a facilitation structure in which two participants advise a third person on the problem that person brings.
According to Lipmanowicz and McCandless, the structure helps people understand the problems they face. It draws on the group's knowledge to address them. The authors see it as a way to solve everyday problems, spot patterns and refine prototypes. In their view, it offers coaching between colleagues outside reporting relationships.
The structure produces no collective decision. Each client leaves with the questions and ideas of their two consultants and chooses the ones to keep. In the takeaways step, the client tells the trio what was most useful to them. The Field Guide (part four of the book) asks for no written record.
You'll find the other structures in the repertoire in the Liberating Structures fiche.
Usage
When to use it
- Start or end of a team meeting: each person puts a current problem to two colleagues. The Field Guide suggests making it a meeting routine.
- After a presentation: participants formulate and sift their next steps with two peers.
- Conference or large group: all the trios work at the same time, however many there are.
- Training: participants help one another and learn from each other.
- Problem that cuts across several functions: a trio of different roles gives the client viewpoints they lack.
- Prototype or first draft to refine: the client presents the draft and asks for specific help.
- Follow-up to 15% Solutions (what each person can do right away on their own): each person gets advice on that action.
- Distributed team: the site provides an online version in which the client switches off camera and microphone during the consultation.
- First try of Liberating Structures: the book lists it among the easy structures to start with, alongside 1-2-4-All.
When not to use it
- Confidential problem or low-trust group: in our view, the client then brings only a problem that carries no risk. A conversation with a mentor or a coach fits better.
- Problem shared by the whole group: Troika Consulting advises one person at a time. 1-2-4-All puts the whole room to work on the same question.
Description
The invitation
The Field Guide puts the questions "What is your challenge?" and "What kind of help do you need?" to the group. The site opens with a different wording. It reminds the group that people often face their problems alone and invites it to try sharing them and see what that brings.
In our view, the second question steers the advice. A client who asks for "ideas to get the branches' views without a workshop" gives the consultants a target. A client who presents only the problem leaves them to guess what help is wanted.
The room and the trios
The Field Guide asks for groups of three chairs with no table. Participants preferably sit knee to knee. The number of trios has no limit. The site keeps the trios of chairs without a table and puts a facilitator in charge of the session. It sets the minimum at three participants.
The authors recommend mixing roles and functions in each trio. According to the Field Guide, people with different backgrounds and perspectives help the most. Neither the book nor the site says how to split a group whose size is not a multiple of three. In our view, one or two groups of four take the remaining participants. A group of four has three consultants in each round. It needs a fourth round of 7 to 11 minutes. To finish at the same time as the trios, it shortens its steps.
The roles
The client brings the problem and chooses what to keep. The consultants ask questions, then give advice. According to the Field Guide, everyone has the same chance to receive and give advice. The trio stays the same from one round to the next.
How a round runs
Before the first round, each person spends one minute reflecting on the problem they will present and the help they will ask for.
| Step and duration | Client | Consultants |
|---|---|---|
| Briefing (1 to 2 min) | Presents their problem and the help they need. | Listen. |
| Questions (1 to 2 min) | Answers. | Ask clarifying questions. |
| Consultation (4 to 5 min) | Turns away from the consultants and listens. | Discuss the problem with each other. They produce ideas, suggestions and advice. |
| Takeaways (1 to 2 min) | Turns back and says what was most useful to them. | Listen. |
After the takeaways, the trio moves on to the next person and repeats the steps.
Timing by source
The site keeps the durations of the four steps. It changes the introduction, the later rounds and the close.
| Step | The book's Field Guide | The authors' site |
|---|---|---|
| Stated duration | 30 min | About 30 to 35 min |
| Introduction | 1 min to reflect on the problem and the help needed | 5 min to reflect on the two questions |
| Briefing | 1 to 2 min | 1 to 2 min. The client also presents the next steps they are considering. |
| Questions | 1 to 2 min | 1 to 2 min. The consultants do not judge and offer no solution. |
| Consultation | 4 to 5 min. The client turns away. | 4 to 5 min. The client listens in silence. |
| Takeaways | 1 to 2 min | 1 to 2 min |
| Later rounds | – | Rounds 2 and 3, 7 to 10 min each |
| Close | – | Sharing in plenary, 2 min |
| Calculated total for three rounds | 22 to 34 min | 28 to 38 min |
The steps of a round add up to 7 to 11 minutes in both sources. The site states 7 to 10 minutes for rounds 2 and 3. By our calculation, the book's steps add up to 22 to 34 minutes for three rounds of equal length. The site's steps add up to 28 to 38 minutes. Both stated durations fall within these ranges.
Back turned to the consultants
In the Field Guide, turning around is a step: after the questions, the client turns away from the consultants. Its variations allow the client to stay facing them. According to the Field Guide, having the client turn their back deepens curiosity, listening, empathy and risk-taking for the whole trio.
The site makes it a fixed step. It drops the option of facing the consultants. The facilitator gives a short demonstration and explains that turning one's back is not rude. During the consultation, the client listens in silence. Online, the client switches off camera and microphone.
In our view, a client with their back turned changes the consultants' conversation. They talk to each other without watching for the client's reaction. The client can neither correct them nor justify themselves. The client hears how two people understand their problem.
Running the rounds
The facilitator announces each step and keeps time for all the trios. According to the Field Guide, the consultants pay attention to the way they help. The ideal is to provoke the client respectfully: the consultants say what they see that they think the client does not see. The consultants take risks while keeping their empathy. A question that helps the client understand or correct themselves can weigh more than advice on what to do.
The Field Guide asks the client to observe what they experience during the round. It suggests that they ask themselves: "What is happening here? How am I experiencing what is happening?"
The Field Guide asks participants to notice for themselves the traps they fall into. It names jumping to conclusions. It also asks them to protect the trust within the trio: a participant who repeats what they heard does so with discretion.
When the first round does not yield enough advice, the Field Guide suggests a second round. The site suggests using it for a new problem. According to the Field Guide, two rounds of ten minutes per client work better than one round of twenty minutes.
Purposes according to the Field Guide
According to the Field Guide, participants learn to ask for help and to state a problem clearly. They practise listening and advising. They learn to work across disciplines and functional silos. Mutual support builds trust within the group. The group learns to organise itself. According to the Field Guide, the structure also creates the conditions for solutions that nobody had imagined.
What makes Troika Consulting fail
Consultants who propose solutions during the questions jump to conclusions before they understand the problem. The site asks them not to judge and to offer no solution at this step.
When the facilitator lets the first rounds overrun, the third client gets shortened advice. The Field Guide promises each person the same chance to receive advice. Only one clock shared by all the trios keeps that promise.
In our view, a trio that brings together a manager and their own direct report pulls the advice back into the reporting line that the structure bypasses. The facilitator forms the trios with this in mind.
Variations
The Field Guide suggests combining Troika Consulting with 15% Solutions. Each client presents what they can do right away without extra resources or permission. They ask for advice on that action. In Q-Storming, the consultants ask only questions that clarify the problem. The site adds Speed Troika, which shortens the steps.
Troika Consulting in strings
The Field Guide suggests stringing Troika Consulting together with Helping Heuristics, with "Heard, Seen, Respected" or with Nine Whys.
Chapter 6 of the book describes three strings that end with 15% Solutions followed by Troika Consulting. In each one, every participant gets help with the action they have just named. The first opens with Creative Destruction (TRIZ in the book) and 1-2-4-All. The second opens with Drawing Together. The third opens with Nine Whys and Social Network Webbing.
The book also reports combinations in teaching. A professor replaced her lectures with structures such as Impromptu Networking, Troika Consulting and Conversation Café. The South African consultant Craig Yeatman rebuilt a two-day programme on organisational development around Impromptu Networking, Troika Consulting, Conversation Café and 25/10 Crowd Sourcing.
AI considerations
Neither the book nor the site mentions AI. In our view, it helps before and after a round, never during one.
Among the structure's purposes, the Field Guide lists the skill of asking for help and stating a problem clearly. A participant who has a language model write their request skips that exercise. In our view, the participant first writes the request themselves. They then ask the model what is still unclear in it.
During the round, the advice comes from two colleagues who know the organisation, its people and its history. An assistant consulted within the trio would bring generic advice. It would also interrupt the conversation between the consultants that the client listens to.
After the session, the client can ask a model to turn the ideas on their sheet into dated actions. What a client brings to a trio often concerns identifiable colleagues or customers. This information is personal data within the meaning of the Federal Act on Data Protection (Art. 5 let. a FADP). Before handing their notes to an external AI service, the client removes the names and any detail that would identify a person. The facilitator does not record the rounds: the book asks participants to share what is said in the trio with discretion.
Examples
The client in the following case notes her round on a sheet. The Field Guide does not ask for one.
| Step | The client's sheet |
|---|---|
| Problem | The managers of the regional branches no longer come to the requirements workshops for the new customer portal. |
| Help requested | Ideas for getting their views without a two-hour workshop in Lausanne. |
| Questions | "When did they stop coming?" "Who invites them and through which channel?" "What do they lose by coming?" |
| Advice | 1. Hold a half-hour session in a branch. 2. Send three screens from the prototype for comment. 3. "She talks about her requirements. They talk about their customers. Her invitation describes the project instead of their work." |
| Takeaways | I'm keeping idea 3: rewrite the invitation around three customer cases from the branches. I'll try idea 1 at the Yverdon branch. |
The third idea describes the client instead of proposing a solution. She hears the consultants say what they see and she does not: the Field Guide makes this the ideal of advice. She picks this idea first.
Visualisations
A diagram shows a round with the Field Guide durations and the client's position at each step. Tables carry the steps of a round, the published timings and the client's sheet.
Cost
| Phase | Level | Justification |
|---|---|---|
| Preparation | Low | Display the two questions of the invitation. Set out trios of chairs without tables. |
| Execution | Low | 30 minutes according to the Field Guide, 30 to 35 minutes according to the site. All the trios work at the same time. |
| Documentation | Low | The sources ask for no record. Each client notes what they keep. |
Tooling
The room needs only chairs set out in threes. A displayed timer or a bell announces the steps. Each participant keeps a sheet to note what they take from their round.
Online, Zoom or Microsoft Teams split the participants into breakout rooms of three. The facilitator announces each step with a message broadcast to all the rooms.
Sources
The book is published under a Creative Commons BY-NC-SA 3.0 licence. The structure's page on the site is published under a BY-SA 4.0 licence.
- Henri Lipmanowicz, Keith McCandless, The Surprising Power of Liberating Structures: Simple Rules to Unleash a Culture of Innovation, 2013, ISBN 978-0-615-89337-2: the description of Troika Consulting with its invitation, its steps, its purposes, its tips, its variations and its examples (Field Guide, part four); the professor (chapter 1); the structures to start with (chapter 5); the strings (chapter 6); the interview with Craig Yeatman (part three).
- Troika Consulting, Liberating Structures: the site's version with its invitation, its durations, its three rounds and its plenary, the facilitator's role, the minimum of three participants, the online format and Speed Troika.

