Your Training Partner
Techniques Toolbox
On the left, the front of a sheet lists six numbered fears. On the right, the back is folded into four quadrants. Top left, a round shape has become a big-eyed monster named "Naive Bubble". Top right, a looped line has become a worm with teeth named "Production Worm". Bottom left, an angular shape has become a block with claws named "Block of No". Bottom right, a scribble has become a winged monster named "Silent Knot". It dances among small stars. Under each name, a number points to the fear on the front. Fears 5 and 6 on the front have no demon.

Tiny Demons

Tiny Demons is a meeting structure associated with Liberating Structures. Each participant lists about six fears, draws four simple shapes, turns them into little monsters and gives each one the name of a fear. Finally, they draw one of them dancing. The work stays individual and takes 15 to 20 minutes. The final sharing is optional.

Goal

With Tiny Demons, each participant names the fears, habits and foibles that hold them back. The participant draws each fear as a monster that they look at from the outside.

Each participant leaves with their sheet: the list of their fears on the front, four named demons on the back and at least one dancing demon. The sheet stays with its author. The structure produces no group document and takes no decision.

The business analyst uses it at the start of a change project, when unspoken worries hold the team back. Tiny Demons then comes before a structure that tackles the obstacles. In that structure, each participant shares only what they choose. In 15% Solutions, for example, each participant shows the group a small step that works on their own demon and keeps the demon to themselves. You will find the other structures of the repertoire under Liberating Structures.

Usage

When to use it

  • Start of a change project: everyone puts a name to what worries them before the work begins.
  • Worries nobody talks about: everyone names them on their sheet without telling the group.
  • Low trust: the facilitator and each participant acknowledge that they have their demons.
  • Strong hierarchy: in our view, the individual work spares each person from speaking in front of their boss.
  • Working alone: the solo version fits on two sheets and takes 10 to 20 minutes.
  • Remote team: everyone draws on paper and shows their dancing demon to the camera.
  • Group of any size: the Tiny Demons page on liberatingstructures.info gives a range of 2 to more than 99 participants.

When not to use it

  • Distress or serious fear in a participant: the exercise deals with everyday fears. Refer the participant to the company's person of trust or to a specialist.
  • Obstacles or risks to handle as a team: Tiny Demons keeps each fear private. Remove the obstacles with Creative Destruction or list the risks with risk analysis.

Description

In our view, the facilitator first runs a Tiny Demons session with a group they know. They watch how each person chooses their fears and how long the drawing takes. They then adjust the instructions and the timing.

The structure is also known as Drawing Monsters, Tiny Monsters and Uhuglettes. On ripplet.org, Tomomi Sasaki finds the word "demon" too strong and notes that some demons are not small. In our view, the facilitator speaks of "monsters" to an audience that the word "demon" might offend.

The elements of the structure

Henri Lipmanowicz and Keith McCandless's book describes each Liberating Structure by its design elements. The Tiny Demons page on liberatingstructures.info follows this framework.

ElementWhat the page prescribes
Structuring invitationList about six fears. Turn them into demons that have a shape, a character and a name. Make at least one of them dance and celebrate it
Space and materialsOne blank sheet per person. Pens or markers. No drawing talent required: stick figures and simple shapes are enough. An atmosphere free of judgement
How participation is distributedEveryone works alone from start to finish. The final sharing is optional
How groups are configuredAlone. The whole group meets for the optional monster party
Steps and time allocationEight steps in 15 to 20 minutes. The last one is optional
The design elements of Tiny Demons according to the liberatingstructures.info page.

The steps

  1. List the fears (2 min): each person privately writes down about six fears, worries or doubts about themselves.
  2. Prepare the back (under a minute): each person turns the sheet over and divides it into four quadrants with two folds or two lines.
  3. Draw four shapes (under a minute per shape): the facilitator announces the shapes one by one and each person draws them in quadrant order: a round shape, a looped or wavy line, a closed angular shape and a free scribble.
  4. Turn the shapes into demons (2 to 5 min): each person adds eyes, teeth, hair, wings or claws.
  5. Name the demons (2 min): each person matches four of their fears to the four demons and names each demon after its fear.
  6. Make a demon dance (1 to 2 min per demon): each person picks at least one demon they would like to see differently. They draw it dancing or celebrating something. They may give it another name.
  7. Close (1 min): each person puts their sheet in their pocket and keeps it for the next time these fears return. The facilitator reminds everyone that these demons belong to them but do not rule them. The facilitator then invites the group to treat the demons kindly.
  8. Monster party (optional, 2 to 5 min): those who want to take part walk around the room. They show their dancing demons and look at those of the others.
Step 3 · Shape Under a minute
Step 4 · Demon 2 to 5 min
Step 5 · Name 2 min
4Silent Knot
Step 6 · Dance 1 to 2 min
4Silent Knot
From step 3 to step 6, the scribble in the example becomes the dancing Silent Knot. The participant draws the shape before choosing the fear that it will carry.

The participant draws the shapes before knowing which fear each one will carry. They then look for the fear that resembles each monster. In our view, this detour protects the participant: they draw a shape with nothing at stake.

The page states 15 minutes in its summary and 15 to 20 minutes in the list of steps. By our count, steps 1 to 7 take at most 17 minutes with a single dancing demon: 2 + 1 + 4 + 5 + 2 + 2 + 1. The monster party adds 2 to 5 minutes. With the party, the session reaches at most 22 minutes. In our view, the facilitator sets aside 25 minutes.

Introducing the exercise

The facilitator repeats that no drawing talent is required.

In our view, the facilitator steers the fears towards work when the group is a team. "Asking a naive question in a workshop" fits better than a fear about health.

Sharing

The final sharing is optional. Each person chooses their fears knowing that no one will see their sheet without their consent. During the monster party, each person shows their dancing demons or shows nothing. A demon's name often gives its fear away. The participant therefore chooses which demons to show. At step 6, they can also rename the dancing demon.

Online

The page keeps the same steps online. According to the page, each person draws on paper rather than on a digital whiteboard. Each person then holds their dancing demon up to the camera. Yet the page's preparation notes allow a digital whiteboard or a drawing app. In our view, paper is the better choice: the folded sheet goes into its author's pocket. A shared whiteboard keeps a copy on a server.

The solo version

Working alone, the participant writes down about six fears on one sheet. The fears come from work, relationships, projects or a life transition. On a second sheet, they draw the four quadrants and the four shapes. They turn the shapes into demons and name them. They make at least one demon dance, fold the sheet and keep it. The page allows 10 to 20 minutes.

What makes Tiny Demons fail

In our view, a manager who asks to see the sheets ends the trust that the structure needs. The same holds if the manager brings up a fear in a project meeting. Before the session, the facilitator agrees with the manager that no sheet leaves its author's pocket.

In our view, the facilitator does not comment on any drawing. A comment on a demon judges the drawing that the instructions promised not to judge.

Variants

Carlo Gandolfo publishes a 25-minute adaptation for 2 to 30 people on Liberating.it. It targets teams that already work well together. Each person writes at least four fears related to a stated goal. They draw each fear directly as an abstract shape in one of the four quadrants of their sheet. In this adaptation the fear therefore comes before the shape. They turn each sketch into a little monster in the same quadrant. A partner then guesses what each drawing shows. The adaptation drops the dance and makes the exchange in pairs mandatory. The pairs share their surprises. An optional plenary looks for shared fears. The session ends with concrete actions against the fears that were named. The liberatingstructures.info page does not include this guessing game.

AI considerations

The participant draws their demons by hand. The shape drawn at random becomes a demon because its author finds a character in it. A monster generated by an AI takes this work away from the participant.

The facilitator submits neither the drawings nor the fears to a model. The facilitator has promised an exercise without judgement. A psychological reading produced by a machine breaks that promise.

Before the session, a model helps the facilitator prepare the instructions. For a software migration, it proposes an invitation that steers the fears towards the project and ten examples of harmless fears. The facilitator removes the examples that are too heavy. The model also translates the invitation for a bilingual French and German group.

The sheets stay away from all AI services. A list of fears linked to a person is personal data within the meaning of the Federal Act on Data Protection (FADP, Art. 5 let. a). A fear that touches on health makes it sensitive personal data (Art. 5 let. c no. 2).

Examples

The example shows one participant's sheet: four fears from the front become four named demons on the back.

My fears
  1. 1Asking a naive question in front of the actuaries
  2. 2Missing a requirement that surfaces in production
  3. 3Saying no to the project manager
  4. 4Running a workshop where nobody speaks
  5. 5No longer being the expert on the old system
  6. 6Writing a specification that nobody reads
1Naive Bubble
2Production Worm
3Block of No
4Silent Knot
Constructed case. The sheet of a business analyst at a pension fund before the fund replaces its administration software. Four of the six fears on the front give their names to the demons on the back. The Silent Knot dances.

Fears 5 and 6 stay on the list without a demon. The analyst makes the Silent Knot dance. Before the project's first workshop, she wants to see in a different light her fear of a workshop where nobody speaks.

Visualisations

A drawing shows one participant's sheet: the list of fears on the front and the four named demons on the back. One of them dances. A second drawing follows a shape from step 3 to step 6. The design elements fit into rows and columns.

Cost

PhaseLevelRationale
PreparationLowOne blank sheet and markers per person. The facilitator prepares the instructions for choosing the fears.
ExecutionLow15 to 20 minutes, 10 to 20 solo. The facilitator must know how to reframe a fear that is too heavy.
DocumentationLowThe sources call for no record. The sheet stays with its author.

Tooling

Each participant receives a blank A4 sheet and a black marker. Coloured markers are for the dancing demon. A visible timer paces the drawing steps. The room has enough space to walk around during the monster party.

Remotely, a video call (Zoom, Microsoft Teams) is enough. A tablet with a stylus or a collaborative whiteboard (Miro, Mural) helps out a participant who has no paper. The tool then keeps a copy of the sheet.

Sources

Time Boxing and Budgeting
All techniques
Top-down Estimation