Twenty-minute timeline in four blocks drawn to scale by duration. Three minutes alone: eight people each write a long list of targets. Four minutes in pairs or threes: the eight lists merge into four group lists. Three minutes in the same group: each list narrows to a single circled target. Ten minutes with the whole team: the four groups present their target in turn. A brace labelled ten timed minutes joins the first three blocks. Another brace labelled ten minutes of sharing covers the last block.

The Subtraction Game

The Subtraction Game is a timed team exercise: the members list what slows the team down, then choose what to remove. A whole team of four to ten people spends twenty minutes on it. Each person writes alone for three minutes. The members then pool their lists in pairs or threes for four minutes. Each group settles on a single target in three minutes. Finally the groups present their target to the whole team for ten minutes. George W. Anderson describes the exercise in Design Thinking for Tech (2023).

Goal

In the Subtraction Game, a team looks for what it can remove from its own way of working: a meeting, a report, an approval, a tool, a habit. Anderson places it among the exercises that go with a growing team. When a team grows beyond five or six people, he opens the exercise with these questions: what is hindering the team as it grows? What is no longer effective today? What should therefore be eliminated?

A study published in Nature in 2021 explains why the team must ask about removal explicitly. Across eight experiments, Adams, Converse, Hales and Klotz show that people look for additive changes first and overlook subtractive ones. They find more subtractive changes when the instructions prompt them to. The Subtraction Game gives that prompt to the whole team.

In the game, the team decides which practices it drops. Each group delivers one target and the way to remove it. The team records each target in a register with an owner and a review date.

Usage

When to use it

  • A team growing beyond five or six people: remove the practices that growth has made heavier.
  • Two teams merging: sort the meetings and reports that each team brings.
  • A calendar full of recurring meetings: look for what the team can stop before adding a tool.
  • Retrospectives that only produce additions: give one retrospective session to what the team can stop.
  • After a reorganisation or a change of tool: remove the practices that the old way of working justified.

When not to use it

  • Obstacles that come almost entirely from other departments' rules: the team cannot remove them on its own. Run Kill a stupid rule with the people who own those rules.
  • A problem whose cause is unknown: the game picks a removal without looking for its cause. Look for the cause with root cause analysis.
  • A lack of resources or skills: the game removes without adding anything. Look for a reallocation with Möbius Ideation.

Description

According to Anderson, the game combines divergent thinking and brainstorming. Anderson calls each item on a list a subtraction target: a practice that the team could remove. The steps and their durations come from Anderson. The facilitation guidance, the register and the pitfalls are additions.

Participants and duration

Anderson brings the whole team together for twenty minutes. He puts the team at "likely 4–10 people". Three timed steps fill the first ten minutes. The next ten minutes are for sharing. Each group has two or three people. A team of four to ten therefore forms two to five groups.

10 timed minutes
3 min
Alone
8 lists
4 min
In pairs or threes
4 group lists
3 min
Same group
4 targets
10 minutes of sharing
10 min
Whole team
Sharing round
The three timed steps last ten minutes in total. The sharing also lasts ten minutes. Eight individual lists become four group lists. Each group keeps a single target from its list.

The sequence

  1. Alone, 3 minutes. Each member writes down everything that slows the team in how it works today. Anderson guides the writing with these questions: what constrains the team from within or from its immediate surroundings? What once served the team and now holds back its progress? What adds needless friction or scatters attention? The aim is quantity.
  2. In pairs or threes, 4 minutes. The members read their lists to their group. The group combines the targets into one shared list and adds the targets that the exchange brings up.
  3. In the same group, 3 minutes. The group converges on a single target and decides how to remove it. Anderson warns against overthinking: a group this small and this close to the problem quickly finds what to remove and how.
  4. The whole team, 10 minutes. Each group presents its target in turn. The team discusses the targets, ranks them by priority and commits to the changes.

Like 1-2-4-All, the game moves from solo work to the full group. The Subtraction Game replaces the step in fours with a convergence in the same group. Its question is fixed: what to remove?

Kill a stupid rule deals with rules only: the group separates legal obligations from internal rules and places the internal rules on an impact and ease grid. The Subtraction Game targets any practice (meeting, report, tool, habit), runs on a timer and keeps a single target per group.

Running the session

A team member facilitates the session and keeps the timer. The facilitator displays the step 1 questions for the whole session. The facilitator forms the groups before starting the timer. With an odd number of people, one group has three members. Groups that mix roles reveal the practices that one role imposes on another.

Each note carries a single target. Its author phrases it as a practice that the team can stop. The facilitator has the complaints rephrased before step 2.

Notes rephrased as targets that the team can stop.
Written noteDefectRephrased target
Too many meetingsComplaint with no practice to stopThe Tuesday progress meeting
Marc slows down the reviewsTargets a personReviews wait for a single reviewer
Replace the Tuesday meeting with a shared boardAdds a toolDrop the Tuesday meeting

At the end of step 3, a group without agreement keeps the target that appears on the most individual lists. In a tie, the group keeps the target that it can remove without the agreement of another department.

After the sharing round

During the round, the person with authority over the practice rules on each target. Most often this person is the team lead. The decision takes one of these forms: remove the practice on a set date, first consult the people who depend on it or pass the target to whoever decides outside the team. The team ranks the targets by the working hours that their removal frees each week.

Without an owner, the list stays on the wall and the next session finds the same targets. The team therefore records each target in a register. Each row carries the decision from the round, an owner and a review date. On that date, the owner checks that the removal holds and that it has cut nobody off from information.

Anderson's step 1 lets the team include factors from its immediate surroundings. For a target outside the team, the register records who holds the decision.

Pitfalls

The disguised replacement. A target that replaces one practice with another adds as much as it removes. The facilitator asks what happens if the team removes the practice and puts nothing in its place.

The hidden function. A practice that looks useless sometimes serves a person who is absent from the session. A weekly report may feed the sponsor's dashboard. Before removing a deliverable, the owner asks its recipients whether they use it.

The targeted person. A target names a practice, a tool, a meeting or a report. The facilitator rephrases a note aimed at a colleague as a practice. Failing that, the facilitator removes the note.

The lead in the room. In a team where nobody contradicts the lead, the members keep quiet in front of the lead about the practices that the lead introduced. Before step 1, the lead names one of those practices as an example target.

The debate at step 3. A group that weighs every target uses up its three minutes. The facilitator stops the group on time and applies the rule for a group without agreement.

AI considerations

At step 1, each person writes their own list. A list that a language model generates in advance would steer the participants towards generic targets. The model therefore works before and after the session.

Before the session, the model analyses an export of the team's calendar. For each recurring meeting it calculates the duration, the number of participants and the hours that the meeting costs per week. These figures give the cost of a target during the sharing round. After the session, the model transcribes the photos of the notes, merges the duplicates across groups and drafts the register. The model also flags the discarded targets that appear on several lists. The team takes them up at the next session.

The model does not know who reads a report or why a meeting exists. So the model does not choose the target. The lists sometimes name colleagues or clients. The team removes those names before it submits the notes to a service that the organisation has not approved. The same rule applies to the calendar export: it carries the names of the participants and the titles of the meetings.

Examples

The register holds one target per group and the decision from the round. The team has eight people in four groups of two.

Target register. Suggested format and invented example.
GroupTargetRemoval proposed at step 3Decision from the roundOwnerReview
ATuesday progress meeting: 45 minutes with eight people, so 6 working hours per weekDrop the meeting. The fifteen-minute daily meeting already covers progress.Removed from 3 MarchTeam lead31 March
BWeekly progress report sent to managementStop sending the report.Pending: two recipients to consultBusiness analyst14 March
CApproval of each new software library by the security department: 5 days of waitingApprove a list of libraries once a quarter.Outside the team: passed to the IT security officerTeam lead28 March
D"General" channel in the team chat: 40 notifications per dayClose the channel. The two topic channels stay.Removed from 3 MarchTeam assistant31 March

Two of the four rows stay open after the session. Row B waits for the report's two recipients to answer. Row C depends on a department outside the team. The register still gives both rows an owner and a date.

Visualisations

The timeline shows the four stages drawn to scale by duration. It also shows many targets per person narrowing to a single target per group. The rephrasing table shows how a note becomes a target. The register in the example shows the outcome of the sharing round.

Cost

DimensionLevelJustification
PreparationLowForm the groups, display the step 1 questions, provide a timer and sticky notes.
ExecutionLowAnderson plans twenty minutes with the whole team.
DocumentationLowOne register row per group, then one review per target kept.

Tooling

A timer that everyone can see frames the three timed steps. Sticky notes and a whiteboard hold the lists in a room. For a remote team, an online whiteboard (Miro, Mural) holds the lists. The breakout rooms of the video call (Teams, Zoom) host the groups. A spreadsheet or the team's tracking tool (Jira) holds the register and its review dates.

Sources

Only the sequence, the durations, the questions and the team size come from Anderson. The when-to-use and when-not-to-use lists, the facilitation guidance, the register, the pitfalls, the AI considerations and the worked example are additions.