Talking with Pixies
Talking with Pixies is a meeting structure from Liberating Structures. A person describes a situation in which they do not know how to move forward, then the goal they are pursuing. An interviewer asks them what they do to reach this goal and what holds them back. The person then closes their eyes. Two participants play the "pixies": they whisper two opposed points of view to the person at the same time. One praises the change. The other stresses its risks and defends current habits. In this structure the pixies and the person look for the outdated beliefs and assumptions that block the person. Ian Prinsloo, Keith McCandless and members of the Seattle user group designed it. The authors' site allows 15 to 20 minutes per round and 30 to 95 minutes for the session.
Goal
Talking with Pixies is a meeting structure in which a person hears two opposed voices on a situation that blocks them. The pixie is a sprite from English folklore. The structure turns it into an inner voice that speaks into the ear.
According to the authors' site, the structure can bring out new ways to move forward. It can also help the group understand what a person in the middle of a change goes through. The site links it to the eighth of its ten principles: "Invite Creative Destruction to Enable Innovation". This principle asks the group to talk about what keeps people from working on the essence of their work. It also asks the group to help each person face their fears.
The pixies listen in the interview for the person's competing commitments and assumptions. On our reading, a competing commitment is something the person cares about that keeps them from reaching their goal. An assumption is something they hold to be true without having checked it: "If I criticise his work, he will resign."
The session produces no shared document. The pixies take notes during the interview. Each person leaves with two points of view on their situation that the pixies have put into words. In plenary, the group names what it has learned about competing commitments.
In a change project, the business analyst can offer the structure to people who hesitate to take on a new role or a new way of working. You'll find the other structures under Liberating Structures.
Usage
When to use it
- A career choice put off: the person hears what keeps them from accepting a management post or the role of go-to person for the new tool in a project.
- A behaviour a person wants to change and cannot: a manager who struggles to give criticism hears what holds them back.
- A strategic question that blocks a leader: the leader hears both points of view on their choice.
- A team in the middle of a change: each member understands what keeps the others from leaving the old way of working.
- A large group around a leader: with User Experience Fishbowl, the whole room listens as the leader talks with their pixies.
- A distributed team: the page adapts each step to videoconferencing.
When not to use it
- Low trust or a new group: the page advises against it. Start with Impromptu Networking.
- An obstacle shared by the whole team: the structure deals with one person's situation. List what the team must stop doing with Creative Destruction.
- A person who expects advice: the pixies give none. Use Troika Consulting instead.
Description
The elements of the structure
The authors describe each structure by its design elements. The facilitator opens the session with the structuring invitation: "You are invited to explore a crossroads you face now and consider competing commitments that limit progress or immobilize change. We are going to assemble a team of pixies, or voices on your shoulder, to help you."
The room holds groups of four chairs. A screen displays the steps and the interviewer's questions. The session needs at least four participants. They reflect alone, then work in groups of four, then share as a whole group.
The roles
| Role | What they do |
|---|---|
| Facilitator | Reads the invitation. Leads the demonstration. Announces the steps and facilitates the plenary. Online, a tech host supports them. |
| Listener | Describes their situation and their goal. Answers the interview. Closes their eyes and listens to the pixies with empathy without answering them. |
| Interviewer | Draws out the listener's facts and emotions. Keeps time. Redirects the pixies if needed. Pauses if the listener feels uncomfortable. |
| Innovator pixie | Notes the competing commitments and the assumptions during the interview. Praises the benefits of change and of letting go of outdated commitments. |
| Protector pixie | Notes the competing commitments and the assumptions during the interview. Stresses the risks of change and the advantages of current commitments. |
The interviewer sits opposite the listener. The two pixies sit on either side of the listener.
The situation and the goal
Each participant first works alone. They choose a current difficulty that blocks them or leaves them unsure how to move forward. The page calls this situation their "crossroads". They then choose a goal linked to this situation. The goal is what they truly want: it matters to them and they struggle to reach it.
In our view, the goal fits in one sentence and describes a behaviour: "Tell each analyst what their specifications lack before the review." A vague goal such as "be a better boss" gives the pixies no action to examine.
The interviewer's questions
- Why is this goal important to you? Why are you bothering? How will the people around you benefit?
- What have you done to move towards this goal? What have you done that held back your progress? Ask for tangible examples and stories rather than concepts.
- Look closer at one action that holds you back. What drew you to it? Why? And why again?
- What will happen if you stop the behaviours that move you forward? What might people say about you? What will happen to those around you?
- What will happen if you stop the behaviours that take you away from your goal? What might people say about you? What will happen to those around you?
The interview has 4 minutes for five questions: 48 seconds per question. In our view, the interviewer accepts one answer per question and keeps follow-up questions for question 3.
On our reading, questions 1 and 4 make the listener say what the goal brings them and what they would lose by giving it up. The innovator pixie draws on these answers. Questions 3 and 5 make the listener say what they gain by keeping their habits. The protector pixie draws on those. Question 2 feeds both pixies, since it asks what moves the listener forward and what holds them back.
The steps
- Introduction (1 min): the facilitator reads the structuring invitation.
- Individual reflection (2 min): each person chooses their situation and their goal.
- Demonstration (6 min): a volunteer willing to share their situation comes to the front of the room with three other people. The volunteer plays the listener. The three others play the interviewer and the two pixies. The facilitator defines the roles and has the volunteers act out each step briefly. Before each step the facilitator gives the instruction. At the end the facilitator thanks the volunteers and sends them back to their seats.
- Forming groups: the facilitator displays the questions. Participants form groups of four and choose their roles.
- Rounds (15 to 20 min per round): each group of four repeats the sequence for each person who wants to take the listener role.
- Sharing the situation (3 min): the listener describes their difficulty and their goal.
- Interview (4 min): the interviewer asks the questions. The pixies listen and take notes.
- Whispers (1 to 2 min): the listener closes their eyes. The two pixies lean towards the listener's ears and whisper their points of view at the same time.
- Pixie insights (4 min): the listener opens their eyes. Each pixie restates their point of view more clearly for two minutes.
- Small-group reflection (3 min): the group shares its thoughts and feelings.
- Plenary sharing (4 min): everyone comes back together as a whole group. What did you learn about competing commitments? How did the pixies' chatter influence your view? A few people share the reflections everyone should hear.
The steps of a round add up to 15 to 16 minutes. The page gives 15 to 20. The fixed steps add up to 1 + 2 + 6 + 4 = 13 minutes. On our reading, a one-round session lasts 13 + 15 = 28 minutes, which the page rounds to 30. A session of four 20-minute rounds lasts 13 + 4 × 20 = 93 minutes. The page puts no figure on forming the groups, which fills the gap to 95.
- 1 minIntroductionWhole group
- 2 minIndividual reflectionAlone
- 6 minDemonstrationWhole group
- no durationForming groups
- One round: 15 to 20 min
- Repeated for each listener (1 to 4 rounds)
- 3 minSharing the situationGroup of four
- 4 minInterviewGroup of four
- 1 to 2 minWhispersGroup of four
- 4 minPixie insightsGroup of four
- 3 minSmall-group reflectionGroup of four
- 4 minPlenary sharingWhole group
- One-round session: about 30 min
- Four-round session: about 95 min
In a group of four, four rounds give each person each role once. In our view, the facilitator rotates the roles by one place at each round.
When the number of participants is not a multiple of four, one to three people remain after the groups of four. In our view, one or two leftover people each join a group as observers. They listen without interrupting and speak during the reflection that closes the round. Three leftover people form a group of their own. The facilitator joins it as the interviewer. Eleven participants thus make two groups of four and a group of three people with the facilitator. A group always keeps its two pixies, since the structure sets two voices against each other.
The whispers
The page describes the whispers as chaotic chatter. In our view, the listener follows neither voice in full. They hear two voices arguing over their decision.
The pixies speak with empathy from the listener's point of view. They examine the listener's competing commitments and assumptions in a light tone without judging them. They give neither advice nor next steps. In our view, a pixie speaks in the first person as the listener's inner voice. The pixie reuses the listener's words: "If I let Marc hand in an incomplete document, I'm the one who'll get the blame."
In our view, both voices are partly right. A protector pixie who caricatures the listener's fear pushes the listener towards change and skews the exercise.
Online
A tech host opens breakout rooms of four. The host spotlights the volunteers during the demonstration. The pixies lean into their camera. The facilitator pastes the questions into the chat. Everyone keeps their camera on. In plenary, participants share aloud or in the chat.
According to the page, facial expressions, body language and tone of voice matter in this structure. Online, these signals easily go unnoticed. Two simultaneous voices in a headset can jar the listener more than they help. The listener can therefore stop the whispers at any time. If simultaneous whispering is too disruptive, the pixies take turns with rapid short phrases.
Variations
In one variation, the pixies whisper for longer: several minutes or until the listener stops them. In another, the two pixies first defend the innovator view together and then the protector view.
What makes Talking with Pixies fail
A pixie who gives advice ("You should talk to your boss about it") becomes a consultant. The listener stops hearing their own voice. The interviewer redirects the pixie.
An interview that stays abstract leaves the pixies only generalities to whisper. The interviewer then asks for a story. Behind "I don't have time", the interviewer looks for the day, the task and what the listener did instead.
According to the page, the structure requires trust between participants and builds it. In our view, a wary listener chooses a situation with nothing at stake. Their round teaches them nothing.
In our view, the facilitator puts a manager and their direct report in different groups. In their group, the listener admits to actions that hold back their progress. In front of their superior, they keep quiet about them. Before the rounds, the facilitator also announces that the stories stay in the group. In plenary, each person shares what they learned about themselves. The pixies hand their notes to the listener at the end of the listener's round.
In our view, a personal crisis calls for a professional. The facilitator says so in the invitation: each person chooses a situation they are willing to share with colleagues.
In our view, the pixies whisper in the listener's language when a group brings together French-speaking and German-speaking Swiss. A rapid whisper in a second language gets lost.
Neighbouring structures
In Troika Consulting, a client turns their back on two consultants who discuss the client's problem. In Wise Crowds, a larger group advises a client who turns their back on it. In Talking with Pixies, the pixies set two points of view against each other on what the listener has said. Creative Destruction serves the same eighth principle at the scale of a group: there the group decides what it stops doing.
Talking with Pixies in a string
The authors combine several Liberating Structures into a string.
| Site page | String | Purpose |
|---|---|---|
| Talking with Pixies | Talking with Pixies, then Spiral Journal or Positive Gossip | Bring attention back to the present moment |
| Talking with Pixies | Talking with Pixies combined with User Experience Fishbowl | Let a large group listen while a leader talks with their pixies |
| Wise Crowds | Wise Crowds with Helping Heuristics, Nine Whys or Talking with Pixies | Give the members of the group more support |
Origin
The page attributes the structure to Ian Prinsloo, Keith McCandless and members of the Seattle Liberating Structures user group. It also points to the "immunity to change" mechanisms that Robert Kegan and Lisa Lahey describe. Kegan and Lahey use the term competing commitment in a Harvard Business Review article (2001).
AI considerations
Before the session, a language model translates the invitation and the questions for a bilingual group. A native speaker checks that question 3 keeps its repeated "why" and that the invitation keeps its playful tone.
A person who reflects alone on their situation can ask a model to play both pixies. In our view, the model does not replace the group's pixies. It has not heard the interview. It perceives neither the listener's tone nor their hesitations.
In our view, nobody records or transcribes the rounds. Online, the tech host turns off recording and automatic transcription in the breakout rooms. The pixies' notes describe an identifiable person. They are personal data within the meaning of art. 5 let. a of the Federal Act on Data Protection (FADP, SR 235.1). Nobody passes them to an external AI service.
Examples
Both pixies draw their whispers from the same things the listener said in the interview. The table shows their notes from a round in which the listener is a business analysis team leader at a pension fund. For three months she has put off telling two analysts that their specifications fall short. Her goal: "Tell each analyst what their specifications lack before the review."
| What the listener says | What the pixies hear | Innovator pixie | Protector pixie |
|---|---|---|---|
| "I correct their documents myself in the evening." (question 2) | Competing commitment: keeping the team safe from stress | "If I stop correcting in the evening, they learn. I get my evenings back." | "If I correct them myself, the document goes out on time. Nobody is offended." |
| "My old boss used to tear our documents apart in meetings. I swore I'd never do that." (question 3) | Assumption: all criticism humiliates | "My old boss humiliated people. When I tell Marc what his document lacks, I help him improve." | "What if I became like him?" |
| "If I criticise Marc, he'll ask for a transfer." (question 5) | Assumption: criticism makes people leave | "Maybe Marc is waiting for someone to tell him where he stands." | "The team is already two people short. One more departure delays the project." |
No pixie tells the team leader how to word her criticism. In our view, the pixies keep the second column to themselves. A pixie who names the assumption aloud judges it.
Visualisations
One diagram shows a group of four from above during the whispers. A second places the steps on a time axis and shows the round that repeats for each listener. The roles, the strings and the pixies' notes fit in rows and columns.
Cost
| Phase | Level | Justification |
|---|---|---|
| Preparation | Low | Display the steps and the questions. Provide four chairs per group. Find a volunteer for the demonstration. |
| Execution | Medium | 30 to 95 minutes depending on the number of rounds. The structure needs a group whose members already trust one another. |
| Documentation | Low | In our view, the pixies hand their notes to the listener. The facilitator records a few lessons from the plenary. |
Tooling
In the room, chairs in groups of four are enough. A screen or a flipchart displays the steps and the questions. In our view, a printed question card for each group saves the interviewer from looking away to the screen. The pixies take their notes on paper. A timer helps the interviewer keep to the durations.
Online, a videoconferencing tool (Zoom, Microsoft Teams) hosts the groups of four in its breakout rooms and offers the chat and the spotlight. In our view, the listener wears a headset so that the whispers stay in the group. In a shared office or at home, nobody else hears them.
Sources
The Liberating Structures site publishes the structure under the Creative Commons BY-SA 4.0 licence.
- Talking with Pixies, Liberating Structures: the invitation, the roles, the questions, the steps and their durations, the online format, the tips, the variations, the strings and the attribution.
- The LS Principles, Liberating Structures: the eighth principle and what it asks.
- Wise Crowds, Liberating Structures: the string that leads from Wise Crowds to Talking with Pixies.
- Robert Kegan and Lisa Lahey, The Real Reason People Won't Change, Harvard Business Review, November 2001: the term competing commitment.
- Robert Kegan and Lisa Lahey, Immunity to Change, Harvard Business Review Press, 2009: the immunity-to-change mechanisms that the page points to.
- Federal Act on Data Protection (FADP), SR 235.1, art. 5 let. a: the definition of personal data, which the pixies' notes contain.

