On the left, the causal loop diagram of an IT service desk. New tickets increase pending tickets. New tickets also increase target staff. Pending tickets increase target staff. Target clearance time decreases target staff. Target staff increases staff after a delay. Two bars across the arrow mark this delay. Staff increases resolved tickets. Resolved tickets decrease pending tickets. The loop carries the marker B Clearance. On the right, two charts over 40 weeks after new tickets rise from 100 to 130 per week in week 4. With a one-week adjustment delay, the backlog peaks at 24 tickets in week 6 and staff rises to 13.5 FTE. With an eight-week delay, the backlog peaks at 110 tickets in week 11. Staff then overshoots the 13 FTE needed and peaks at 14.3 FTE in week 19.

System Dynamics

System dynamics is a modelling and simulation method. It describes an organisation through its feedback loops, stocks, flows and delays. A feedback loop links a variable back to itself through a chain of causes: pending work pushes the organisation to add staff; the larger team reduces the pending work. A stock accumulates what its flows add to it and take from it. The analyst first draws the loops in a causal loop diagram. Next, the analyst translates the structure into equations and simulates the model over weeks or years. The simulation shows how performance evolves and what a policy changes before the organisation applies it.

Goal

System dynamics is a modelling and simulation method. The System Dynamics Society describes it as a computer-aided approach to designing strategies and policies. In system dynamics, a policy is a decision rule: how many people to hire, when to order, what price to charge.

Jay W. Forrester founded the discipline at MIT. As early as 1956, his hand simulations of a General Electric plant showed that its unstable employment came from the internal structure of the company rather than from the business cycle. Forrester published Industrial Dynamics in 1961. It was the first book of the discipline.

The technique explains why an indicator grows, oscillates or stagnates. It then looks for the policy that changes this behaviour. Forrester describes social systems as multiple-loop non-linear feedback systems. In his view, the human mind is not adapted to interpreting how they behave. In such systems the presumed remedy sometimes makes the problem worse. Most people look in the wrong place for the points where an intervention works.

The deliverable is a documented model: the reference mode, the model boundary chart, the causal loop diagram, the stock and flow diagram, the equations and the simulation results of each policy tested.

Usage

When to use it

  • Problem that returns after each fix: look for the loop that undoes the effect of the fix.
  • Long delay between a decision and its effect: hiring, training, construction; test whether the delay makes the result oscillate.
  • Oscillating indicator: headcount, inventory, order backlog; look for the delayed balancing loop.
  • Growth that slows with no visible cause: look for the balancing loop that takes over.
  • Several levers to compare on overall performance: simulate each policy before applying it.
  • Disagreement on the cause of a lasting problem: compare the stakeholders' mental models in a shared diagram.

When not to use it

Description

The elements of the model

A variable is a quantity that changes over time: the number of pending tickets, the staff level, the resolution rate. A causal link is an arrow from one variable to another. It carries a polarity. The + sign says that, all else being equal, the two variables move in the same direction. The − sign says that they move in opposite directions.

A feedback loop is a chain of links that returns to its starting variable. A reinforcing loop (R) amplifies a change that travels around it: word of mouth increases the number of customers, who increase word of mouth. A balancing loop (B) opposes the change and brings the variable back towards a goal. A loop with an even number of negative links is reinforcing. A loop with an odd number is balancing. The analyst confirms this count by following a change all the way round the loop.

A delay separates a cause from its effect: the time to hire, to train, to deliver. The diagram marks it with two parallel bars across the arrow. A delay in a balancing loop can make the loop overshoot its goal and then oscillate around it.

A stock is an accumulation: pending tickets, a workforce, cash. It describes the state of the system at a given moment. Only its flows change it: the inflow raises it; the outflow lowers it. The stock accumulates its flows over time. It gives the system its memory and its inertia. It is also the source of delays.

The causal loop diagram

The causal loop diagram connects the variables with signed arrows. Each loop gets an identifier (R1, B1) and a short name that says what it does: "Word of mouth", "Clearance". Sterman sets out the rules for building one.

  • Unambiguous polarity: a link whose sign depends on circumstances hides several paths. The analyst separates them with intermediate variables.
  • Causal links only: a correlation describes past behaviour. The structure that produces this behaviour may be quite unlike what the correlation suggests.
  • An explicit goal for each balancing loop: the diagram shows the goal as a variable. In the service desk, target staff is the goal of the "Clearance" loop: it covers the new tickets and empties the backlog in four weeks.
  • Delays marked: a delay missing from the diagram also disappears from the reasoning.

The causal loop diagram treats a stock and a flow the same way: two variables joined by an arrow. So it ignores what accumulates. It computes no behaviour over time. The stock and flow diagram fills both gaps.

The stock and flow diagram

The stock and flow diagram uses a hydraulic metaphor. The stock is a box. The flow is a pipe that enters or leaves the box. A valve on the pipe sets the rate. A cloud marks the source or the sink of a flow that comes from outside the model or leaves it. Thin arrows connect the constants and the auxiliary variables to the valves they control.

Each valve gets an equation and each stock an initial value. The software computes the stocks step by step. At each time step it adds the inflow and subtracts the outflow. The time step lies between a quarter and a tenth of the shortest delay in the model. The analyst then halves the step: if the results change, the step was too long. The units must match: a flow in tickets per week accumulated over weeks gives tickets. Unit consistency is the first test of any model.

Reading structure from behaviour

Each behaviour mode signals a loop structure. Exponential growth signals that a reinforcing loop dominates over the period observed. Goal seeking signals a balancing loop. Oscillation signals a delay in a balancing loop. Growth that slows signals that a balancing loop takes over as a limit approaches: the size of a market, the capacity of a team, a stock of resources. S-shaped growth arises from this shift in the dominant loop. A delay in this balancing loop can make the system overshoot the limit and then oscillate around it. If the growth consumes the limit itself, the overshoot ends in collapse.

Exponential growth
Time
Dominant reinforcing loop
Goal seeking
Time
Balancing loop
Oscillation
Time
Balancing loop with delay
S-shaped growth
Time
Reinforcing loop, then dominant balancing loop
Growth with overshoot
Time
S-shaped growth and delay in the balancing loop
Overshoot and collapse
Time
The growth consumes its limit
The behaviour modes according to Sterman and the loop structure that produces each one. The observed curve guides the dynamic hypothesis.

The dominant loop can change over time. The analyst starts from the observed curve and formulates a hypothesis about the structure that produces it. The simulation then shows whether this structure reproduces the curve.

Running the study

The modelling process iterates: a failed test sends the team back to the hypothesis; a surprising policy sends it back to the loops. The gaps between the formal model and the participants' mental models improve both.

1. Articulate the problem

The team names the problem, the key variables and the time horizon. The horizon reaches far enough into the past to show how the problem arose. It reaches far enough into the future to capture the delayed and indirect effects of a policy. The team then plots the reference mode: the historical curve of each variable and its expected path. This graph defines what the model will have to explain. The complaint "the support desk is swamped" becomes a curve: the number of pending tickets week by week over the last twelve months.

2. Formulate the dynamic hypothesis

The dynamic hypothesis is a working explanation of how the problem arose. It looks for an endogenous explanation: the loops of the model produce the observed behaviour. According to Sterman, the modeller learns to distrust exogenous variables. Each one is a cause that the model gives up explaining. The model boundary chart sorts the variables into endogenous, exogenous and excluded. The causal loop diagram draws the hypothesis.

EndogenousExogenousExcluded
Pending ticketsNew ticketsTraining of new hires
Resolved ticketsProductivity per FTEAbsences and holidays
StaffTarget clearance timeReopened tickets
Target staffStaff adjustment delayService desk budget
Staff adjustment
The model boundary chart of the IT service desk. The model computes the endogenous variables and receives the exogenous variables. The excluded variables stay outside the model.

3. Formulate the model

The analyst translates the diagram into stocks, flows and equations. Each decision rule becomes an explicit equation: how the service desk computes target staff, how long it takes to reach it. The parameters come from data. Where data is missing, the managers estimate them. The analyst records where each value comes from. Sterman calls a modeller careless if they set numerical data aside on the grounds that the model exists to build understanding.

4. Test the model

The model must reproduce the reference mode. The tests go further. The extreme conditions test pushes a parameter to zero or to an absurd value: with no staff, the desk resolves no tickets; with no new tickets, the backlog empties. Sensitivity tests change the boundary, the aggregation and the representation of decisions. Sterman observes that the results depend more on these choices than on the parameter values. Modellers rarely test these sensitivities.

For Sterman, every decision rests on a model and every model is wrong. He therefore rejects the word "validation". A test measures whether the model serves the purpose set for it.

5. Design and evaluate policies

The team describes possible future conditions: a rise in demand, a staff shortage. It simulates each policy under each condition. It judges each policy on the whole trajectory: a peak, an overshoot, a period when things get worse before they get better. The end result hides these differences.

What the BPM CBOK takes from it

The BPM CBOK places system dynamics among the specialised approaches to process modelling, alongside the value chain and SIPOC. It treats it as a macro view: a model of an entire enterprise or line of business that simulates the overall performance of the organisation. The model compares the effect of changing several variables.

The CBOK calls these models "activity on arrow" diagrams. Its example is a stock and flow diagram: the activity there is a flow that a pipe carries between two stocks. In the causal loop diagram, the nodes are variables and the arrows causal links. The CBOK speaks of "controlled animation". The discipline speaks of simulation over time, which the animation only displays.

The discipline handles influences external to a process: the model boundary chart lists the exogenous variables. The discipline still pushes the modeller to explain behaviour through the internal loops.

Pitfalls

A boundary drawn too narrow

According to Sterman, models rarely fail because of poor statistical technique. Among the causes of failure he names a boundary so narrow that it cuts off decisive feedback. The service desk model excludes the training of new hires. If each recruit takes up a colleague's time during the first weeks, the added staff first reduce capacity and the backlog grows. This excluded loop can overturn the conclusion. The boundary chart makes this choice visible and open to debate.

Hidden assumptions

A client who cannot see a model's assumptions accepts or rejects its results without being able to discuss them. The analyst documents each equation: its justification, its unit, the source of its parameters.

Stakeholders kept out

A model built without the people who decide rarely changes their decisions. Their mental models stay intact. Causal loop diagram workshops bring together the people who live with the problem. The analyst tests the formal model against their experience at each iteration.

A model judged on history alone

A model that reproduces the past can do so for the wrong reasons. A tuned parameter sometimes compensates for a missing loop. Extreme conditions tests and sensitivity tests expose these compensations. Modellers and clients also seek to confirm what they already believe. A test that can make the model fail teaches the team more than a test that confirms it.

AI considerations

A language model turns interview notes into a first list of variables and causal links. The analyst checks each link. The language model often proposes a plausible correlation as a cause. It also assigns polarities without justifying them. A link stays in the diagram when the managers confirm the mechanism that produces it.

The language model also writes the equations: an XMILE file for a system dynamics package, a Python script or a spreadsheet with one time step per row. It checks unit consistency and proposes extreme conditions tests. The analyst runs these tests and reads the results first-hand. A language model that predicts the behaviour of a system without running a simulation attempts what Forrester says human intuition cannot do in multiple-loop systems.

Data on headcount, salaries and customers stays out of online services whose terms of use the organisation does not control. A value that the language model proposes remains an assumption to confirm.

Examples

The IT service desk of a cantonal administration receives and resolves 100 tickets per week with 10 full-time equivalents (FTE). In week 4, a new application raises new tickets to 130 per week. The service desk aims to clear its backlog in four weeks. It compares two staffing policies. The staff adjustment delay is one week with temporary staff and eight weeks with permanent posts advertised through a public job posting. The model is illustrative.

A delay in the balancing loop changes the trajectory of the service desk.

++−+++−B ClearanceNew ticketsTargetclearance timePending ticketsTarget staffStaffResolved tickets Adjustment delay: 1 week (temporary staff)Adjustment delay: 8 weeks (permanent posts)010203040040801209111315Pending ticketsStaff (FTE)WeeksDemand: 100 → 130 tickets per weekNeed: 13 FTE Adjustment delay: 1 week (temporary staff)Adjustment delay: 8 weeks (permanent posts)010203040040801209111315Pending ticketsStaff (FTE)WeeksDemand: 100 → 130 tickets per weekNeed: 13 FTE
Illustrative model
The causal loop diagram of the service desk and its simulation over 40 weeks. With an eight-week adjustment delay, the backlog peaks higher and later. Staff then overshoots the 13 FTE needed.
PolicyStaff adjustment delayBacklog peakWeek of the backlog peakMaximum staffWeek of the staff peakWeek the backlog falls below 1 ticket
Temporary staff1 week24 tickets613.5 FTE816
Permanent posts8 weeks110 tickets1114.3 FTE1923
The two staffing policies of the service desk simulated over 40 weeks. Values read at the end of each week.

At 10 tickets per FTE, 130 tickets per week require 13 FTE. Both policies reach that level. With permanent posts, the new staff arrive when the backlog is already emptying. The same eight-week delay also slows the reduction in staff: the service desk still has 13.8 FTE in week 24 and 13.3 FTE in week 32.

Visualisations

The analyst presents a system dynamics model through a causal loop diagram, a stock and flow diagram and graphs of behaviour over time. The stock and flow diagram of the service desk shows what the causal loop diagram hides: the backlog and the staff are stocks. Each keeps its value as long as its flows do not change it.

B ClearancePending ticketsStaffNew ticketsResolved ticketsStaff adjustmentTarget staffProductivity per FTETarget clearancetimeStaff adjustment delay B ClearancePendingticketsStaffNewticketsResolvedticketsStaffadjustmentTarget staffProductivityper FTETargetclearancetimeStaff adjustmentdelay
The stock and flow diagram of the service desk. The backlog and the staff are stocks. The Clearance loop runs through both.
VariableTypeEquationUnit
Pending ticketsStockAccumulation of (New tickets − Resolved tickets) starting from 0tickets
New ticketsExogenous inflow100 until week 4, then 130tickets per week
Resolved ticketsOutflowStaff × Productivity per FTE up to the tickets availabletickets per week
StaffStockAccumulation of Staff adjustment starting from 10FTE
Staff adjustmentFlow(Target staff − Staff) ÷ Staff adjustment delayFTE per week
Target staffAuxiliary variableNew tickets ÷ Productivity per FTE + Pending tickets ÷ (Productivity per FTE × Target clearance time)FTE
Productivity per FTEConstant10tickets per FTE per week
Target clearance timeConstant4weeks
Staff adjustment delayConstant (policy tested)1 or 8weeks
The equations of the service desk model. Time step: a quarter of a week.

The staff adjustment works downwards as well as upwards. The analyst writes this assumption into the equation, where the client can challenge it.

Cost

PhaseLevelRationale
PreparationMediumFrame the problem, collect the historical data and bring together the people who decide.
ExecutionHighWorkshops for the causal loop diagram, then formulation, tests and policy simulations over several iterations.
DocumentationHighEach equation with its unit, its assumptions and the source of its parameters, plus the record of the tests.

Tools

A whiteboard is enough for the causal loop diagram in a workshop. The participants write the variables on sticky notes and draw the links with a marker.

A spreadsheet simulates a small stock and flow model with one row per time step and one column per variable. Each stock equals its previous value plus the net flow multiplied by the time step. Beyond a few stocks, the sheet becomes unreadable.

System dynamics software draws the stock and flow diagram, carries the equations with their units and plots the curves. Vensim, Stella, iThink and Powersim are examples. Vensim PLE is free for education and personal use. Ventana Systems, which publishes Vensim, requires a licence from companies and public administrations for any use beyond evaluation.

The OASIS XMILE standard defines a file format that moves a model from one system dynamics package to another.

A Python script suits a model that must be under version control or run as part of a data pipeline. The file itself documents the equations.