Strategy Knotworking (SKW)
Strategy Knotworking (SKW) is a meeting structure from Liberating Structures in which a group develops its strategy by answering six questions together. The questions cover the purpose, the baseline, the context, the challenge, the ambition and then action and evaluation. The group answers each question with another structure from the repertoire. For example, it works on the context with Critical Uncertainties. It writes its answers on a shared wall template. At the end, it tells the strategy story by talking through the six questions. Keith McCandless, Johannes Schartau, Fisher Qua and Nancy White developed the structure. The authors' site gives it about six hours in one block or spread over up to four days.
Goal
With SKW, an organisation, a programme or a team develops its strategy with the people who will execute it. The monograph by Keith McCandless and Johannes Schartau places the method between two common practices. In the first, a small circle far from the daily work writes a multi-year plan and then has to sell it to the rest of the organisation. In the second, agile teams react in the moment and give up on planning. The authors propose a middle path: everyone shapes the strategy in short cycles and keeps several plausible futures in view. They define strategy as a collective activity. It makes continuous progress on a purpose that is worth the effort but never fully reached. It keeps adjusting what the group does to what the group aims for.
The site ties SKW to the sixth principle of Liberating Structures: Amplify Freedom AND Responsibility. According to the authors, the participants take shared ownership of the goals and respond better to uncertainty.
The session produces the completed SKW template. It carries the purpose statement with its progress indicators, the Ecocycle map of current activities, the robust and hedging strategies, the paradoxes to address, a first list of options and then a limited number of priority strategies. Each chosen strategy receives its next steps and its progress indicators. The group also sets the date of the next review.
The answers feed strategy analysis: the purpose clarifies the business need, the baseline describes the current state and the ambition sketches the future state. The business analyst measures the value delivered with the progress indicators. The robust strategies go into the solution options and into the business case. A hedging strategy goes into the risk register. The priority strategies feed the roadmap. You will find the other structures of the repertoire under Liberating Structures.
Usage
When to use it
- A strategy needed in a fast-changing environment (programme, international NGO): have the strategy written by the people who will execute it.
- An agile team without strategic direction: link the work of the iterations to a purpose and to explicit strategies.
- A major transition: prepare the group before a merger, a reorganisation or a change of mandate.
- A strategy retreat over several days: spread the six questions over up to four days.
- A strategy already in execution: use the six questions as a checklist at each review.
- No six-hour slot available: start with one-to-one interviews of 15 to 30 minutes on the six questions.
- A distributed team: run the session online with the same small groups in every round.
When not to use it
- A strategy entirely set by senior management: organise its execution with Purpose-To-Practice and What I Need From You.
- A single open question: use only the structure that answers it, for example Critical Uncertainties for the environment.
Description
The six questions
The wording of the six questions comes from the authors' site.
1. Purpose. "What is the fundamental justification and deepest need for our work?" The group answers it with 1-2-4-All and merges the answers into a single purpose statement on the template. It then writes progress indicators in the format "We are making progress on our purpose when (who) does (what) and that creates (desired outcome)." The monograph recommends a statement in the form "We exist to stop or end…" or "We exist to start…". According to the monograph, a purpose stays true in the present. A vision projects a future that surprises will prove wrong.
2. Baseline. "Where are we starting from, honestly?" The group places its current capabilities, actions and relationships on an Ecocycle Planning map. The map occupies the centre of the template. Everyone returns to it and refines it during the later questions.
3. Context. "What is happening around us that demands creative change? What do we have to pay attention to?" With Critical Uncertainties, the group imagines several futures from the two most critical uncertainties. It records its robust and hedging strategies on the template. A robust strategy succeeds in several scenarios. A hedging strategy prepares the group for only one. The group takes them up again in the fifth question.
4. Challenge. "What are the equally important yet competing pressures or demands we must face in order to make progress?" The site calls this element challenge or paradox. With Wicked Questions, the group names the pressures that it must address at the same time. The site also allows Creative Destruction or another structure.
5. Ambition. "Given what has emerged from the first four questions, what seems possible now?" The group reviews the template and looks for bold yet actionable next steps. The site describes its own steps and allows 25/10 Crowd Sourcing or Future~Present in their place. The options that the group keeps form the first draft of the strategy.
6. Action and evaluation. "What is our next step and how will we know if we are making progress?" The group prioritises a limited number of strategies. For each one, it names the next steps and the progress indicators. The group then tracks progress on the Ecocycle map and coordinates the actions on a kanban board.
Preparing the session
The facilitator invites everyone with a stake in the strategy. The site accepts a group of one. A person who stays away receives a strategy they did not write.
The facilitator prepares an open wall with the SKW template, a large roll of paper, markers and sticky notes. Each participant in the room receives a copy of the template or draws their own. The answers go on sticky notes so that the group can change them and move them around. The facilitator also prepares the material for each embedded structure, for example the Ecocycle map and the Critical Uncertainties grid.
The facilitator decides whether the session runs in one block or spreads over up to four days. When the group works in several sessions, the site asks it to address at least one question thoroughly each time. In each session, the group sets aside time to look back at the purpose and to announce what comes next.
The facilitator runs several structures in a row and must master each one before the session. The business analyst facilitates or contributes to the content. An analyst who wants to argue for a strategic option leaves the facilitation to someone else.
The steps according to the authors' site
The structuring invitation presents the group as a team of explorers who plan their route for the next five to ten years. The group maps its purpose, its context, its challenges, its current state and its next steps in quick cycles.
- Introduction (3 min): the facilitator reads the structuring invitation and presents the six questions. The facilitator then displays the template and hands out the copies.
- Purpose (60 min): each person reflects first alone and then in a pair on the question "Why does our work truly matter, both to us and to the wider world?" (10 min). The pairs form groups of four that draft a purpose (20 min). In plenary, a few groups present their draft. The room merges the drafts into one purpose and writes its progress indicators (30 min).
- Baseline (60 min): the group builds the Ecocycle map of its activities.
- Context (90 min): the group runs Critical Uncertainties.
- Interlude and break (10 to 20 min): the facilitator explains the loop of the last three questions. For each one, the small groups work, then present their findings in plenary and complete the template. The group can return to an earlier answer and above all to the purpose. Then comes the break.
- Challenge (30 min): the group runs Wicked Questions or another structure.
- Ambition (50 min): the group reviews the template and asks whether it needs to adjust its purpose (10 min). Each person lists bold yet actionable next steps alone (10 min). Groups of four compare their ideas and choose the best ones (10 min). In plenary, the room adds the options it keeps to the template as the first draft of the strategy (20 min).
- Action and evaluation (53 min): the facilitator opens the question (3 min). The groups from the fifth question prioritise a limited number of strategies. For each one, they name the next steps and the progress indicators (20 min). In plenary, the room adds these strategies to the template to make the final version. It examines how the strategies reinforce one another (30 min).
- Milestones (5 min): the group sets when it will review and adjust its strategic plan.
The site announces 60 minutes for the sixth question. Its three steps add up to 53. With the break, the session lasts about six hours.
- 3 minIntroductionPlenary
- 60 minPurposeAlone then in pairs 10 minGroups of four 20 minPlenary 30 min
- 60 minBaselineEcocycle Planning
- 90 minContextCritical Uncertainties
- 10 to 20 minBreak
- 30 minChallengeWicked Questions
- 50 minAmbitionTemplate review 10 minAlone 10 minGroups of four 10 minPlenary 20 min
- 53 minAction and evaluationOpening 3 minGroups from question 5 · 20 minPlenary 30 min
- 5 minMilestonesPlenary
- about 6 h
According to the site, SKW runs online without major adaptation. In the purpose round, each person reflects alone for 5 minutes instead of working in a pair. The groups of four become trios in breakout rooms. The session moves often between the main room and the breakout rooms. The facilitator therefore keeps the same small groups in every round.
Going back to earlier answers
According to the monograph, the group takes the questions in order but the answers fall into place as the links between them emerge. An ambition can show that the purpose is too narrow. A robust strategy can lead the group to move an activity on the Ecocycle map. The site asks the group to go back over its earlier answers when the fifth question opens: "Do we need to adjust our purpose?"
Variations
The site allows another structure for each of the six questions. The group can also work through the questions again over several months to sharpen its answers.
The monograph proposes lighter ways in. In the first, the facilitator interviews people from different roles one at a time on the six questions in sessions of 15 to 30 minutes. In the second, the group holds a monthly or quarterly session with Critical Uncertainties, Ecocycle Planning and What I Need From You.
The monograph's version
The monograph describes SKW with a different order and different structures. It dates from the time when the repertoire counted 33 structures. The book The Surprising Power of Liberating Structures by Henri Lipmanowicz and Keith McCandless (2013) presents that repertoire. The monograph's version therefore predates the site's. A description that puts the context second follows that version.
| Element | Monograph (business school example) | Authors' site |
|---|---|---|
| Purpose | 1. Nine Whys | 1. 1-2-4-All |
| Context | 2. Critical Uncertainties | 3. Critical Uncertainties |
| Challenge | 3. Wicked Questions | 4. Wicked Questions or Creative Destruction |
| Baseline | 4. What I Need From You | 2. Ecocycle Planning |
| Ambition | 5. 25/10 Crowd Sourcing | 5. The site's own steps, 25/10 Crowd Sourcing or Future~Present |
| Action and evaluation | 6. Ecocycle Planning | 6. Ecocycle map and kanban board |
| Duration | Not stated | About 6 hours |
What makes SKW fail
A purpose such as "stay profitable" or "keep our shareholders happy" does not say why the work matters. The monograph quotes answers of this kind and refuses to call them a purpose. The site asks for a purpose that the participants find compelling. A weak purpose leaves the other five answers without a criterion.
When the first questions overrun, the ambition and the action run short of time. Yet these two questions produce the strategy. The site asks the group to work in quick cycles and to start each step on time.
A group that confuses context and challenge fills the same box twice. According to the site, the context maps the obstacles and the opportunities. The challenge specifies the opposing tendencies that the group must address together. A drop in subsidies belongs to the context. "Cut costs while widening the range of services" belongs to the challenge.
A list of ten strategies in the sixth question scatters the effort. The site asks for a limited number of strategies for immediate action.
Senior management that arrives with its strategy already set turns the session into a consultation. The facilitator announces at the start what is already decided. The group treats those decisions as constraints.
The answers about the purpose and the baseline ("Where are we starting from, honestly?") sometimes force the participants to contradict the senior managers in the room. When the managers speak first in plenary, they set the purpose. With 1-2-4-All, everyone writes alone first. The managers sit in the small groups as participants. When the participants will not speak openly in front of the managers, the facilitator runs the one-to-one interviews that the monograph proposes before the session.
A template without a review date freezes the strategy on the day of the session. The group sets its milestones before it leaves the room.
SKW in a string
The site proposes opening with Spiral Journal or Drawing Together to widen the participants' view. After SKW, Purpose-To-Practice and What I Need From You make the strategies operational. Celebrity Interview spreads the results beyond the group.
Origin
The site credits SKW to Keith McCandless, Johannes Schartau, Fisher Qua and Nancy White. The monograph Liberating Strategy: Surprise and Serendipity Put to Work by Keith McCandless and Johannes Schartau presents the six questions. It illustrates them with a fictional business school. It thanks Fisher Qua and Nancy White for their contributions to that example.
The word knot appears in the monograph at the What I Need From You step, which it titles "Cross-Functional Knot-Working". That step works out the knots between functions.
AI considerations
Before the session, a language model summarises the annual reports, the market studies and the project reviews into a list of external factors. In the context round, the group searches that list for the uncertainties it has not named. The group itself chooses the two critical uncertainties.
The model also prepares the list of current activities from an export of the project portfolio. The facilitator prints it for the baseline. The group itself places each activity on the Ecocycle map.
The model does not draft the purpose. The authors build SKW on a strategy that the group writes itself. A purpose written by a model reproduces the small circle that the method sets out to widen.
After the session, the model transcribes the photos of the wall into a document structured by question. The model reads the handwriting on sticky notes poorly. A participant therefore checks the transcription against the photos before the document circulates. The model then checks that each chosen strategy has a next step, a progress indicator and a link to the purpose. At the next review, the group settles each gap that the model flags.
An unpublished strategy is confidential information. The facilitator gives the photos of the wall only to an AI service that the organisation has approved.
Examples
The IT department of a cantonal hospital runs SKW with nurses, doctors and IT staff.
Each chosen strategy traces back to an earlier answer. Single entry at the bedside serves the purpose and succeeds in every scenario of the context. Replacing the fax comes from the Ecocycle map, where the group had placed it in the Rigidity Trap. The secure messaging takes up the hedging strategy from the context. Of the three options from the ambition, the group keeps two strategies. The option "Forms built by the super-users" stays on the template until the next review.
Visualisations
A diagram shows the SKW template: the Ecocycle map in the centre and the six questions around it with their structure. A second diagram places the site's steps on a time axis. A table compares the monograph and the site. The example shows the template as the hospital's IT department filled it in.
Cost
| Phase | Level | Justification |
|---|---|---|
| Preparation | High | Invite everyone with a stake in the strategy, prepare the template and the material for each embedded structure, choose between one block and several days. |
| Execution | High | About six hours with everyone concerned. The facilitator runs several structures in a row. |
| Documentation | Medium | Transcribe the template, track the strategies on the Ecocycle map and the kanban board, prepare each review. |
Tooling
When the whole group is in the room, paper on the wall is enough. The Ecocycle map prints in large format. A visible timer keeps the pace of the steps.
For a hybrid group, the template moves to a collaborative whiteboard (Miro, Mural). The remote participants then see the same wall as the room. The collaborative whiteboard also suits a strategy that must stay editable between two reviews. For a remote session, a video conference with breakout rooms (Zoom, Microsoft Teams) hosts the small groups.
After the session, the group tracks the progress of the strategies on the Ecocycle map and coordinates the next steps on a physical or digital kanban board.
Sources
The site's page describes the current steps. The monograph sets out the six questions, their rationale and an earlier order. The site publishes the structure under a Creative Commons BY-SA 4.0 licence.
- Strategy Knotworking (SKW), Liberating Structures: the invitation, the materials, the participation, the steps and their timings, the online run, the tips, the variations, the applications, the proposed string and the attribution.
- Keith McCandless, Johannes Schartau, Liberating Strategy: Surprise and Serendipity Put to Work, monograph: the two practices that the authors set against their method, their definition of strategy, purpose set against vision, the order and the structures of their version, the fictional business school, the image of the knot and the two lighter ways in.
- The LS Principles, Liberating Structures: the sixth principle, Amplify Freedom AND Responsibility.

