Special purpose records
Special purpose records are a work measurement method: the people who do the work note the volume, type or duration of their own tasks as they work. They fill in a form designed for a single study. Its categories are set in advance. The analyst designs the form, oversees the collection and totals the records. The Office québécois de la langue française gives the name auto-analyse continue (continuous self-analysis) to the variant applied to an administrative job: the person notes the start time of each task. The United Nations guides on time-use statistics call this mode of collection self-reporting.
Goal
Special purpose records measure a team's work when no system measures it: how many units the team handles, of what type and in how much time.
According to the OQLF, the durations recorded in auto-analyse continue determine the cost price and the workload of a job. They also serve to allocate tasks or staff and to set the average time of each operation. In needs assessment, the records establish the baseline: the hours that each type of work costs today. The analyst uses them to size a team, to put a figure on the gain from automation or to describe the current process with its volumes.
The deliverable is the set of completed forms and their totals: the hours or counts per category, per day and over the period.
Usage
When to use it
- No system measures time per task: the people note it while they work.
- Sizing a team: obtain the total duration of each type of work over a period.
- Before automation: measure the hours that the targeted task costs and put a figure on the gain.
- Allocating tasks: see who carries which type of work before redistributing it.
- Fragmented or irregular work: cover a whole week where observation covers a few half-days.
- Distributed or remote team: the form follows each person wherever they work.
- Limited analyst time: each person records their own work; the analyst designs the form and checks the totals.
When not to use it
- The system already records durations: extract the time-stamped tickets or the billable-hours entries.
- The question concerns a defect and its cause: keep a check sheet.
- Announced restructuring: people who note their hours fear for their jobs; use observation instead.
Description
Who writes down the work
The United Nations guides on time-use statistics classify collection modes by the person who writes. These guides are written for the statistical offices that measure how a population uses its time. In self-reporting, the respondent writes down their own time use. In retrospective interviews and in direct observation, someone else writes. Special purpose records apply self-reporting to the work of a team. A questionnaire asks the same people afterwards.
| Special purpose records | Observation | Questionnaire | |
|---|---|---|---|
| Who writes | The person who does the work | The analyst | The person who does the work |
| When | During the work | During the work | Afterwards and from memory |
| Analyst's work | Design the form and check the records | Observe throughout the measured period | Design the questions and analyse the answers |
| Main risk | Recording burden, detail that varies between people, figures that the person overstates or understates on purpose | Short period for lack of analyst time | Recall bias |
The 2024 guide notes that a diary kept in real time avoids recall bias. It also names the price: a cognitive burden for the person and a level of detail that varies from one person to another.
The elements of the form
The header carries the study question, the person or job, the period and the unit: a count, hours or quarter-hours.
The category list sets the types of work to distinguish. The 2005 guide places the practical limit of a pre-printed list at about 30 activities. Beyond that, the form becomes hard to handle and slow to fill in. The 2024 guide adds that a long list tires the person and produces classification errors. A pre-printed list reminds the person of tasks they would forget. It also pushes them to tick the nearest category: a one-line definition per category limits this drift. About ten categories are enough for most team studies: this is our judgement. An Other row collects the tasks that the list does not cover. The person writes the label of each one there.
The grid sets the categories against time: categories in rows, days or time slots in columns. A totals row closes each day. The 2005 guide sees the 24-hour constraint as an internal consistency check: the activities recorded must fill the day. A record that covers the whole working day carries the same check. The day's total must equal the clocked hours. Applying this check to the workplace is our reading.
For a diary filled in without an interviewer, the 2024 guide recommends examples and instructions that are complete and short. The standard paper diary of the Harmonised European Time Use Surveys (HETUS) contains a cover page, pages of instructions and examples, the diary and a checklist. With this checklist, the person checks that they avoided the common errors and completed every part.
Counting or measuring duration
To count, the person makes one tally mark per unit handled in the day's box: a claim form entered, a call taken. To measure, they note hours or quarter-hours. The same sheet can carry both: a count column next to the hours. The hours divided by the count give the average time per unit of work.
| Category | Count | Hours | Minutes per unit |
|---|---|---|---|
| Entering paper claim forms | 32 claim forms | 8.00 | 15 |
| Policyholder calls | 88 calls | 11.00 | 7.5 |
| Requests for documents | 24 requests | 6.00 | 15 |
| Calculation and settlement | 27 settlements | 11.25 | 25 |
Pre-printed list or free text
Both guides contrast two forms of diary. The full diary lets the person describe each activity in free text. A coder then classifies each entry. The light diary carries a pre-printed list of activities that the person ticks. A pre-printed list costs less to process. Free text uncovers activities that nobody had foreseen.
The 2005 guide notes that a pre-printed list can be an advantage when the study concerns activity categories chosen in advance. It cites a diary of this type for teachers' work. During the trial days, the form uses free text: its entries supply the final list. This step is our practice.
Actual times or fixed slots
With actual times (the open interval of the UN guides), the person notes the time of each change of task. In auto-analyse continue, the start time of one task is also the end time of the previous one. The 2024 guide considers this form the most accurate in theory. Yet it burdens the person and makes precision vary: one person notes to the minute, another rounds to the quarter-hour. The instructions therefore set the precision expected.
With fixed slots, the form prints the hours of the day and the person marks the category of each slot. The person writes no time. The 2024 guide considers this form less burdensome. The length of the slot sets the level of detail expected. A long slot forces a choice between two tasks and makes short breaks disappear. The 2005 guide also notes that very brief activities are under-reported, for example a short phone call. For a diary filled in without an interviewer, the 2024 guide considers a short slot such as 15 minutes simpler. The rule for a shared slot is our choice: the person marks the task that takes up the largest share of the slot.
Running the study
- Write the question and the unit. "How many hours does each type of claim take?" calls for hours. "How many claim forms arrive by post?" calls for a count. The question also sets who keeps the record and for how long.
- Choose the categories with the team. An interview with the manager or a short workshop with the people who will keep the form supplies the list. Each category gets a one-line definition. A written rule says where a task that touches two categories goes.
- Choose the form. A count or a duration, a pre-printed list or free text, actual times or fixed slots.
- Write the instructions. A page of instructions, a completed day as an example and a checklist that the person goes through before handing in the form.
- Present the study and test the form. The analyst explains the purpose of the study and the use of the figures to the team. The 2005 guide describes this orientation interview before the diary is handed over. NN/g recommends a short pilot study to test the protocol, the tools and the documents. Two or three trial days show the missing category and the definition that two people read in two ways.
- Decide when people record. NN/g distinguishes entry at each event, at regular intervals and on a signal. Entry at each event suits events rare enough to note one by one. The regular interval suits events that are too frequent. The signal is a message sent at a fixed or random time. It suits people who forget to write things down.
- Read the forms during the study. The analyst comes by every day or every other day. They compare the day's total with the clocked hours and ask questions while the person still remembers. The 2005 guide adds that a follow-up interview may be needed after each day to clarify answers and fill gaps. The orientation interview and this follow-up make the collection more expensive.
- Total and check. Add up per category, per day and over the period. Before sizing, compare the totals with a second source: a few half-days of observation or the volumes that the system records.
The design choices come from the UN guides and from NN/g. So do the rules for supporting the people who record: the orientation interview, the pilot study, the follow-up interview and the choice of when to record. The order of the steps and their application to a team's work are our synthesis.
Special purpose records and check sheet
The check sheet also rests on a form kept at the workstation. It counts the occurrences of a problem by cause. Special purpose records measure work. The same form can serve either. The team's question decides. A count of complaints by reason is a check sheet when the team looks for the dominant cause. The same count becomes special purpose records when the team wants to know how many complaints one person handles per day. Only special purpose records measure durations.
Time recording for payroll or billing also notes durations per activity. It runs for as long as the person is employed and follows the accounting categories. Special purpose records last for one study and follow the categories of its question. When time recording exists, the analyst extracts it before starting a study.
Common mistakes
Filling in from memory. A form completed in the evening or on Friday contains estimates and loses the advantage of real time. For a person who forgets to write things down, NN/g recommends signal-based entry.
Extending the study. The 2005 guide observes that the consistency of entry can fall over the diary days. People who become aware of their activities can also change their routine. The 2024 guide considers a seven-day diary too heavy for a household survey. In our judgement, a work record is lighter: it covers working hours with a short list. A week shows the differences between days. When the work follows a monthly cycle, the study also covers the closing week.
Letting people overstate or understate their figures. The 2024 guide flags social desirability bias in self-administered questionnaires too: the person overestimates the time spent on well-regarded activities and underestimates the rest. At work, a person who fears for their job or hopes for extra staff has a stake in the figures coming out high or low. This work-specific risk is our reading: the guides deal with households. The analyst presents the purpose of the study before handing out the forms and publishes totals per category and per team. According to the 2005 guide, this bias remains very low in 24-hour diaries. The guide suggests possible causes: the neutral wording of the questions and the check that a full day imposes. The day's total plays this role in a work record.
Taking the totals for an exact measurement. Ampt and co-authors compared self-reporting and observation with nine registered nurses. Self-reporting yielded 667 data points over eight and a half weeks. Observation yielded 3243 over four and a half weeks. The nurses disliked self-reporting. Documentation took 19% of the time according to self-reporting and 8% according to observation. For patient care, self-reporting gave 33% and observation 40%. Breaks, medication and clinical discussions matched. The study covers one profession and records triggered at random times. It shows that the two methods can diverge. The analyst therefore compares the totals with a few half-days of observation before sizing the team.
AI considerations
A language model drafts a first category list and its definitions from the job descriptions and a sample of the team's emails. The team corrects the list during the workshop.
The model makes the free-text diary cheaper to process. It assigns each entry to a category on the list. The 2024 guide assigns this task to coders or to natural language processing software. The analyst reviews a sample of the classifications and every entry classified under Other.
The model does not replace entry at the moment of the task. A record rebuilt afterwards from the calendar gives durations that are plausible and wrong: the calendar contains the scheduled meetings and ignores the work done between them.
Free-text entries name policyholders, clients or colleagues. The analyst replaces the names before sending the entries to an external AI service.
Examples
A claims handler at a household contents insurer keeps a one-week record before her employer chooses an online claims tool. She fills in a quarter-hour sheet each day. The table converts the five daily sheets into hours. The last two rows show the clocked hours and the gap.
| Question | How many hours does each type of work take? | |||||
|---|---|---|---|---|---|---|
| Job | Claims handler in household contents insurance | |||||
| Period | Monday to Friday | |||||
| Unit | Hours recorded in quarter-hours | |||||
| Category | Mon | Tue | Wed | Thu | Fri | Total |
| Entering paper claim forms | 2.50 | 1.50 | 1.75 | 1.25 | 1.00 | 8.00 |
| Policyholder calls | 2.25 | 2.50 | 2.00 | 2.00 | 2.25 | 11.00 |
| Requests for documents | 1.00 | 1.25 | 1.50 | 1.00 | 1.25 | 6.00 |
| Calculation and settlement | 2.00 | 2.50 | 2.25 | 1.75 | 2.75 | 11.25 |
| Internal meetings | 0.50 | 0.00 | 1.00 | 0.50 | 0.50 | 2.50 |
| Other | 0.25 | 0.50 | 0.00 | 0.50 | 0.50 | 1.75 |
| Total recorded | 8.50 | 8.25 | 8.50 | 7.00 | 8.25 | 40.50 |
| Clocked hours | 8.50 | 8.25 | 8.50 | 8.00 | 8.25 | 41.50 |
| Gap | 0.00 | 0.00 | 0.00 | 1.00 | 0.00 | 1.00 |
The full-day check catches Thursday. The analyst asks on Friday morning: a one-hour training session on the new email system was missing from the list. The claims handler enters it under Other with its label. Without the clocked-hours row, the missing hour would have gone unnoticed.
Visualisations
The morning recorded in actual times and then in quarter-hours is drawn because the position of the tasks on the time axis carries the information. The 2024 guide describes the tempogram: for each slot of the day, it shows the share of people doing each activity. On a quarter-hour record, it shows at what time the team takes calls or enters claim forms. A bar chart gives the hours of each category. The Pareto chart ranks the categories from heaviest to lightest.
Cost
| Dimension | Level | Justification |
|---|---|---|
| Preparation | Medium | A category list to write with the team, instructions, a completed day as an example and a few trial days. |
| Execution | Medium | A few minutes per day and per person for one to two weeks. The analyst reads the forms every day or every other day. |
| Documentation | Low | The totals of a pre-printed list go into a spreadsheet quickly. Free text adds the coding of each entry. |
Tooling
One A4 sheet per day is enough for a quarter-hour record: an 8.5-hour day has 34 slots. The sheet stays on the desk and is filled in without switching screens.
A shared spreadsheet suits a team spread over several sites. One sheet per person and a totals tab avoid any copying out.
An online form (Microsoft Forms, Google Forms) time-stamps each entry. It suits entry at each event from a mobile phone.
A time-tracking app such as Toggl Track or Clockify records the start and end of each task in one click. It records actual times without the person writing them down. The team creates the study's categories in it and removes them at the end.
For signal-based entry, a reminder app on the mobile phone sends a notification at a fixed or random time. The 2024 guide describes this use of the phone: a time-tracking tool or a notification that reminds the person to fill in the diary.
Sources
- United Nations, Statistics Division, Guide to Producing Statistics on Time Use, Studies in Methods, Series F No. 127, 2024: the advantage of a diary kept in real time, the full diary and the light diary, the effects of a pre-printed list, actual times and fixed slots, slot length, the instructions for a diary filled in without an interviewer, manual or automatic coding of entries, social desirability bias, mobile phone notifications and the tempogram.
- United Nations, Statistics Division, Guide to Producing Statistics on Time Use: Measuring Paid and Unpaid Work, Studies in Methods, Series F No. 93, 2005: self-reporting (§ 273), the practical limit of about thirty activities (§ 219), the pre-printed list for categories chosen in advance (§ 222), the full-day check (§ 276), the under-reporting of very brief activities (§ 277), the orientation interview and the follow-up (§§ 294 and 298) and consistency over several days (§ 299).
- Office québécois de la langue française, Grand dictionnaire terminologique, "auto-analyse continue", after J. Tezenas (1971): the term and the definition of the variant that notes the start time of each task.
- A. Ampt, J. Westbrook, N. Creswick and N. Mallock, "A comparison of self-reported and observational work sampling techniques for measuring time in nursing tasks", Journal of Health Services Research & Policy, 12(1), 2007, pp. 18-24, doi:10.1258/135581907779497576: how nursing staff received self-reporting and the gap between self-reporting and observation.
- Nielsen Norman Group, "Diary Studies": the pilot study and the conditions for using entry at each event, at regular intervals or on a signal.

