Snaking the Drain
Snaking the Drain is a short team discussion that settles the fate of a familiar solution. Anderson's quick fix is the answer that has always worked and that a team falls back on under pressure. When this answer keeps coming back, it blocks new ideas. The team then talks it through one last time with as little emotion as possible. It asks what it likes about the solution, why the solution is not a good fit this time, what it will lead to and why it is time to bury it. The team then adopts the solution or rules it out. If it rules the solution out, it searches for other solutions. George W. Anderson describes the technique in Design Thinking for Tech (2023).
Goal
The technique helps the team decide: keep the quick fix or rule it out. In plumbing, to snake a drain means to push a drain snake through a blocked pipe. The snake is the flexible cable that clears the pipe.
Anderson observes that everyone falls back on what they know when a problem arises. A familiar answer is reassuring when pressure rises. A team that ignores it does not get rid of it: according to Anderson, the solution creeps back and keeps the team from thinking differently. So the team tests the quick fix against today's situation.
A team that writes its decision as one line on the whiteboard refers to that line when the solution returns.
Usage
When to use
- A solution that returns at every meeting: the team names it before it has described the problem.
- Brainstorming that starts from ready-made ideas: the book recommends the technique to a facilitator running a brainstorming session when the team arrives with its own solutions.
- Brainstorming that gets stuck: the book suggests the technique to restart the session.
- Change held back by habit: the book cites the technique as a way to revisit past mistakes and reduce resistance.
- Analysing a situation the team cannot change: the book recommends the technique to clear out old ideas that are no longer viable.
When not to use
- Several options to choose between: the technique judges a single solution; compare several with a decision matrix.
- Unknown cause of the problem: without facts about the situation, the second question draws only opinions; first find the cause with the Five Whys.
- A solution that returns after the discussion: the book points to Sacrificing the Calf, which declares the idea dead for this problem.
Description
The symptom
In a meeting, someone proposes the quick fix before the team has stated the problem. The team judges every new idea against the quick fix. The discussion returns to it after every detour. These signs do not come from the book.
The book's questions
- What do we like about the quick fix? The team names what the solution has delivered: its speed, its known cost and its past successes.
- Why is the quick fix not a good fit this time? The team tests the solution against the current situation.
- What will the quick fix lead to? The team describes what happens if it applies the quick fix once more.
- Why is it time to bury it at least for this particular situation? The team states why it drops the solution and how far that decision reaches.
The book asks the team to hold the discussion with as little emotion as possible. The team weighs the advantages and disadvantages of the quick fix one last time.
The two exits
According to the technique summary in Appendix B, the team can adopt the quick fix, which becomes the answer to the problem again. It can also rule the quick fix out and look for other solutions.
The book's questions assume that the team buries the solution. In our judgement, the team adopts the quick fix when no fact answers the second question. It also adopts it when the facts it gathered show that the solution still fits. The fourth question then goes unanswered. Adoption is a valid outcome of the discussion.
The book is unclear about which problems the solution stays ruled out for. The fourth question buries it "at least for this particular situation". The sentence after the questions rules it out "for the last time". Our reading rules it out for the problem at hand only: another problem can make the quick fix relevant again.
If the solution still comes back
If the solution comes back despite the discussion, Anderson points to Sacrificing the Calf, which he describes immediately afterwards. That technique declares a dead-end idea dead for this problem. The book recommends combining the two techniques.
The discussion format
| Element | In the book | Our proposal |
|---|---|---|
| Questions | The four questions about the quick fix | The facilitator writes them on the whiteboard before the discussion. |
| Tone | As little emotion as possible | The facilitator brings the discussion back to the facts of the current situation. |
| Outcome | Adopt or rule out the quick fix | The person who owns the problem decides. The team names that person before the discussion. |
| Facilitation | – | A person who did not propose the quick fix asks the questions and keeps time. |
| Participants | – | The team that is stuck on the problem. The person who defends the quick fix takes part. |
| Duration | – | 15 to 20 minutes at the start of the ideation session. |
| Record | – | One line on the whiteboard: the solution, the outcome, the scope and the reason. |
The traps
The traps that follow are our additions.
Skipping the first question. A team in a hurry to rule out the solution jumps straight to its flaws. The people who defend it do not feel heard. The solution returns at the next meeting. The first question lets them say what the solution has done for them.
Judging the author instead of the solution. The quick fix often has an author in the room. Criticism of the solution quickly turns into personal blame. The facilitator asks which fact each criticism rests on.
Discussing without deciding. Without a decision, the team replays the familiar arguments and leaves the solution in place. The facilitator asks for the decision before closing the discussion.
Burying the solution for good. A team that bans a solution from every future discussion loses an option. The facilitator writes the scope on the decision line: "ruled out for this problem". A team facing another problem can then reconsider the quick fix.
AI considerations
Before the meeting, a language model summarises what the minutes say about the quick fix: when the team applied it, what it cost and what followed. These facts feed the second and third questions. The facilitator checks each fact in the source document because a model can invent a date or an amount.
During the discussion, a model can argue for the quick fix on request. The team hears the strongest arguments without a colleague having to make them. The decision stays with the team: the team bears its consequences.
After the decision, the team looks for its own ideas before it asks a model. A model first proposes the most common answers to a problem. The quick fix is often among them.
Incident reports and tickets often name customers or staff. Their names are personal data under the Federal Act on Data Protection (FADP). The facilitator removes them before handing the documents to an external AI service.
Examples
In this invented example, a municipality's room booking portal slows down every Monday morning. The IT team always comes back to the same solution: more server capacity. It records its answers to the four questions and its decision.
| Question | The team's answer |
|---|---|
| What do we like about the quick fix? | The hosting provider applies it in one day. No line of code changes. The solution fixed the slowdowns of 2022 and 2024. |
| Why is it not a good fit this time? | On Monday mornings the processor stays below 35% load. The search for free rooms then takes 8 seconds. It took 1 second before the January import of the sports halls. |
| What will it lead to? | CHF 450 more per month. The search still takes 8 seconds. |
| Why bury it at least for this particular situation? | The slowness comes from the search for free rooms. Server capacity makes no difference to it. |
| Decision | Ruled out for this problem. Ideation focuses on the search for free rooms. |
The second answer carries the decision. A measurement contradicts the diagnosis that the quick fix assumes. Without it, the discussion sets one opinion against another.
Visualisations
A diagram shows the sequence: the quick fix that returns, the four questions, then the two exits. If the solution returns after the team has ruled it out, an arrow leads to Sacrificing the Calf. A table separates the book's specifications from our additions. The example shows the recorded decision.
Cost
| Dimension | Level | Rationale |
|---|---|---|
| Preparation | Low | Name the quick fix and gather a few facts about the current situation. |
| Execution | Low | 15 to 20 minutes by our estimate. The book calls it light. |
| Documentation | Low | One line on the whiteboard if the team records the decision. |
Tooling
A whiteboard or a flipchart is enough to write the questions and the decision. A remote team can use a shared document or a virtual whiteboard such as Miro or Mural for the same job. The team copies the decision into its wiki.
Sources
- George W. Anderson, Design Thinking for Tech: Solving Problems and Realizing Value in 24 Hours, Addison-Wesley, 2023, ISBN 978-0-13-793303-7. Hour 10 "Introduction to Thinking Differently", section "Design Thinking in Action: Snaking the Drain to Work Through Clogs", p. 144: the symptom, the four questions, the tone and the pointer to Sacrificing the Calf. Same hour, section "Design Thinking in Action: Sacrificing the Calf to Kill Dead-End Ideas", pp. 145-146: the combined use of the two techniques. Hour 13 "Exercises for Reducing Uncertainty", section "Design Thinking in Action: Backporting into the Past", p. 189: the technique for clearing out old ideas that are no longer viable in a situation the team cannot change. Hour 14 "Thinking for Problem Solving", section "Design Thinking in Action: Brainstorming", p. 205: the technique for a facilitator running a brainstorming session when the team arrives with its own solutions. Hour 23 "Making Change Sticky", section "Methods for Creating Awareness", p. 328: the technique for revisiting past mistakes and reducing resistance. Appendix A, Hour 14, answer 3, p. 365: restarting a stalled brainstorming session. Appendix B, p. 383: the technique as a light discussion and its two exits.
The facilitation, the duration, the written record and the traps are our additions.

