SMART Objectives
A SMART objective is a written objective that passes a five-criterion test. George T. Doran published the acronym in 1981 in Management Review. The objective is specific, measurable, assignable to a person, realistic given the resources and time-related. In practice, the analyst checks the sentence one criterion at a time and rewrites it until it meets all five. Today the BABOK and the PMBOK read the A as achievable. For the R, the BABOK reads relevant and the PMBOK keeps realistic. The test checks the wording and leaves the choice of objective open.
Purpose
A SMART objective is a written objective that targets a specific area, carries an indicator, names who will do it, stays realistic given the resources and sets a deadline. The test turns an intention ("improve the service") into a sentence that a third party can check when the deadline comes.
Doran separates the goal from the objective. A goal states a long-term belief of senior management. His example: "Conduct all corporate activities with honesty, integrity, and fairness". The objective quantifies that goal. Doran cites an inventory system to be in service by 31 December. The system must cut inventory costs by 1 million dollars. Its cost must not exceed 200 work hours and 15'000 dollars of initial expenditure. SMART applies to the objective only. Doran draws this distinction only at management level. Elsewhere, the word matters less than agreement on what it means.
The deliverable is the rewritten sentence. It names the area, the indicator and its target, the owner, the resource limit and the deadline. A log of the letters that failed can go with it. Doran treats the objective and its action plan as twins: management tracks the two together.
Usage
When to use it
- Objectives in a project charter or a business case: rewrite each objective before the sponsor signs.
- Business objectives of the future state: make each objective verifiable before estimating the value of the solution.
- An objective received with a vague verb: "improve", "optimise" or "strengthen" with no figure and no date call for a rewrite.
- A department's annual objectives: rewrite the objectives of the company, the department and the section.
- Project tracking metrics: test each metric against the criteria the PMBOK applies to them.
- A portfolio of objectives awaiting prioritisation: find those with no owner or no deadline before comparing them.
When not to use it
- Objectives still to be chosen or aligned across levels: SMART tests a sentence already chosen; set and align objectives with OKRs.
- A requirement or a deliverable to verify: write acceptance criteria.
Description
Doran's criteria
- Specific: the objective targets a specific area for improvement.
- Measurable: it quantifies the result or at least suggests an indicator of progress.
- Assignable: it says who will do it.
- Realistic: it states the result that the available resources can achieve.
- Time-related: it says when the result will be achieved.
The M presupposes data. A target with no baseline and no source puts a number on a guess. If no system records the indicator, the team starts by recording it.
The A asks for a name or a role. An organisation where nobody will answer to management for an objective finds out at this letter. Doran's own example names nobody. One of Doran's caveats accepts an objective that drops a letter.
The R is checked against written resources: a budget line, a workload plan, the department's headcount.
The variants of the letters
The M and the T keep their meaning. Doran's S targets an area. The BABOK's S targets an observable result. The A and the R change meaning with the source.
| Letter | Doran (1981) | BABOK v3 | PMBOK, 8th ed. | Whitmore |
|---|---|---|---|---|
| S | Specific | Specific | specific | Specific |
| M | Measurable | Measurable | measurable | Measurable |
| A | Assignable | Achievable | achievable | Agreed |
| R | Realistic | Relevant | realistic | Realistic |
| T | Time-related | Time-bounded | time-bound | Time phased |
The BABOK and the PMBOK replace Assignable with Achievable. None of their letters still asks who delivers the objective. The BABOK moves the R towards alignment: the objective fits the enterprise's vision, mission and goals. In the PMBOK, achievable and realistic both ask about feasibility.
Checking the criteria one at a time
Doran publishes a list and no procedure. In practice, the analyst and the intended owner check each criterion against the written sentence. Half an hour is enough for an objective whose data exist.
- Record the initial objective. The sponsor or the team states it in their own words. The analyst writes it down as given and keeps the vague verb.
- Choose the variant. The team writes the five words it adopts at the top of the template. It can also ask the questions that this variant has lost: who owns the objective and what it is for.
- Check each criterion. S: which area, which observable result? M: which indicator, which baseline, which target, which source? A: who will do it? R: do the available resources allow this result? T: by what date?
- Rewrite the failing part. The analyst corrects that fragment only.
- Recheck the criteria already passed. A target relaxed for the R changes the M. A deadline brought forward for the T changes the R.
- Stop when all five letters pass. If a letter still fails, the team writes down which letter it drops and why.
- Attach the action plan. The steps, the means and the milestones that lead to the target go with the objective.
The PURE and CLEAR companions
In the Goal step of the GROW model, John Whitmore pairs SMART with two other acronyms: PURE and CLEAR. They put questions to the objective that SMART does not ask: is it understood, ethical, legal, stretching enough?
| Acronym | Letters |
|---|---|
| PURE | Positively stated, Understood, Relevant, Ethical |
| CLEAR | Challenging, Legal, Environmentally sound, Appropriate, Recorded |
Adam Kreek publishes a different CLEAR (Collaborative, Limited, Emotional, Appreciable, Refinable) and proposes it in place of SMART.
SMART, OKRs and acceptance criteria
Objectives and key results (OKRs) pair each qualitative objective with three to five numeric key results for one cycle. Teams align their OKRs from one level to the next. SMART tests the sentence once the objective is chosen. On an OKR, it tests the objective and its key results together.
Acceptance criteria apply the same test to a requirement: a verifiable condition that ends in a pass or a fail. The RAVE criteria (Relevant, Adequate, Valid, Easy) apply it to a measure before the measure becomes an indicator. They keep only a measure that is relevant, able to detect a change, valid over time and easy to collect.
Pitfalls
Taking the list for a standard. Doran presents his criteria as a guideline. He writes that an objective will not always meet all five. The closer it comes, the better it is. A team that rejects every incomplete objective applies a rule the author never set.
Quantifying at any cost. Doran states that the criteria do not require every objective to be quantified at every level. In a staff function, a team that forces a figure can lose the benefit of a more abstract objective. An indicator of progress is then enough for the M.
Mixing the variants. A reviewer trained on the PMBOK reads the A as a question of feasibility. A colleague trained on Doran looks for a name there. Both pass the same sentence for different reasons.
Applying everything at once. Bjerke and Renger call a uniform application of the criteria misleading. In the case they describe, the team applies the criteria in stages. In practice, when the baseline does not exist yet, the team sets the S, the A and the T, records the indicator, then sets the M target.
Confusing a well-written sentence with a good objective. Fred Nickols notes that SMART says how to write an objective and nothing about where it comes from. A sentence can pass all five letters and aim at the wrong result.
Aiming low. Donald and Charles Sull criticise SMART for undervaluing ambition and for ignoring the review of objectives during the year. An ambitious objective belongs in an aspirational OKR.
AI considerations
A language model puts a list of objectives through the five questions in seconds. It spots the vague verb and the objective without an owner, a deadline or a baseline. It proposes a rewrite per letter that the team corrects. On a portfolio of forty objectives, it lists the failing letters for each objective.
The model knows neither the baseline nor the resources. A figure it proposes for the M is plausible and invented. The R depends on the headcount, the budget and the team's other work: the owner judges it. The A asks who owns the objective. The model can guess a role. Only the sponsor appoints the owner.
A business case holds strategic figures and budgets. The analyst submits it only to an AI service that the organisation has approved. Otherwise, the analyst replaces the amounts, targets and names with placeholders before sending the objective sentences.
Examples
The artefact is the rewrite log of an objective that the benefits department of a health insurer received. The team uses Doran's variant.
| Letter | Question | Finding on the sentence | Rewrite |
|---|---|---|---|
| Initial objective: "Speed up the reimbursement of our policyholders' invoices." | |||
| S | Which area? | "Reimbursement" covers tiers payant and tiers garant invoices on paper and in electronic form. | the time between receipt of a paper invoice under tiers garant and payment to the insured person |
| M | Which indicator, which baseline? | No figure. The benefits management system gives a median of 14 working days. The sponsor aims for 3 days. | cut the median of this time from 14 to 3 working days |
| A | Who will do it? | No owner. | under the responsibility of the head of the benefits centre |
| R | Do the resources allow it? | Headcount stays the same. Digitisation budget of CHF 120'000. Invoice checking takes 5 working days and stays outside the digitisation. Digitisation brings capture and payment down to 2 working days. | target relaxed to 7 working days with no extra headcount and within a budget of CHF 120'000 |
| T | By what date? | No deadline. | by 30 June 2027 |
| M rechecked | The target changed: does the indicator hold? | The benefits management system still records the monthly median. | none |
| Rewritten objective: "By 30 June 2027, with no extra headcount and within a digitisation budget of CHF 120'000, cut from 14 to 7 working days the median time between receipt of a paper invoice under tiers garant and payment to the insured person. Owner: the head of the benefits centre. Measure: monthly median from the benefits management system." | |||
With the A of the BABOK or the PMBOK, the A row would ask whether the objective is achievable. No row would ask who delivers it. The objective would have no owner.
Visualisations
In the criterion-by-criterion rewrite, the arrow from R back to M is the only step backwards. A changed fragment forces a recheck of the criteria it touches. In the log, the Finding column carries the data that justifies each rewrite.
Cost
| Dimension | Level | Justification |
|---|---|---|
| Preparation | Low | One sentence to collect and one variant to choose. |
| Execution | Medium | The five questions take half an hour. The M baseline can take days when no system records the indicator. |
| Documentation | Low | The rewritten sentence goes into the charter or the business case. The log fits on one page. |
Tooling
The charter or business case template is enough for a few objectives. One line per letter under each objective shows the test to the sponsor who signs.
A spreadsheet suits a portfolio of objectives. With one column per letter, the analyst filters for the objectives with no owner or no deadline before prioritising the portfolio.
The source system supplies the M baseline: the ERP, the ticketing tool, the data warehouse or the business application.
OKR tools and the objective modules of work-management suites carry fields for the owner, the target and the deadline. They make an empty field visible. They do not judge the R.
Sources
- George T. Doran, "There's a S.M.A.R.T. Way to Write Management's Goals and Objectives", Management Review, vol. 70, no. 11, November 1981, pp. 35-36: the original acronym, the definition of the five letters, the distinction between goal and objective, the inventory system example, the author's two caveats and the action plan attached to the objective.
- IIBA, A Guide to the Business Analysis Body of Knowledge (BABOK Guide) v3, §6.2.4.1 Business Goals and Objectives: SMART as a common test for business objectives and the reading of A as achievable and of R as relevant.
- PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 8th ed., §2.1.5.3 SMART Criteria and §2.1.6.7: the five criteria in the governance performance domain and their application to project metrics.
- John Whitmore, Coaching for Performance, Nicholas Brealey Publishing: SMART, PURE and CLEAR in the Goal step of the GROW model.
- Adam Kreek, "CLEAR Strategic Planning – and Why SMART Goals Fail" and The Responsibility Ethic, Page Two: the other CLEAR acronym that Kreek proposes in place of SMART.
- Fred Nickols, "S.M.A.R.T. Ain't Enough", 2017: Doran's original words and the test's silence on where objectives come from.
- Bjerke and Renger, "Being smart about writing SMART objectives", Evaluation and Program Planning, 2017: the critique of uniform application and the application of the criteria in stages.
- Swann et al., "The (over)use of SMART goals for physical activity promotion", Health Psychology Review, 2022: the critique of SMART applied to physical activity goals.
- Donald Sull and Charles Sull, "With Goals, FAST Beats SMART", MIT Sloan Management Review, 2018: the undervalued ambition and the review of objectives during the year.