Simple Ethnography
Simple Ethnography is one of the Liberating Structures. The members of a group go out alone or in pairs to observe people who face the problem that the group must solve. They note what they see without speaking. They then question some of these people about the behaviours they selected. The group compares its notes with 1-2-4-All, draws patterns and exceptional solutions from them, then feeds them into prototyping. Henri Lipmanowicz and Keith McCandless describe the structure in The Surprising Power of Liberating Structures (2013). The book allows 75 minutes to 7 hours per round.
Goal
Simple Ethnography helps a group find ways of working that already solve a problem in whole or in part. The group looks for them among the people who face the problem. It observes these people where they work or use the service: a workstation, a client organisation, a neighbourhood. The people observed are colleagues in the field or users of the product or service.
According to the book, the structure brings to light new solutions, underlying needs and routines that nobody notices any more. It reaches the tacit and latent knowledge that asking users for their explicit needs leaves hidden. The book gives the focus group as an example of this method. By observing and questioning the people in the field, the group shows them respect and trust. The authors' site links the structure to the principle "Practice Deep Respect for People and Local Solutions".
A round delivers pages of field notes and the patterns and exceptional solutions from the debrief. It also delivers stories that show needs and opportunities for action. Its last product is the idea that the group feeds into prototyping. Each page of notes separates facts from interpretations. In our view, the business analyst keeps these notes after the round. They record the workarounds and describe the work as people do it. The analyst cites them as evidence when a requirement departs from the documented process.
Observation sends an analyst to watch an activity and elicit requirements. In Simple Ethnography, the whole group in charge of the problem observes the behaviours that solve it in another way. It then prototypes solutions drawn from these behaviours.
You will find the other structures of the repertoire under Liberating Structures.
Usage
When to use it
- Some colleagues outperform others with the same resources: the book cites sales representatives who get better results.
- A repeated instruction that people do not follow: the book cites patients who leave their isolation room despite the warnings.
- Stated needs that fall short: observation reaches what people leave unsaid in a focus group or a questionnaire.
- Before prototyping: the observations supply the scenes for Improv Prototyping or the panels for Design StoryBoards.
- Redesign by a whole team: in our view, the people who will write the target process see the workarounds of the current process for themselves.
- An organisation's culture that the group must understand: the book reports a research team that used the structure to study habits, espoused values and beliefs.
- A newly implemented practice: the book advises one or more rounds after implementation.
- Distributed team: the site suggests starting online, observing in the field and debriefing online.
When not to use it
- A single analyst can go on site: the structure sends the whole group into the field. Run an observation and share the notes.
- Invisible work or access refused: nobody can watch an expert's reasoning or observe a closed site. Question the expert in an interview. For a closed site, use document analysis.
- Measurement or a representative sample required: a few hours on a few sites yield no reliable frequencies or times. Measure through passive observation or a survey.
Description
The invitation
According to the book, the facilitator invites the participants to silently observe people with experience of the problem, then to question them to understand it better. The site invites the group to immerse itself with the people closest to the problem and learn from their direct experience.
The field, the materials and the observers
The book sets the structure in a local setting: a workplace, a client organisation, a neighbourhood. The group then shares its notes, photos and videos in a room. Each observer takes a notebook and a still or video camera. The site also accepts virtual observation sites.
All the members of the group who work on the problem become ethnographers with the same opportunity to contribute. They spread out alone or in pairs across the observed sites. The whole group then meets for the debrief. The site sets a minimum of two participants and names a host role. Online, a technical host assists the host.
The sequence according to the book
- The facilitator explains the problem to solve and what the group understands of it today (5 min).
- The group chooses the sites and the people to observe. These people will show the users' experience in depth (5 min).
- The participants go to the sites. They observe the exchanges and the activities without speaking. They note the details and their reflections as the visit goes on (10 to 180 min).
- Each participant selects the observed behaviours that solve all or part of the problem in a new way. The participant asks the people observed what they were feeling and what they were doing at that moment (20 to 180 min).
- The group meets and compares notes with 1-2-4-All. It looks for patterns and exceptional solutions (15 min).
- The participants write up their observations or draw stories from them that show needs and opportunities for action (10 to 20 min).
- The group feeds the patterns, the exceptional solutions and the stories into brainstorming and prototyping (10 min).
- The group repeats the steps until its members judge that they hold a new idea strong enough for a prototype.
The book's timings add up to 75 minutes to 6 hours 55 minutes for a round. The book rounds this maximum to 7 hours in the structure's subtitle. The field work of steps 3 and 4 takes 30 minutes to 6 hours. The steps in the room last 45 to 55 minutes.
The sequence according to the site
The authors' site keeps the field work and the debrief but drops the interview step. It adds a step in which each person posts their artefacts in a shared space. The participants debrief in small groups with 1-2-4-All, then in plenary with What, So What, Now What? The final sharing names possible next steps: interviews, action research or small experiments.
| Element | Book (2013) | Authors' site |
|---|---|---|
| Stated duration | 75 min to 7 h | About 50 min to 7 h |
| Introduction | 5 min: the problem and what the group understands of it | 5 min: the invitation, the shared problem and its context |
| Preparation | 5 min: the sites and the people to observe | 5 min: the sites and the people, the permissions, the ladder of inference and What, So What, Now What? |
| Field work | 10 to 180 min of silent observation | 10 to 180 min of observation with notes and artefacts |
| Interviews | 20 to 180 min with the people observed | No step. A possible next step after the final sharing |
| Sharing the artefacts | No step | 5 to 10 min in a shared space |
| Debrief | 15 min with 1-2-4-All | 15 min in small groups (the site names 1-2-4-All), then 10 to 15 min in plenary with What, So What, Now What? |
| Writing and next steps | 10 to 20 min of writing, then 10 min to feed into prototyping | The next steps named in plenary |
| Repetition | Until the group holds a new idea strong enough for a prototype | 40 to 60 min per cycle, until ideas emerge that lead to a prototype |
| Group size and roles | The whole group, alone or in pairs | At least 2 participants. A host. A technical host for online sessions |
| Precautions | Permission to observe if needed | Permission, safety and confidentiality without disrupting the work. Online, announce your presence, then turn off camera and microphone |
The site's steps add up to 50 minutes to 3 hours 50 minutes for a round. Each repeated cycle adds 40 to 60 minutes. In our view, the facilitator follows the book's sequence and keeps the interview: observation shows a behaviour, the interview explains it. From the site the facilitator borrows the observation grid, the review of the ladder of inference and the precautions.
Choosing the sites and the people
The site advises going where conditions are tough: problems there are extreme, solutions seem impossible and people get inventive. The book asks observers to look at what is irregular, intimate and unpretentious. It asks them to keep what is imperfect, crude or impermanent: "deviance can be positive".
The book asks observers to judge an object by the use people make of it, whatever its cost or technology. In our view, the observer gives the counter clerk's notebook the same weight as the application screen. A list kept by hand or a note stuck on the screen signals a flaw in the official system and shows how someone worked around it.
Observing without interpreting
The book's first tip warns against giving the observations meaning too early. The site has the group review the ladder of inference before the visit. The observer must "stay low on the ladder": they note facts and observable data only. The site forbids interpreting and fixing on the spot. You will find the ladder of inference under What, So What, Now What?
In our view, the notebook splits into two columns what the observer sees and what they make of it. The observer keeps "seems", "too" and "because" for the interpretation column. At the debrief, the group then compares facts before interpretations.
According to the book, insight comes from inconspicuous details that people often overlook. The site provides a grid that breaks the observation down into dimensions: setting, activities, communication, sound and pacing. For each dimension, a second set of questions asks how it might contribute to the problem. The site calls these answers preliminary interpretations.
Questioning after observing
The observer waits until the observation is over to question the person: the site asks observers to leave the work undisturbed. The observer names the moment observed, then asks the book's two questions: what the person was feeling and what they were doing. In our view, a question about a precise gesture gets a story. A question about needs in general gets the official version of the work. At a health insurer's call centre, for example, an observer asks: "You wrote this case on your list before you took the next call. What led you to do that?"
In Michael Gardam's study of five Canadian hospitals, the team interviewed cleaning staff as well as vice-presidents in the Appreciative Interviews format. Each person told of a success in preventing infections and what had made it possible.
Debriefing and writing the stories
Back in the room, the group runs 1-2-4-All. Each person rereads their notes alone, then compares them in pairs, then in fours. The whole group then pools the patterns and exceptional solutions.
For the stories, the book suggests a storytelling template such as the hero's journey. The site describes this template: a protagonist leaves their ordinary world, faces trials in an unfamiliar context and returns transformed with a reward or an insight. In our view, the analyst asks of each story which need it shows and who has that need.
Permission and confidentiality
The book mentions permission only where needed. The site asks observers to obtain permission to observe. It asks them to protect people's safety and confidentiality without disrupting their work. Online, the observer announces their presence, then turns off camera and microphone. In our view, the observer photographs objects and workstations. They photograph a person only with that person's consent. You will find the Swiss rules on observing employees under Observation.
What makes Simple Ethnography fail
The observer interprets on the spot. An observer who writes "inefficient process" has already reached a conclusion. Colleagues can no longer compare their facts with that observer's.
The group delegates the field work to a single analyst. The others read a report and lose the direct experience that the structure gives them.
The group stops after one round. The book has the group repeat the round until it holds a new idea strong enough for a prototype.
The person observed changes their work because they know they are being watched. In our view, the observer introduces themselves and takes no notes during the first exchanges. They then note what changes when they move away.
The group mistakes its notes for research findings. The patterns it finds remain hypotheses to prototype.
Simple Ethnography and research ethnography
Hubert Knoblauch describes a form of ethnography found mainly in applied research and calls it focused ethnography. It rests on short field visits and dense data collection. He considers it complementary to conventional ethnography. Simple Ethnography resembles it in its short visits.
Variations
According to the book, participants can draw or build a model of the problem. The book states that these nonverbal methods bring deeper ideas to light. The site strings the structure with Drawing Together to the same end. The book suggests involving clients in the observation: they record their own behaviours in photos or video and share them with the group.
Simple Ethnography in strings
| Source | String | Purpose |
|---|---|---|
| Book (chapter 6) | User Experience Fishbowl, then Simple Ethnography, then Improv Prototyping | The Fishbowl shows the limits of what the group knows. These limits guide the observations. The observations provide the scenarios for the scenes. |
| Book (chapter 6) | Simple Ethnography, then What, So What, Now What?, then Design StoryBoards | The observations point to opportunities for prototyping. What, So What, Now What? reviews them. Design StoryBoards plans the field tests. |
| Book (chapter 3) | Discovery & Action Dialogue, Simple Ethnography, Appreciative Interviews and TRIZ | Involve frontline staff and customers in improving customer service |
| Book (Min Specs) | Simple Ethnography or Nine Whys, then Min Specs | Bring tacit minimum rules to the surface. Adapt them to the field observations. |
| Book (Design StoryBoards) | Simple Ethnography within a Design StoryBoard | Describe the users' current experience |
| Site | Simple Ethnography with Drawing Together | Build a visual model of the problem |
AI considerations
The notes describe recognisable people. In the field, the observer therefore records each person by role ("agent A") and leaves out the details that identify a person. The notes stay anonymous when they go to an external AI service. At a health insurer's call centre or in a hospital, the notes contain health data. These are sensitive personal data under the Federal Act on Data Protection (art. 5 let. c FADP).
After the visit, a language model transcribes the photographed handwritten notes. It flags the words in the fact column that interpret: "seems", "slow" and "because". The observer rewrites these lines or moves them to the interpretation column.
The group looks for the patterns itself with 1-2-4-All. Each person sets what they saw against what the others saw. After the session, the model rereads all the notes and proposes patterns that the group missed. The group checks each one against the notes.
The model helps write the stories. The observer gives it their facts and the chosen storytelling template, then corrects the draft. A story that the model completes beyond the facts describes a field that nobody saw.
The group observes for itself. According to the book, the observers' presence shows respect for the people in the field. In our view, a recording analysed by software removes this presence and brings the exercise closer to staff surveillance. In Switzerland, art. 26 of Ordinance 3 to the Employment Act (OLT 3) prohibits systems designed to monitor the behaviour of workers at their workstation.
The authors say nothing about AI. These uses rest on practitioner judgement.
Examples
The field deliverable is the page of notes that separates facts from interpretations. In this constructed case, the call centre of a health insurer in French-speaking Switzerland wants fewer repeat calls from insured persons about the same request. An observer spends one hour beside an agent whose callers rarely call back. She sorts her notes by the dimensions of the site's grid.
| Dimension | Observed fact | Provisional interpretation |
|---|---|---|
| Setting | A handwritten list of open cases is stuck under the screen. It has 14 lines. Nine are ticked. | She tracks her cases outside the application. |
| Activities | 09:12. She reads the reimbursement decision to the caller word for word before answering. | She avoids rephrasing a decision that she did not take. |
| Communication | 09:20. She ends the call with: "You will receive the letter by Thursday. If you have heard nothing by Friday, call me on my direct line." | The caller knows when to call back and whom to call. |
| Sound | From her chair, the observer hears the calls at the next workstation. The agent wears a closed-back headset. | The noise on the floor makes listening harder. |
| Pacing | 6 calls in 60 minutes. She takes about 40 seconds to write each case on the list before taking the next call. | She loses time between two calls to save time on callbacks. |
Another observer can check each fact. The interpretations wait for the debrief. The book asks observers to keep what is imperfect and impermanent. The observer therefore keeps the handwritten list for the interview.
Visualisations
A diagram shows a round according to the book: the steps in the room, the field work by one or two people, the timings and the repetition loop. Tables compare the book with the site, list the strings and show a page of field notes.
Cost
| Phase | Level | Justification |
|---|---|---|
| Preparation | Medium | Define the problem. Choose the sites and the people to observe. Obtain the permissions. Print the observation grid. |
| Execution | High | By the book's timings, each member of the group spends 75 minutes to 7 hours per round. The book has the group repeat the round until it holds a new idea strong enough for a prototype. |
| Documentation | Medium | Write up the observations and the stories: 10 to 20 minutes according to the book. Remove from the notes and photos whatever identifies a person. |
Tooling
In the field, each observer carries a notebook, a pen and a printed copy of the site's observation grid. The observer photographs workstations and objects with a mobile phone. They photograph a person only with that person's consent. Back in the room, flipcharts and sticky notes support the 1-2-4-All debrief.
A shared folder receives the photos and the scanned notes. Online, Zoom or Microsoft Teams open the breakout rooms for the debrief. A spreadsheet or a shared document gathers the stories and the patterns that the group keeps.
Sources
Henri Lipmanowicz and Keith McCandless developed Simple Ethnography. According to the book, Chris McCarthy and the ethnographers of the Innovation Learning Network inspired the structure. The book presents McCarthy as an innovation consultant at Kaiser Permanente.
- Henri Lipmanowicz, Keith McCandless, The Surprising Power of Liberating Structures: Simple Rules to Unleash a Culture of Innovation, 2013, ISBN 978-0-615-89337-2: the description of Simple Ethnography with its invitation, its steps, its purposes, its tips, its variations, its examples and its attribution; the strings in chapters 3 and 6; Michael Gardam's account; the mentions in Min Specs and Design StoryBoards.
- Simple Ethnography, Liberating Structures: the site's version with its timings, its observation grid, its roles, its precautions, online facilitation and the string with Drawing Together.
- Hubert Knoblauch, "Focused Ethnography", Forum Qualitative Sozialforschung / Forum: Qualitative Social Research 6(3), 2005: focused ethnography and its short field visits.

