Your Training Partner
Techniques Toolbox
Invented example on a conversation timeline. The analyst asks why the interface delivery slipped. The application owner answers: "Testing took longer than planned." A band marked "Silence" follows: the analyst stays quiet and watches. Above the band are the signs Anderson names: raised eyebrows, folded arms, an eye roll and a head shake. Only the folded arms are marked as observed. The application owner goes on: accounting never approved how services are charged to cost centres. An arrow leads to the next move the analyst chooses: "How is the approval going with accounting?"

Silence by Design

Silence by Design is a listening technique built on deliberate silence. When the interviewee stops talking, the analyst stays quiet and waits for them to resume of their own accord. During the pause, the analyst watches the person's body language. According to Anderson, the person fills the silence with their own insights and what is on their mind. The analyst then chooses where to take the conversation. George W. Anderson describes the technique in Design Thinking for Tech (2023).

Purpose

Silence by Design helps the analyst learn what a person thinks and feels beyond their first answer. Anderson defines it as a method for gaining understanding without filling the pauses in a conversation. He groups it with active listening, Supervillain Monologuing and Probing for Better Understanding among the listening techniques of chapter 6 (Hour 6). That chapter is about understanding the lay of the land before solving a problem.

The technique corrects an interviewer's reflex. When the person stops talking, an interviewer in a hurry asks again, rephrases or suggests an answer. The person then answers the interviewer's words and drops their own thread. Anderson names this reflex in his section on Probing: answering one's own question or leading the person down a path of one's own making.

The analyst uses the technique to choose where to take the conversation after the pause. Anderson bases this choice on the non-verbal signs observed during the silence. The analyst also weighs what the person says on resuming. Once the conversation is over, the analyst writes down what the person said after each pause. The analyst can use these statements as verbatims: Anderson counts Silence by Design sessions among the sources for Verbatim Mapping.

Usage

When to use it

  • Short or stock answer: the pause makes room for what the question did not draw out.
  • Open question that needs thought: the person takes time to answer without anyone putting words in their mouth.
  • Tense conversation: the pause lets the person put their grievance into their own words.
  • One-to-one interview already planned: the technique fits into it with no preparation of its own.
  • Remote team: the pause works on a video call; observation is often limited to the face and head.

When not to use it

  • Group session: the analyst cannot watch everyone and the most confident voice fills the silence; let each person think alone with 1-2-4-All.
  • Question about a number or a date: a pause adds nothing to a recorded fact; find it in the documents with document analysis.

Description

Silence and observation

The technique combines two actions in the same pause: staying quiet and watching. Anderson accepts the discomfort: he speaks of awkward silences and healthy discomforts. In his view, the person ends up filling the silence with their own insights and what is on their mind.

During this silence the analyst is not searching for words and can watch the person. Anderson gives these examples: raised eyebrows, folded arms, an eye roll and an exasperated head shake. He does not say what each of these signs means.

Analyst
Application owner
AnalystWhy did the interface delivery slip?
Application ownerTesting took longer than planned.
Signs Anderson names
Raised eyebrows
Folded armsobserved
Eye roll
Head shake
SilenceThe analyst stays quiet and watches.
Application ownerActually, accounting never approved how services are charged to cost centres. Until they do, testing can't finish.
Next moveHow is the approval going with accounting?
Invented example. After a short answer, the analyst stays quiet and watches. The application owner resumes with their own view of what caused the delay. The analyst chooses the next move from what they heard and saw.

The steps

The order and the numbering are our reading. Steps 1 and 5 apply the listening guidance Anderson gives for the whole chapter.

  1. Prepare. The analyst knows what information they are looking for and who holds it. They put their phone away and close their laptop. Anderson asks the analyst to listen from the top of the organisation to the bottom and out to the people at the edge of the project.
  2. Ask an open question. The analyst asks an open question or lets the person carry on with their story. Anderson assumes that a conversation is already under way.
  3. Stay quiet and watch until the person resumes. When the person stops, the analyst lets the pause run. The analyst does not prompt and does not rephrase. During the pause, the analyst watches the face, the head and the arms. They remember each sign and what was being discussed when it appeared. They do not interpret it yet. The pause ends when the person resumes or hands the floor back by looking at the analyst or saying "that's it".
  4. Choose the next move. Anderson bases the choice of next move on the non-verbal signs observed during the silence. The analyst also weighs what the person said on resuming. The analyst follows up on what the person has just said, returns to the topic that triggered a sign or moves on to the next question.
  5. Take notes after the conversation. For each pause, the analyst notes the sentence before it, the sign observed, the person's words after it and the next move. The analyst records the words after the pause word for word. The analyst keeps the sign apart from any interpretation. The exact words come from the transcript or from a second analyst's notes. A transcript requires the person's consent to the recording. With neither, the analyst writes the words down from memory and marks them as such. Such a note does not count as a verbatim.

When the pause ends

Anderson does not say what to do if the person does not resume. In our practice, the pause ends when the person hands the floor back: they look at the analyst, say "that's it" or ask whether the analyst expects anything more. The analyst then moves on. If the analyst stretches the silence after this signal, the interview turns into a standoff.

Where it fits in the interview

Silence by Design fits into an interview after an answer or an open question. The interview guide, consent and recording belong to the interview itself.

Pitfalls

The filled pause. The analyst says "hm", suggests a word or answers their own question.

The gesture read as an admission. Folded arms can mean disagreement, feeling cold or habit. The analyst notes the sign and the topic. They then check it with an open question on that topic. They never write down "the person is opposed" on the strength of a gesture.

Silence that turns into pressure. When the person fears for their job or sees the analyst as sent by management, a long pause can feel like an interrogation. At the start of the interview the analyst says that they will sometimes leave time to think.

The second-language pause. In Switzerland an interview is often held in the second language of one of the two people. A pause may then mean that the person is looking for a word. The analyst gives them time to find it. The analyst does not read this pause as doubt about the matter itself.

Video calls. The frame often cuts off the arms. The analyst then misses folded arms but still sees Anderson's other three signs. Audio lag can make both people talk at once. The analyst therefore waits a little longer before concluding that the person has finished.

Notes during the pause. An analyst who writes stops watching. The person then waits for the analyst to finish writing instead of going on. Anderson asks for notes to be taken after the conversation. If the interview needs live notes, a second analyst takes them.

AI considerations

The transcript file (VTT) gives the start and end of each speech segment. A gap between two segments marks a long pause. After the interview, the analyst reads in the transcript what the person said after each pause. The transcript contains personal data within the meaning of the Federal Act on Data Protection (FADP): the analyst submits it only to a service their organisation has approved. A language model can list these passages with their timestamps. The analyst finds each quotation in the transcript before noting it: a model rephrases by default and can invent a sentence.

The transcript keeps no gestures. Some software offers to read emotions from the video of a call. The analyst does not use it: the person agreed to a conversation, not to an analysis of their face. The analyst asks the person what a sign means.

Examples

Each line of the notes keeps the observed sign apart from what the person said next. In the invented case, the analyst interviews the owner of a cantonal hospital's billing application about the two-sprint delay to the interface with accounting. The application owner agreed to be recorded. The words after each pause come from the transcript.

The analyst's notes after the interview. Suggested format and invented example.
Before the pauseDuring the pauseAfter the pause, word for wordNext move
"Testing took longer than planned."Folded arms."Actually, accounting never approved how services are charged to cost centres. Until they do, testing can't finish."Open question: "How is the approval going with accounting?"
"We've chased them twice."Head shake."Last time, they told me it wasn't their project."Back to the topic of the sign: "What exactly did they tell you?" The head of accounting goes on the list of people to interview.
"Everything else is ready."No sign. The application owner looks at the analyst."That's it."The person hands the floor back. Next question in the guide.

The first answer blamed testing. After two pauses, the application owner traces the delay to an approval still awaited from accounting. The analyst will talk to accounting before drawing a conclusion.

Visualisations

The timeline shows one pause: the short answer, the silence during which the analyst watches, what the person says next and the next move the analyst chooses. The notes table shows what the analyst keeps from each pause.

Cost

DimensionLevelJustification
PreparationLowCovered by the interview. No materials to prepare.
ExecutionLowA few pauses in an interview already planned. The technique takes no time of its own.
DocumentationLowOne line of notes per pause. The analyst writes it after the conversation.

Tooling

The technique needs no tool of its own. A notebook takes the notes after the conversation. When several interviews follow one another, a spreadsheet holds them in the four columns of the notes. With the person's consent, the automatic transcription in Teams, Zoom or Webex timestamps each speech segment.

Sources

  • George W. Anderson, Design Thinking for Tech: Solving Problems and Realizing Value in 24 Hours, Addison-Wesley, 2023, ISBN 978-0-13-793303-7. Hour 6 "Understanding the Lay of the Land", section "Design Thinking in Action: Silence by Design", pp. 72-73: the definition, the silence, the non-verbal signs, listening from the top to the bottom. Figure 6.4, p. 74: the ranking of the listening techniques. Same chapter, "Listening and Understanding", p. 70: preparation and notes taken after the conversation. Same chapter, "Design Thinking in Action: Probing for Better Understanding", p. 77: not answering one's own question. Hour 9, "Verbatim Mapping", pp. 125-126: Silence by Design sessions among the sources of verbatims.
  • Kate Kaplan, "Intentional Silence as a Moderation Technique", Nielsen Norman Group, 2020: staying quiet after a participant's answer in an interview, a usability test or a workshop.
  • Government Digital Service, "Using in-depth interviews", GOV.UK Service Manual: staying quiet to let the participant talk.

Staying quiet after an answer belongs to everyday interviewing practice: Nielsen Norman Group and the UK government teach it without reference to Anderson. The name and the observation of non-verbal signs during the pause rest on Anderson. The order of the steps, the end-of-pause rule, the pitfalls, the notes format and the hospital case are our additions.

Shortcuts and Wormholes
All techniques
Simple Ethnography