Shortcuts and Wormholes
Shortcuts and Wormholes is a Design Thinking technique that looks for a shorter route to a goal. It first maps the usual route with its steps and its waits. On this map it then looks for a shortcut or for a rule of the game to change. Finally it weighs what the short route gives up. George W. Anderson describes the technique in Design Thinking for Tech (2023). He also calls it Shortcut Thinking or Finding the Wormhole.
Goal
Shortcuts and Wormholes looks for a shorter path than the obvious one between a situation and a goal. According to Anderson, the obvious path is not necessarily the best one. He asks you to head for the goal without getting caught up in detours.
The technique produces a shorter route that sits on the map beside the usual route. On this map the decision-maker chooses which route to take and what to give up to save time.
Usage
When to use it
- A deadline that the usual route overshoots: the start of the school year, a law coming into force, the end of a contract; look for a route that arrives in time.
- A project schedule that no longer holds: look for a shorter route to complement the scheduling work; Anderson files the technique under schedule management.
- A route made of steps and waits: repeated approvals, sign-offs or releases to production; the map shows the idle time.
- A rule that the organisation sets itself: a release window, a sign-off chain; consider changing it.
- An individual path: a course of study or a certification; map the route with the adviser who knows the rules.
- A team that is losing speed: Anderson proposes chaining the technique with Smart Multitasking and gamification.
When not to use it
- The experience of the trip matters more than its length: Anderson's shortcuts assume the opposite; study the experience with a customer journey map.
- A repetitive flow to measure: the technique measures neither queues nor processing times; measure them with value stream mapping.
- Several chains of activities in parallel: a single route shows only one of them; calculate the minimum duration with the critical path method.
Description
What the book provides
Anderson's glossary sums up the technique as two levers: avoid detours and change the rules of the game. His example follows a student and an academic adviser.
The steps
- Name the start and the finish. You need to know the map: where you are and where you want to go. In Anderson's example the student wants a degree without paying semester by semester and without a loan.
- Map the traditional route. Lay out the route that everyone follows, if only to understand it thoroughly. Anderson likens this work to Journey Mapping, which maps every touchpoint of a customer or a stakeholder.
- Show the waits. Draw each wait as a segment with its duration. Anderson asks that the route show the breaks between semesters. In his view the mapped route can then show parts of a shorter route.
- Shorten the route or change the rules of the game. The first lever avoids detours. The second changes the rules of the game to arrive sooner. Anderson stresses the second: you need to understand these rules and know how to change them.
- Weigh what you give up. Anderson asks you to know your goal and what you are willing to give up. He notes that many routes lead from point A to point B when the speed of the trip matters more than the experience. On the map each shortcut carries its trade-off. Whoever chooses the route then sees the price of each week saved.
- Map the new routes. Draw the shorter route on the map beside the traditional route.
The types of shortcut in the example
Each shortcut in the example illustrates a more general type of shortcut. Anderson does not name these types.
| Type of shortcut (our reading) | In Anderson's example |
|---|---|
| Remove idle time | Study all year round without the long breaks between semesters and over the summer. This shortcut alone brings the degree down to three years or less |
| Reduce the required volume | Choose a programme of 110 credit hours or fewer instead of the usual 120 to 132 credit hours (40 to 44 courses) |
| Count what already exists | Work with the academic adviser to obtain credit for experience or certificates already gained (military training, IT certification) |
| Run steps in parallel | Take Advanced Placement (AP) and College Level Examination Program (CLEP) exams alongside your studies to skip the courses that do not interest you |
Credit hours and the AP and CLEP exams belong to the US university system.
The pitfalls
Taking the example's types of shortcut for a closed list. These types come from a single example. Another route hides other shortcuts.
Counting on a rule that the organisation does not set. A law, a standard or a contract sets some rules. Note on the map who sets each rule that you aim to change.
AI considerations
A language model drafts a first version of the traditional route from an internal regulation, a procedure or a list of steps. Check each step and each duration against the source document: a model can invent a step or a wait.
On the mapped route a model proposes shortcuts by analogy with other fields and names what each one gives up. It does not know which rule the organisation can change and which one a law imposes. So check for yourself who sets each rule.
An internal route can contain contractual deadlines or personal data within the meaning of the Federal Act on Data Protection (FADP). Remove these items before you hand the map to an external AI service. Otherwise use a service that the organisation has approved.
Examples
Each changed segment carries its shortcut and its trade-off.
- 4Specification
- 4Wait for the change advisory board
- 6Development
- 3Acceptance testing (UAT)
- 6Wait for the quarterly window
- 2Specification
- 4Development
- 3Acceptance testing (UAT)
- 2Wait for monthly maintenance
- 1Volume reducedTrade-off: billing postponed
- 2In parallelTrade-off: review of an unfinished specification
- 3Existing work reusedTrade-off: portal layout imposed
- 4Rule changedTrade-off: one more deployment
| Segment | Traditional route | Short route | Shortcut | Change | Trade-off |
|---|---|---|---|---|---|
| Specification | 4 | 2 | Reduce the required volume | Specify the two registration forms without the full module | Billing to parents waits for a second release |
| Wait for the change advisory board (monthly meeting) | 4 | 0 | Run steps in parallel | The board reviews the request from the start of specification. Its review takes two weeks | The board judges an unfinished specification |
| Development | 6 | 4 | Count what already exists | Reuse the form component of the online services portal | The form keeps the layout of the portal |
| Acceptance testing (UAT) | 3 | 3 | None | The municipal office tests the two forms with parents for three weeks | Nothing |
| Wait for deployment to production | 6 | 2 | Rule changed | The head of IT operations accepts the release into the monthly maintenance slot instead of the quarterly window | Operations handles one more deployment that month |
| Total | 23 | 11 |
The traditional route arrives at the end of September. The short route arrives at the beginning of July. Acceptance testing keeps its three weeks: a short route does not shorten every segment.
Visualisations
The diagram sets the two routes of the example one above the other on a scale of weeks. A line marks the start of the school year. A table names the types of shortcut in Anderson's example. The example's table gives the duration and the trade-off of each segment.
Cost
| Dimension | Level | Justification |
|---|---|---|
| Preparation | Low | Collect the duration of each step and each wait on the usual route. The durations often come from several departments. |
| Execution | Low | Map two routes and compare them. Changing a rule then needs the agreement of whoever sets it. |
| Documentation | Low | One map with both routes and the trade-off of each shortcut. |
Tooling
On site a whiteboard holds the map. Sticky notes carry the segments. You move them from one route to the other. Remotely an online whiteboard such as Miro or Mural plays the same role. A spreadsheet holds the durations and the totals of both routes. A Gantt chart in a planning tool shows the steps run in parallel.
Sources
- George W. Anderson, Design Thinking for Tech: Solving Problems and Realizing Value in 24 Hours, Addison-Wesley, 2023, ISBN 978-0-13-793303-7. Hour 18 "Delivering Value at Velocity", section "Design Thinking in Action: Shortcuts and Wormholes", pp. 276-277: the definition, the two levers, the steps, the degree example and Figure 18.3. Same chapter, section "Team Considerations for Velocity": the three velocity techniques and the proposal to chain them. Glossary: the two levers. Hour 24 "Design Thinking for Project Velocity", sections "Development Approach", "Schedule Management" and "Delivery and Quality": the technique listed as a complement to project management.
The names of the types of shortcut and the municipality case are our constructions.