Running the Swamp
Running the Swamp is a timed divergent thinking exercise. A group of 5 to 10 people looks for ways to get the people affected by a problem across a swamp. The swamp stands for the obstacle between their current situation and the target situation. The facilitator places a photo of these people above an image of a swamp. With each minute of the countdown, the photo sinks one notch further. The exercise delivers a wall of unfiltered ideas. They range from the most unrealistic to the most workable. George W. Anderson describes it in Design Thinking for Tech.
Goal
Running the Swamp restarts ideation that is running out of steam. According to the book, in a few minutes the countdown draws out solutions that a team would keep to itself with time to reflect. Divergent thinking produces as many options as possible without judging them. The exercise combines brainstorming, analogy thinking and visual thinking. In the exercise, a team looks for ways to get the people affected by a problem across a swamp. The swamp stands for the obstacle between their current situation and the target situation.
Anderson places the exercise in the "Thinking Differently" phase of his design thinking model. He files it among the exercises that increase creativity. He presents it as a bolt-on. The team has first thought the problem through in depth. The exercise then asks it to think fast. According to the book, the time constraint brings out bold ideas that would not surface without it.
The exercise delivers a wall of notes with ideas that are untenable, practical or difficult but workable. It selects none of them. The book credits it with a second result: the team's empathy for the people it watches sink.
Usage
When to use it
- Ideation that stalls: the book places the exercise after deep reflection. Speed gets the team out of the stall.
- A team that censors itself: the timer and the "no bad ideas" rule cut off any "that will never work".
- A team focused on the project: the photo brings attention back to the people the problem affects.
- A distributed team: the facilitator moves the photo down on a shared virtual whiteboard that all participants see.
- A short slot: one block lasts 5 to 10 minutes; with the discussion the session takes 30 to 45 minutes.
When not to use it
- Options to choose between: the exercise picks none; use dot voting or a decision matrix instead.
- A problem still poorly understood: quick ideas on a vague problem stay vague; frame the problem first with problem shaping and reframing or a problem tree.
- People affected by bereavement, serious illness or disaster: the staged drowning can hurt; run a brainstorming session without the image.
Description
The scenario
The team and the community it serves must get from point A to point B. A swamp lies between them.
The book offers questions to start the search. How can they cross fast enough to avoid sinking? With what gear? How can they get around the swamp? Can they fly over it or run across it like a green basilisk? This Central American lizard runs on water.
Participants and duration
The book calls for 5 to 10 participants and blocks of 5 to 10 minutes. The discussion that follows can bring the session to 30 to 45 minutes.
The session needs a facilitator: they keep the timer, lower the photo and prompt the team.
Materials
The facilitator obtains a photo of the people the problem puts at risk and places it on a larger image of a swamp. A physical or virtual whiteboard carries both. The facilitator also prepares a timer that everyone can see and paper or virtual sticky notes. On paper, the facilitator can also cut off the bottom of the photo with scissors.
The steps
- Bring the group together. The facilitator sets out the situation and the challenge. The photo of the affected people goes on the image of the swamp.
- Pose the problem again. The photo sits well above the swamp. The facilitator restates the problem and announces a timed exercise with no bad ideas.
- Start the 10-minute timer. The team looks for ways to get the community and itself across the swamp. Every full or partial solution goes on a note or on the board.
- Push the photo down at the end of the minute. The facilitator lowers the photo one notch or cuts off its bottom. The book tells the facilitator to make a show of it so that the tension rises in the room or on the video call.
- Repeat every minute. Step 4 recurs until the timer runs out.
- Switch methods when the ideas dry up. The facilitator introduces another way to generate ideas. The book cites a super-condensed version of the Worst and Best exercise or Reverse Brainstorming. The question becomes: how could the situation get worse?
- Accept any solution, even a partial one. The photo keeps sinking. The facilitator pushes the team beyond the easy and obvious ideas. The notes pile up.
- Take the photo down to the mouth. The photo sinks to the waist, then to the chest, the neck, the chin and the mouth. The step ends with the command: "There are no crazy ideas. Save them!"
Spreading the descent over the block
Step 3 sets the timer at 10 minutes, yet the book gives 5 to 10 minutes per block. Step 8 names five stages from the waist to the mouth without saying at which minute each one falls. For a 10-minute block, the facilitator can spread the descent as follows.
| Minute | Position of the photo |
|---|---|
| 0 | Well above the swamp |
| 1 to 5 | Moves closer to the surface, then enters it |
| 6 | At the waist |
| 7 | At the chest |
| 8 | At the neck |
| 9 | At the chin |
| 10 | At the mouth; the timer stops and the discussion begins |
On a 5-minute block, the photo moves from one stage to the next each minute from the waist to the mouth.
When the ideas dry up
In Worst and Best, each participant offers one idea that would make the situation worse. The team then turns each "worst idea" into a "best idea". The book adapts it from the Interaction Design Foundation's Worst Possible Idea method. Reverse Brainstorming works the same way on a longer list: the team lists what would make the problem worse and then turns each answer into a solution. The book asks for a very short version inside the timed block. The photo keeps sinking during that time.
What the exercise produces
According to the book, time pressure cuts off objections such as "that will never work".
The book also promises empathy. The photo shows people rather than a project or a product. The team watches the people it must guide sink. The book says this gives the team the reason and the courage to think differently.
The discussion that follows
The sort is our proposal. The team first sorts each note into one of the three categories of ideas that the book names. The book sees the value in the bold ideas. So for each untenable idea, the team looks for the workable part it contains before discarding it. It then tests the practical ideas and the difficult ones against criteria set before the session. Dot voting or a decision matrix does this sorting.
Renaming the danger
The book invites teams to rename the exercise to fit the situation, the geography, the people or the problem. It cites these variants: Beating the Train, Crossing the Quicksand, Crossing the Bridge, Wading the Lake and Zombie Crossing. A Swiss team can pick a flood or another danger close to home. This example does not come from the book.
Pitfalls
Judging during the countdown. A remark such as "that will never work" cancels the rule announced in step 2. The facilitator cuts the remark short and repeats the question.
Showing a project instead of the people. In the book, the empathy comes from the photo of the affected people. An app mock-up sinking into the swamp loses that effect.
Taking the wall for a decision. An idea born under pressure still has to survive the sort in the discussion.
Staging the drowning of real people. This warning is our own judgement. The book says nothing about it. A photo of recognisable colleagues or users disappearing into the mud can shock. The effect grows worse when the affected group is living through bereavement, serious illness or disaster. The Zombie Crossing variant pushes the same imagery further. A drawing or a stock photo lowers the risk. The renaming that the book proposes also lets the team choose a less deadly danger.
AI considerations
Before the session, an image generator produces the setting: a swamp and a drawn community that resembles the affected people without showing any real person. The facilitator checks that the image does not reduce the group to a cliché. A language model adapts the book's opening questions to the problem.
During the countdown, nobody opens an AI tool. The exercise draws its ideas from the pressure on the team. A model delivers thirty ideas in ten seconds without any pressure. The team would read them instead of looking for its own.
After the session, a multimodal model transcribes the photos of the notes into a list. It groups duplicates and proposes a first sort into the three categories of ideas. The team corrects that sort. Whether an idea is feasible depends on budget, law and the systems in place, which the model does not know.
A photo of recognisable people is personal data (Art. 5 let. a FADP). An organisation that hands this photo to an external AI service makes that service its processor (Art. 9 FADP). A contract forbids the service to reuse the photo for its own purposes. A service hosted outside Switzerland adds the rules on disclosure abroad (Art. 16 FADP). The facilitator removes client names from the notes before handing the photo of the wall to a model.
Examples
In this invented example, a health insurer is dropping paper benefit statements. The photo shows its insured persons aged 75 and over. At point B, each of them receives their statements on the online portal. During the discussion, the team sorts the notes into the three categories of ideas that the book names.
| Note | Category |
|---|---|
| Keep paper for everyone with no time limit | Untenable |
| Give every insured person a tablet | Untenable |
| A home adviser for every insured person | Untenable |
| Paper statement on request with one call to customer service | Practical |
| Delegated portal access for a relative | Practical |
| Access code sent by post | Practical |
| Introduction to the portal in partner pharmacies | Difficult but workable |
| Phone line that reads out the latest statement | Difficult but workable |
| Statement summary by SMS with a link to the portal | Difficult but workable |
The introduction to the portal in partner pharmacies keeps the workable part of an untenable idea: the home adviser for every insured person. The access code sent by post comes from the reversed question of step 6. To the question "how could the situation get worse?" one participant answered "send the code by email to insured persons who don't read their email".
Visualisations
On the image of the swamp, the photo of the affected people sinks minute by minute. The deliverable is the wall of notes. After the discussion, a table sorts each note into one of the three categories of ideas.
Cost
| Dimension | Level | Rationale |
|---|---|---|
| Preparation | Low | A photo, an image of a swamp, a timer and a whiteboard. Mounting the photo on the swamp takes the most time. |
| Execution | Low | According to the book, 5 to 10 people for a block of 5 to 10 minutes. The discussion brings the session to 30 to 45 minutes. |
| Documentation | Low | A photo of the wall or an export of the virtual whiteboard, then the list of sorted notes. |
Tools
On site, a whiteboard or a wall is enough.
Remotely, the team works on a virtual whiteboard such as Miro, Mural or Microsoft Whiteboard. The facilitator locks the image of the swamp. The photo stays a separate object that the facilitator drags down or crops from the bottom each minute. Miro and Mural have a built-in timer that all participants can see.
Sources
- George W. Anderson, Design Thinking for Tech: Solving Problems and Realizing Value in 24 Hours, Addison-Wesley, 2023, ISBN 978-0-13-793303-7, Hour 12 "Exercises for Increasing Creativity", section "Design Thinking in Action: Running the Swamp", pp. 172-175: the definition of the exercise, the scenario, the eight steps, the duration, the number of participants, the results the book promises and the name variants. Publisher's page.

