Grid of three rows by three columns. The rows are the levels Organisation, Process and Job. The columns are the dimensions Goals, Design and Management. Each box names what it contains, from strategy and operating plans at the top left to performance feedback, consequences, coaching and support at the bottom right. In the Goals column, two arrows run down from the organisation to the process, then from the process to the job.

Rummler's Performance Matrix

Rummler's performance matrix is a grid of nine boxes for locating the cause of a performance problem. Its rows are the three levels of an organisation: the organisation as a whole, its processes and the jobs that run them. Its columns are the three dimensions of performance at each level: goals, design and management. Geary Rummler and Alan Brache described it in Improving Performance. Their firm calls it the Nine Boxes Model. The ABPMP's BPM CBOK links it to the process-driven organisation. The analyst files each fact in a box and asks the questions of the boxes that nobody has examined. A training course acts on one box only. It fails when the cause lies in another.

Goal

The matrix answers one question: where should the organisation act when a result falls short? It breaks an organisation's performance down into nine variables. The analyst examines each one before choosing an action.

Rummler and Brache start from one observation: in an organisation, everything is connected. A customer receives a defective delivery. The assembly worker may have made a mistake. The design process may have produced an object that is hard to assemble. Management may have measured and rewarded only the number of units shipped. Training the assembly workers corrects only the first case.

The deliverable is the completed grid. Each box carries findings with their source and the open questions. The grid guides the choice of actions and shows which boxes a proposed action leaves out.

Rummler and Brache use the framework to diagnose and remove a performance gap or to keep improving a system that already performs adequately. They also use it to lead an organisation in a new direction and to design a new entity.

Usage

When to use it

  • A result off target with no known cause: market share, lead time or error rate; locate the cause before choosing the action.
  • Training or a reorganisation already proposed: check the boxes that the action does not touch.
  • Several managers who each see a different problem: bring their findings together on one grid.
  • An automation project or new software: check the process and prepare the job holders before automating.
  • A move to a process-based organisation: set the goals of each process and name its owner.
  • A new unit or department: design the goals, the structure and the management of the three levels together.

When not to use it

  • Cause already located in a specific step: the grid adds nothing; run a root cause analysis on that step.
  • Need to describe how the work flows: the grid shows neither the order of the steps nor the handoffs; use process modelling.

Description

The three levels

The organisation level covers the organisation as a whole: its relationship with its market, its strategy and the division of its main functions. The process level covers the workflows that cross the functions (product development, sales, billing). The job level covers the people who run and manage these processes. Rummler and Brache call it the job/performer level. The CBOK also places at this level the systems that perform activities.

The three levels depend on one another. The organisation produces its results through its processes. People make the processes work. A defect at one level can show up at another.

The three dimensions of performance

The matrix judges each level on three dimensions. Goals set standards that reflect customer expectations for quality, quantity, timeliness and cost. Design arranges the components of the level so that it meets these goals efficiently. Management covers the practices that keep the goals current and check that they are met.

The CBOK labels the columns "Goals & Measures", "Design & Implementation" and "Management". Rummler and Brache call the nine boxes the nine performance variables.

Goals cascade from one level to the next. The goals of a process that serves the external customer derive from the organisation's goals and from customer requirements. The goals of a job derive from the requirements of the processes it contributes to. Rummler and Brache finalise functional goals only once they know what each function contributes to the processes.

Goals
Design
Management
Organisation
GoalsStrategy, operating plans and metrics
DesignOrganisation structure and business model
ManagementPerformance review and management culture
Process
GoalsCustomer and business requirements
DesignProcess, systems and workspace design
ManagementProcess owner, day-to-day management and continuous improvement
Job
GoalsJob description, performance metrics and individual development plan
DesignRoles and responsibilities, required skills, procedures, tools and training
ManagementPerformance feedback, consequences, coaching and support
The nine performance variables of Rummler and Brache. Each level of the organisation has its goals, its design and its management. Goals cascade from the organisation to the process, then from the process to the job.

The process level and the white space

The organisation chart shows the functions and their reporting lines. Rummler and Brache use the term white space for the gap between the boxes of the chart, where the work passes from one function to the next. At the organisation level, they locate the greatest opportunities for improvement in this gap. At the process level, the greatest opportunities often lie between the steps.

Order processing passes through sales, the supply chain and accounting. Each function measures its own share of the work. Nobody answers for the end-to-end lead time until the organisation names a process owner. According to the CBOK, this role integrates the contributing jobs into the cross-functional process.

Senior management
Customer order
Order processing
Sales
Enter the order
Handoff
Supply chain
Prepare and ship
Handoff
Accounting
Invoice and collect
Payment received
Process owner: answers for the end-to-end lead time
The organisation chart divides the work into functions. Order processing cuts across them. The handoffs between sales, the supply chain and accounting fall into the white space between the boxes. The process owner answers for the end-to-end lead time.

At the organisation and process levels, management covers goals, performance, resources and interfaces. Goal management sets the subgoals of each function or of each step. Performance management tracks the measure, reports its results and corrects deviations. Resource management allocates staff, equipment and budget. Interface management handles the white space between functions and between steps.

The questions for each box

Rummler and Brache attach diagnostic questions to each variable. At the job level, management covers everything around the person. The authors call this the Human Performance System and examine it through six questions.

LevelDimensionDiagnostic question
OrganisationGoalsDoes the organisation have clear goals that reflect its choices: its competitive advantage, new markets and new services, its priorities among products, the resources invested and the expected return?
OrganisationDesignDoes the organisation have all the functions its strategy requires? Should supplier-customer relationships between functions be added, removed or changed?
OrganisationManagementDoes senior management manage the goals, performance, resources and interfaces between the functions?
ProcessGoalsDo the cross-functional processes that carry the strategy have goals? Do these goals derive from customer requirements and from the organisation's goals?
ProcessDesignDo the steps of each process lead to its goals efficiently?
ProcessManagementDoes the organisation manage the goals, performance, resources and interfaces of each process?
JobGoalsWhich jobs contribute to each process? Do their expected outputs and standards derive from the requirements of the process?
JobDesignDo the scope and the responsibilities of the job allow its holder to meet the goals?
JobManagementPerformance specifications: do the job holders know which outputs to produce and to which standards?
Task support: do they have sufficient resources and clear instructions and priorities? Are their responsibilities consistent?
Consequences: are they rewarded when they meet their goals?
Feedback: do they know whether they meet them?
Skills and knowledge: do they have the skills and knowledge required?
Individual capacity: if the five previous answers were yes, would they have the physical, mental and emotional capacity to meet them?
The questions that Rummler and Brache ask of the nine performance variables.

The six job questions rest on an assumption of the authors: most people are motivated and capable. When they do not perform as well as they could, the cause most often lies in the system they work in.

Job design sets the required skills and the training that provides them. Job management checks that the job holders have these skills.

Running the diagnosis

Rummler and Brache start at the organisation level, whose goals set the direction that all the other variables build on. The procedure applies this order to a measured gap. Its division into steps comes from analyst practice.

  1. Quantify the gap. The analyst writes down the target result, the measured result and the person who tracks the measure. "68% market share against a target of 80%" fits in a box. "Sales are falling" fits nowhere.
  2. Name the process and the jobs. The analyst identifies the cross-functional process that produces the result, then the jobs that contribute to it in each function. A SIPOC sets its boundaries.
  3. Examine the organisation level. The analyst asks the questions of the three boxes at this level. Without a goal at this level, the processes have no reference from which to derive their own.
  4. Move down to the process, then to the job. The analyst asks the questions of each box. The answers come from measures, documents, interviews and observation of the work.
  5. Write a finding or an open question in each box. A finding names its source or the person who tracks the measure. An empty box flags a variable that nobody has examined.
  6. Link the boxes. For each symptom, the analyst looks for the box that holds its cause. Late order entry shows at the job level. Its cause can lie in the job's goals, in the entry tool or in the lack of feedback on errors.
  7. Choose the actions and track their effects. Each action names the boxes it touches. A process change can alter the responsibilities of the jobs and the skills they require. An action on the process therefore calls for a check of the jobs.

Pitfalls

Training by reflex. Training acts only on the skills and knowledge of a job's holders. Rummler and Brache credit it with little lasting effect when the cause lies at another level or in another variable.

Automating the process as it is. An inefficient process becomes an automated inefficient process. Automation also falls short of its expected return when nobody links it to the organisation's goals or when nobody prepares the job holders who will use it.

Setting functional goals before process goals. Each function optimises its own measure. The end-to-end lead time then belongs to nobody.

Starting with the people. An analyst who fills in the job boxes before the process boxes blames people for a defect of the system.

Treating the boxes one by one. The CBOK stresses the interaction among the levels and among the nine variables. A grid where each box gets its own action reproduces the functional split that the matrix sets out to overcome.

Leaving senior management out of the diagnosis. The top three boxes describe the choices of senior management. A mandate that excludes them leaves the process goals without a verified reference. The analyst states this limit in the report.

AI considerations

A language model drafts an interview guide from the questions of the nine boxes and adapts it to the process under study. It sorts interview notes, survey responses or complaint reasons into the boxes. For each symptom, it suggests the boxes where the cause might lie.

The analyst checks the classification line by line. One fact can fit several boxes: weekly order entry can belong to the job's goals, its design or its management. The model often keeps only one without saying so. It also misses what the notes do not contain: a conflict between two directors or a goal that nobody has written down. Findings at the job level concern identifiable people. They are personal data under the Federal Act on Data Protection (FADP). The analyst anonymises them before passing them to an external service. When a job has one or two holders, its title alone identifies them: the analyst also removes the job title from the findings or keeps the processing in-house.

Examples

The CBOK describes an order-processing case. A company holds 68% of its market and aims for 80%. The grid sorts the facts of the case and the questions they leave open.

LevelGoalsDesignManagement
OrganisationFinding: 68% market share against a target of 80%. The marketing manager tracks this measure.Finding: the company is organised by function (marketing, supply chain, sales). Order processing links them.Finding: each manager tracks the measure of their own function. Senior management sees that revenue is not growing.
Process: order processingFinding: 9 days from order acceptance to shipment. The supply chain manager tracks this measure.
To check: the lead time that customers require for the company to reach 80% market share.
To check: the steps where the order waits during these 9 days.Finding: none of the three managers sees the process end to end.
To check: who answers for the total lead time.
Job: sales representativeFinding: orders entered once a week; 1 to 10% of forms incomplete; 83% of orders accurate. The sales manager tracks these measures.
To check: is daily entry among the expectations of the job?
To check: the form, the entry tool and the point in the sales round when orders are entered.To check: feedback on errors, the consequences of late entry and the skills.
The CBOK order-processing case sorted into the nine boxes. The three managers each track a measure in the Goals column. The possible causes of weekly order entry remain to be found in the boxes marked "To check".

None of these three measures covers the design or the management of the process and the job. Training in filling in the forms would answer only one of the open questions.

Visualisations

The reference form is the grid of three rows by three columns. The levels read from top to bottom and the dimensions from left to right. One colour per state distinguishes the "Finding" boxes, the "To check" boxes, the boxes where the analyst has settled on a cause and the empty boxes. For organisation design, Rummler and Brache draw a Relationship Map that shows the links between the functions. At the process level, a swimlane flowchart places one function per lane. The handoffs between lanes show the white space.

Cost

PhaseLevelJustification
PreparationMediumQuantify the gap, delimit the process and the jobs, obtain access to senior management and to the measures.
ExecutionHighInterviews at all three levels, reading the measures and observing the work for nine variables.
DocumentationMediumA grid and a report that link each finding to its source and to the neighbouring boxes.

Tools

In a workshop, a poster divided into nine boxes and sticky notes are enough. A spreadsheet holds the working grid: one row per finding with its box, its source and the symptom it explains. A modelling tool such as diagrams.net, Visio or a BPMN editor draws the swimlane flowchart of the process. A distributed team fills in the grid on an online whiteboard (Miro, Mural).

Sources

  • ABPMP, Guide to the Business Process Management Common Body of Knowledge (BPM CBOK), version 3.0, §8.1.3 Rummler's Performance Matrix: the three-by-three grid and the three levels; §8.1.4: goals, design and management at each level and the interaction among the nine variables; §8.1.5: integrating the process into the organisation's goals; §8.2.3: the process owner; §6.7: the order-processing case.
  • Rummler-Brache Group, The Nine Boxes Model: the three levels, the three dimensions, the content of each box and the effects of a process change on the jobs.
  • Geary Rummler and Alan Brache, The 3 Levels of Performance, Rummler-Brache Group: the definition of the levels and dimensions of performance, the cascade of goals, the white space, the diagnostic questions for each variable, the Human Performance System, the limits of training and automation and the uses of the framework.
  • Geary A. Rummler and Alan P. Brache, Improving Performance: How to Manage the White Space on the Organization Chart, 3rd edition, Jossey-Bass / Wiley, 2012: the book in which the authors present the three levels and the nine performance variables. The CBOK cites the 1995 edition.