House of quality for the mobile app of a cantonal bank. On the left, four customer needs with their importance. On the right, their weight: pay a QR-bill in a few seconds (50%), protect access to the account (20%), see the balance on opening (20%), find an old payment quickly (10%). At the top, four technical characteristics with their direction of improvement: duration of a QR payment, balance display delay, authentication factors, duration of a history search. In the centre, relationships rated 9, 3 and 1. The roof carries a positive correlation between the payment duration and the balance display delay. It carries two negative correlations between the authentication factors and these two delays. At the bottom, the technical importance: 470, 340, 390 and 90, then the current measurements, those of the competitor and the target values.

Quality Function Deployment (QFD)

Quality function deployment (QFD) is a design method that translates customer needs into measurable technical characteristics and then into target values. Its central tool is the house of quality: a matrix that crosses the weighted needs with the technical characteristics and calculates which ones serve customers most. Its roof shows the characteristics that work against each other. Yoji Akao and Shigeru Mizuno founded the method in Japan.

Goal

QFD links what the customer asks for to what the team builds. The customer says "I pay a bill in a few seconds". The engineer measures a duration between two screens. The method writes down the link between the two, rates its strength and works out where design effort yields the most satisfaction.

QFD helps the team allocate design effort: which technical characteristics to improve and to what value. According to John Hauser, the method translates the voice of the customer into the voice of the engineer. A cross-functional team runs it: marketing, development, production and sales.

The deliverable is the completed house of quality. It carries the needs and their weights, the technical characteristics and their direction of improvement, the strength of each relationship, the calculated importance of each characteristic, the measurements compared with the competitor and the target values. These targets become design requirements.

Usage

When to use it

  • New product or redesign of a service: translate dozens of collected needs into measurable characteristics before design starts.
  • Marketing, development and operations disagree on priorities: the functions fill in and read the same matrix.
  • Limited design budget: the calculated importance shows which characteristics serve the heaviest needs.
  • Known and comparable competitor: the planning matrix sets where to close the gap and where to stand out.
  • Non-functional requirements without a number: each characteristic receives a unit, a direction of improvement and a target value.

When not to use it

  • No voice of the customer collected: the matrix weights guesses; run interviews or a survey first.
  • One need and a few measures: the CTQ tree follows the need down to its measures without a matrix.
  • Choice between several solution concepts: QFD sets the targets without choosing the concept; move to the decision matrix.

Description

A Japanese method of product development

The founding book by Yoji Akao and Shigeru Mizuno appeared in Japan in 1978 and in English in 1994. According to John Hauser and Don Clausing, the house of quality first appeared in 1972 at the Mitsubishi shipyard in Kobe. Toyota and its suppliers then developed it. Ford and Xerox introduced QFD in the United States in 1986. Hauser reports that in some applications the method cut design time by 40% and design costs by 60%. The 2021 edition of the ISO 16355-1 standard describes its general principles.

Hauser and Clausing present the house of quality as the basic tool of QFD. It is the first of its matrices.

The whats and the hows

The house crosses two lists. The customer needs are the "whats": what the customer expects. The team writes them in the customer's words. The technical characteristics are the "hows": quantities that the team measures and adjusts, each with its unit. "I pay a QR-bill in a few seconds" is a need. "Time between the scan and the confirmation, in seconds" is a technical characteristic.

"Add facial recognition" describes a solution: it fixes the concept before the matrix has spoken. "Number of authentication factors at login" is a quantity that several solutions can reach.

The rooms of the house

The house takes its name from its shape. The needs fill the left-hand column. The technical characteristics fill the top row. A triangular matrix sits on top of them like a roof. The team fills in the rooms from 1 to 8. Other authors number them differently.

The rooms of the house of quality
In the order in which the team fills them in
Roofcorrelations between characteristics: + or −
Technical characteristicsunit and direction of improvement
Customer needsthe customer's words and their importance
Relationship matrix9 strong, 3 medium, 1 weak
Planning matrixcurrent and competitor satisfaction, goal, ratio, sales point, weight→ 5: weight × relationship
Technical importancesum of relationships × weight
Competitive technical assessmentcurrent measurement and competitor measurement
Target valuesone numeric target per characteristic
The rooms of the house of quality in the order in which the team fills them in. The weights of the planning matrix multiply the relationships to give the technical importance. Each technical column runs through the relationships, the importance, the competitive assessment and the target values.

1. Customer needs and their importance. Each row carries one need and the importance rating that customers give it, often on a scale of 1 to 5. The needs come from the voice of the customer: interviews, surveys, complaints, observation. The team groups the verbatim comments with an affinity map and keeps the customer's wording.

2. The planning matrix. To the right of the needs, this block of columns turns importance into weight. On the same scale, customers rate their satisfaction with the current product and with the competitor's product. The team sets a satisfaction goal for each need.

The improvement ratio divides the goal by the current rating. The sales point is 1 for most needs. It often rises to 1.2 or 1.5 for a need that the team wants to promote against the competitor. The raw weight multiplies the importance, the ratio and the sales point. The weight expresses each raw weight as a percentage of their sum. Scales and sales-point values vary from one team to another.

Customer needImportanceOur productCompetitorGoalRatioSales pointRaw weightWeight
I pay a QR-bill in a few seconds52442.01.51550%
Nobody else can access my account54441.01.2620%
I see my balance as soon as I open the app32442.01.0620%
I find an old payment quickly33331.01.0310%
Total30100%
Planning matrix for the mobile app of a cantonal bank. The ratio divides the goal by the current rating. The raw weight multiplies the importance, the ratio and the sales point.

QR payment and security have the same importance. QR payment still weighs two and a half times as much: its ratio of 2 doubles its weight and its sales point raises it further. The calculation gives 5 × 2 × 1.5 = 15, which is half the total.

3. Technical characteristics and their direction. At the top, each column carries a technical characteristic, its unit and its direction of improvement: maximise, minimise or hold at a value. The team looks for at least one characteristic per need.

4. The relationship matrix. In the centre, each cell states how strongly a technical characteristic acts on a need. The most common convention rates a strong relationship 9, a medium one 3 and a weak one 1. An empty cell means no relationship. The scale spreads the values so that a strong relationship dominates the sum. Each added authentication factor slows down payment: the relationship is rated 3 even though the effect is unfavourable. In this convention, technical importance measures how much a characteristic weighs on satisfaction in either direction. The direction of improvement in room 3 says which way to adjust it.

5. Technical importance. Below the matrix, each characteristic receives a calculated importance: the sum over all needs of the relationship rating multiplied by the weight of the need. The duration of a QR payment scores 9 × 50 + 1 × 20 = 470. This row ranks the technical characteristics.

6. The competitive technical assessment. Below the importance row, the team enters the measured value of each characteristic for its own product and for the competitor's product. This row checks the perceptions recorded in the planning matrix. If customers rate the competitor better on a need while the measurements say the opposite, the team may be measuring the wrong quantity.

7. Target values. At the bottom, each characteristic receives its target: "10 s at most", "2 factors". The target takes account of the satisfaction goal, the competitor's measurement and what the technology allows.

8. The roof. The triangle at the top crosses the technical characteristics with one another. A positive correlation links two characteristics that improve together. A negative correlation signals a conflict: improving one degrades the other. The roof sets out the trade-off before design. A conflict between two top-ranked characteristics calls for an explicit decision or for a solution that removes it.

Building the house in workshops

For a digital service, the team brings together the product manager, the business analyst, the architect, operations and customer service. The analyst prepares the voice of the customer and facilitates the sessions.

The first session sets the scope: one product, one customer segment, one reference competitor. One house per segment avoids averaging customers who expect different things.

Between sessions, the analyst often uses a survey to have customers from the segment rate importance and satisfaction. The team does not rate importance on their behalf. Otherwise the matrix weights the internal view.

The second session writes the technical characteristics and rates the relationships. The team fills in the matrix row by row and asks which quantities move the need. The team settles a debate over a rating with one question: "If we improve this quantity, will the customer notice it on this need?"

The third session compares the measurements, fills in the roof, discusses its conflicts and sets the targets. The spreadsheet calculates the importance.

Reviewing the house

The team reviews the completed house before it moves the targets into the requirements.

A row without a strong relationship. No technical characteristic acts strongly on this need. The team adds a column or removes the need from the scope.

An empty column. The characteristic serves no stated need. It is often a solution that the team favours. Sometimes it serves a need that customers do not put into words. Kano analysis shows that customers rarely mention threshold needs.

An overfilled matrix. When most cells carry a rating, the team has rated indirect links and the matrix no longer ranks anything. The team keeps the relationships that it could justify to a customer.

A column that dominates everything. A characteristic strongly linked to almost every need is often too general. "Code quality" is the typical case: the team breaks it down into measurable quantities.

The pitfalls

Needs written by the engineer. "Response time under 2 seconds" is a characteristic disguised as a need. The row and the column then say the same thing. The 9 that links them proves nothing. The team goes back to the verbatim comment: "the app responds straight away".

False precision. The calculation multiplies ratings that are ranks. A score of 470 against 450 does not separate two characteristics. Technical importance separates a leading group from the secondary characteristics. Between two close characteristics, the team decides with the roof and the cost.

The house that grows too big. Forty needs against thirty characteristics make 1'200 cells to rate. The team runs out of energy before it reaches the roof. One house per subsystem or per segment stays readable.

The house that stays on the wall. The target values reach neither the requirements nor the acceptance criteria. The house cost three sessions and steers nothing. Each target becomes a non-functional requirement traced through to the test.

The chain of houses

According to Hauser, QFD links four houses in sequence. After the house of quality, the voice of the customer flows down to the part characteristics, to the key process operations and then to the production requirements. The hows of one house become the whats of the next with their target values and their importance.

The chain of QFD houses
The hows of one house become the whats of the next
House 1: house of quality
howsTechnical characteristics
whatsCustomer needs
House 2
howsPart characteristics
whatsTechnical characteristics
software or service: functions or components
manufacturing
House 3
howsKey process operations
whatsPart characteristics
House 4
howsProduction requirements
whatsKey process operations
The chain of QFD houses according to John Hauser. Each house takes as its rows the characteristics that the previous house carries as columns with their target values. For software or a service, the chain often stops at the first or the second house.

For software or a service, the chain often stops at the first or the second house. The second house crosses the technical characteristics with the functions or the components. The last houses serve manufacturing: they set the process parameters that the control plan monitors.

The CTQ tree follows one need down to its measures. QFD weights dozens of needs and crosses them with the technical characteristics. The measures of a CTQ tree supply candidate columns for the house.

Kano analysis classifies needs by their effect on satisfaction. It corrects a weakness of the improvement ratio. Improving a threshold need that is already met adds no further satisfaction. An excitement need can justify a goal beyond the competitor.

The decision matrix then compares the solution concepts that reach the targets. The Pugh matrix is its design variant.

The analytic hierarchy process can supply the importance of the needs when customers compare them in pairs. Prioritisation ranks items against one another. QFD links each need to a technical response and ranks the responses.

Hoshin kanri borrows the relationship matrix of QFD for its X-matrix.

AI considerations

A language model speeds up the grouping of the voice of the customer. Given a few hundred verbatim comments, it proposes groups and a need label for each group. The analyst checks that each label keeps the customer's words. A model tends to rewrite "I pay in a few seconds" as "transaction time in seconds", which is already a characteristic.

For each need, it proposes candidate technical characteristics with their unit and their direction of improvement. It spots the characteristic that describes a solution. On the completed house, it flags the rows without a strong relationship, the empty columns and the roof conflicts between top-ranked characteristics. The calculation stays in the spreadsheet.

Customers supply the importance and the satisfaction. A model that estimates them invents the input data of the whole house. The team rates the strength of the relationships because it knows the real product and its architecture. Verbatim comments often contain personal data. They go into an assistant only once anonymised and only on a tool that complies with the Federal Act on Data Protection (FADP).

Examples

A cantonal bank redesigns its mobile app.

The house of quality of a mobile banking app
The planning weight puts the QR payment duration at the top
+ positive correlation
− negative correlation
+−−
Customer needs
Importance
C1Duration of a QR payment (s)↓ minimise
C2Balance display delay (s)↓ minimise
C3Authentication factors (number)○ target value
C4Duration of a history search (s)↓ minimise
Planning matrixWeight
I pay a QR-bill in a few seconds
Importance5
C19
C23
C33
Weight50%
Nobody else can access my account
Importance5
C11
C39
Weight20%
I see my balance as soon as I open the app
Importance3
C29
C33
Weight20%
I find an old payment quickly
Importance3
C21
C49
Weight10%
Technical importance
C1470
C2340
C3390
C490
Rank
C11
C23
C32
C44
Current measurement
C125 s
C24 s
C32
C43 s
Competitor
C18 s
C21.5 s
C32
C42 s
Target value
C1≤ 10 s
C2≤ 2 s
C32
C4≤ 3 s
9 × 50 + 1 × 20 = 470
House of quality for the mobile app of a cantonal bank. The weights of the planning matrix and the relationships rated 9, 3 and 1 put the duration of a QR payment at the top of the technical importance. The roof shows that each added authentication factor slows down payment and the balance display.

Customers give security and QR payment the same importance. With importance alone, the number of authentication factors would score 69 points against 50 for the duration of a QR payment. The planning weight reverses the order: 470 for QR payment, 390 for authentication. Of these 390 points, 210 come from unfavourable links with payment and with the balance display: the bank holds authentication at its target of two factors without increasing it. On security, the bank already meets its goal. The roof keeps the trade-off visible: each added authentication factor lengthens payment and delays the balance display.

Visualisations

A drawing shows the house of quality: the triangular roof and the blocks arranged around the relationship matrix go beyond the grid of a table. The spreadsheet that calculates the house keeps its grid without the roof.

The planning matrix is a table. Technical importance reads as a sorted bar chart that shows the gap between the leading group and the secondary characteristics. A cascade drawing shows the chain of houses: the top row of one house becomes the left-hand column of the next.

Cost

DimensionLevelJustification
PreparationHighCollecting the voice of the customer and running the survey that rates importance and satisfaction take several weeks.
ExecutionMediumThree half-day sessions for a house of about twenty needs, with five to seven people from several functions.
DocumentationMediumA spreadsheet kept up to date when the needs or the measurements change. Each target moves into the requirements.

Tooling

A large sheet on the wall or a whiteboard holds the first house. The team rates the relationships on it during the session and then transfers them to the spreadsheet.

A spreadsheet calculates the weights and the technical importance. It redoes the calculation each time a rating changes. The team tests the sensitivity of the ranking: does a 9 brought down to 3 change the top of the order?

A digital whiteboard such as Miro or Mural holds the house when the team works remotely.

Dedicated QFD software carries the hows of one house into the whats of the next. It pays off when the team deploys beyond the first house.

Sources

  • Hauser, John R. and Clausing, Don (1988), The House of Quality, Harvard Business Review, May 1988: the house of quality as the basic tool of QFD, its origin at the Mitsubishi shipyard in Kobe in 1972 and its development by Toyota and its suppliers.
  • Hauser, John R. (1993), How Puritan-Bennett Used the House of Quality, Sloan Management Review, spring 1993: the cross-functional team, the translation of the voice of the customer into the voice of the engineer, the chain of four houses and the arrival of QFD in the United States in 1986.
  • Akao, Yoji (ed.) (1990), Quality Function Deployment: Integrating Customer Requirements into Product Design, Productivity Press: the English translation of Akao's book on implementing QFD.
  • Mizuno, Shigeru and Akao, Yoji (1994), QFD: The Customer-Driven Approach to Quality Planning and Deployment, Asian Productivity Organization: the English version of the founding book published in Japan in 1978.
  • ISO 16355-1:2021, General principles and perspectives of quality function deployment (QFD), International Organization for Standardization: the general principles and perspectives of QFD.