Your Training Partner
Techniques Toolbox
QC Story storyboard in seven slides from left to right: problem, data, Pareto, Ishikawa, countermeasures, results, standard. A band above links the slides to steps 1 to 6. An arrow runs back from the results to the problem when the effect falls short. A strip below the slides carries step 7 (reflection).

QC Story

The QC Story is the problem-solving method of Japanese quality circles. QC stands for quality control. A small team improves its own work in fixed steps: it states the problem, collects data, analyses the causes, implements a solution, measures its effect, standardises what worked and draws lessons from the process. The team presents the project in the same sequence. Each step shows its evidence: a reader who missed the meetings can thus check the whole line of reasoning. Hitoshi Kume gives a seven-step version. Other organisations count eight or ten. The sequence follows the PDCA cycle (plan, do, check, act).

Goal

The QC Story is an improvement method in fixed steps that a frontline team runs on its own process. It starts from a problem measured by an indicator. It ends with a standard that keeps the problem from returning, then with a review of the process. The deliverable is the story of the project: a series of slides where each step carries its conclusion and the data that proves it.

Shoji Shiba and David Walden present seven steps and note that teams also use them to report on improvement work. In their view a standard form saves debating at every project how to present an analysis. It lets the work circulate across the organisation and supports review and coaching. It also prevents a step from being skipped by accident.

The story leads to a decision: to change the process permanently at step 6 on the strength of the effects measured at step 5. For the business analyst, this deliverable makes an improvement verifiable by someone who was not in the room.

Usage

When to use it

  • A recurring problem tracked by an indicator: the story starts from the measured gap and follows it to the standard.
  • A team from one department improving its own work: the circle runs the study and presents each step of it.
  • A result to present to management that did not follow the project: each step starts from the conclusion of the one before.
  • Staff who need training in problem solving: a fixed sequence can be taught, repeated and corrected.
  • Several teams to compare: a common form makes projects comparable from one department to the next.
  • A team without a statistics background: the seven basic quality tools are enough to run the steps.
  • A team spread over several sites: the slides live in a shared file where each step owner writes their own.

When not to use it

  • A defect that has already reached the customer: apply the eight disciplines (8D), whose D3 containment protects the customer before the search for causes.
  • A cross-functional problem at management level: keep the reasoning on one page with A3 problem solving.
  • Variation to reduce with advanced statistics: run a DMAIC project with trained specialists.

Description

Quality circles

Kaoru Ishikawa founded the quality circle headquarters within the Union of Japanese Scientists and Engineers (JUSE) in 1962. JUSE defines the circle as a small group of people from the same workplace who carry out quality control activities themselves. In 1970 the headquarters published the general principles of the circles under the title QC Circle Koryo.

Presenting has been part of the method from the start. In 1962 JUSE launched the annual conference for foremen. There they presented their cases to their peers. The first conference reserved for quality circles took place in 1963. For Ishikawa, the person who presents learns by presenting.

In 2014 Mark Graban visited two companies and a hospital in Japan where the circles are still active. A circle there brings together six to eight people from one department. Each member takes charge of at least one step. The team presents its QC Story as a slide deck. One of the companies puts training in problem solving ahead of financial gain.

The seven steps

Shiba and Walden present seven steps. Their glossary names them 7 QC Steps (QC Story) and refers, among other sources, to Kume's chapter (pp. 191-206). The step titles follow Shiba and Walden.

  1. State the specific problem. The team chooses the problem to tackle and states it in measurable terms. "Invoicing quality" is a theme. "14% of invoices blocked at matching" is a problem.
  2. Collect data. The team confirms the problem with facts and looks for where it arises: at which workstation, on which product, at what moment.
  3. Analyse causes. The team draws conclusions from the data and forms hypotheses about the root causes. It then checks each hypothesis it selects against data.
  4. Plan and implement the solution. The team compares ways to remove the cause and tries the best one.
  5. Evaluate effects. The team analyses the trial data to see whether the problem has receded. If it has not, the team returns to step 1.
  6. Standardise the solution. The team changes the process permanently: procedure, work instruction, system setting, training of new staff.
  7. Reflect on the process. The team records what it learned about problem solving. It uses this on the next problem.

One question, tools and evidence per step

Kelvin Chan trains practitioners for the Asian Productivity Organization (APO). He names the seven basic quality tools that the method uses: check sheet, graphs, control charts, Pareto chart, cause-and-effect diagram, histogram, stratification with scatter diagram. In his view the method demands no in-depth technical knowledge from circle members.

StepQuestionToolsEvidence on the slide
1. State the problemWhat gap, on which indicator?Trend chartThe indicator, its current value and the dated target
2. Collect dataWhere and when does the problem arise?Check sheet, stratification, Pareto chart, histogramThe tally and the category that weighs most
3. Analyse causesWhy this category?Ishikawa diagram, scatter diagramThe selected cause and the data that confirms it
4. ImplementWhich action on which cause?Countermeasure tableEach action tied to a cause, with an owner and a date
5. Evaluate effectsHas the problem receded?The step-1 chart extended, Pareto before and afterThe step-1 indicator measured after the trial with the same definition
6. StandardiseHow to prevent a return?Revised procedure, control chartThe revised document, its owner and the tracking of the indicator
7. ReflectWhat did we learn about the process?Team reviewThe lessons recorded and the next problem
Each step answers a question and leaves evidence. Each step starts from the conclusion of the one before.

The Pareto chart of step 2 points to the category to analyse. The Ishikawa diagram of step 3 covers that category alone. An Ishikawa drawn on the whole problem yields a list of possible causes that nobody knows how to sort.

The histogram of step 2 shows the spread of a continuous measure such as a lead time or an amount.

The number of steps varies

Shiba and Walden note that other methods count six to eight steps. In their view the exact number matters little. The APO publishes an eight-step version mapped onto the PDCA cycle: steps 1 to 5 form the Plan, step 6 the Do, step 7 the Check and step 8 the Act. The circles Graban observed follow eight or ten steps. The Shiba and Walden list counts neither the schedule nor the target as a step. The APO and Graban make them separate steps.

FunctionShiba and Walden (after Kume)APO (Chan, 2009)List recorded by Graban (2014)
Choose the theme1. State the specific problem1. Select the theme (Plan)1. Brainstorm problems
2. Select a theme and explain the choice
Plan the projectno separate step2. Plan the work schedule (Plan)5. Schedule the activities over six months
Describe the situation2. Collect data3. Understand the present situation (Plan)3. Analyse the current state and narrow the problem
Set the targetno separate step4. Set the target (Plan)4. Set goals
Find the causes3. Analyse causes5. Analyse the problem (Plan)6. Analyse root causes
Act4. Plan and implement the solution6. Implement (Do)7. Implement changes
Check5. Evaluate effects7. Evaluate results (Check)8. Check the effects
Hold the gain6. Standardise the solution8. Standardise (Act)9. Standardise and stabilise
Prepare what comes next7. Reflect on the processno step10. Identify the next project
Three breakdowns of the same method. The longer versions make the schedule and the target separate steps.

An organisation chooses one breakdown and keeps it. Projects broken down the same way can be compared and reviewed.

The story in slides

The QC Story is presented in one or two slides per step. A seven-slide layout follows the steps and their tools: problem, data, Pareto, Ishikawa, countermeasures, results, standard. In that layout, step 2 takes two slides: the tally and its Pareto. A strip below the slides carries step 7.

The QC Story storyboard
Each slide tied to its step
Step 1Problem
Step 2Data
Step 2Pareto
Step 3Ishikawa
Step 4Countermeasures
Step 5Results
Step 6Standard
effect falls short: back to step 1
Step 7. Reflection: lessons and next problem
Each slide carries the evidence of one step. An insufficient effect leads back to the problem statement.

A slide title states its conclusion. "Data" names a topic. "41% of blocks come from a price variance" states a conclusion. The titles alone must tell the whole story. The data under the title proves that conclusion. It gives its period, its source and its sample size.

Each circle member presents the step they led. Management asks its questions slide by slide. A question the slide cannot answer points to a step to redo.

The business analyst steps in at step 6 when the standard touches a system setting. The standard then becomes a change request on the ERP and a change to the process model. Before management accepts the result, the analyst also reviews the chain of evidence from the problem statement to the standard.

The step-5 loop

Shiba and Walden state the rule for leaving step 5: if the problem has not receded, the team returns to step 1. A missing effect often signals a badly framed problem or a misidentified cause. Chan describes a variant: if the proposed solutions do not work, the circle can rethink them and try again. Going back to step 1 forces the team to reread the statement and the data before choosing another action. If the statement and the cause hold, the team quickly moves back to step 4.

Step 5 measures the effect on the step-1 indicator with the same definition and the same base. A team that changes its indicator during the project can no longer show an effect. It shows two figures that cannot be compared.

Pitfalls

Choosing the solution before the analysis. David Verble points out that filling in an A3 or 8D report does not solve the problem: the work comes before the report. The rule holds for the QC Story. A team that chose its solution in advance writes steps 2 and 3 to justify it. The symptom is an Ishikawa with causes on a single branch.

Starting from a theme instead of a problem. "Improve the service" cannot be measured. Step 5 then has nothing to compare.

Proposing an orphan countermeasure. An action without a cause from step 3 does not come from the analysis. The countermeasure slide shows it with no link to the Ishikawa.

Stopping the project at the result. A team that celebrates the step-5 figure and moves on loses the gain within a few months. The step-6 standard and the tracking of the indicator lock it in.

Skipping the reflection. Without step 7 the team repeats the same mistakes of method on the next project. At a company Graban visited, step 9 of the method documents the lessons learned. The managing director considers these lessons the most important item.

Padding the deck. Appendices and charts without a conclusion bury the evidence. A slide carries one message. Its chart proves it.

Boundaries with neighbouring methods

A3 problem solving descends from the QC Story. According to Verble, the A3 format arose so that quality circles could report their work to management. Graban observes that the two follow the same reasoning and similar steps. The A3 fits on a single sheet. The QC Story fills a slide deck.

DMAIC runs a Six Sigma project in five phases and uses statistics that the seven basic tools do not cover. The QC Story stays within reach of a frontline team trained in those seven tools.

The PDCA cycle supplies the logic. The QC Story cuts it into named steps and gives each its evidence.

AI considerations

An assistant counts and charts: from a check sheet exported to a spreadsheet, it counts the categories, sorts the Pareto and computes the cumulative percentage. The team checks the totals against the tally. From the meeting notes the assistant proposes slide titles that state a quantified conclusion. The team corrects them. The assistant checks the chain of the story: it flags a countermeasure with no linked cause, an indicator that changes definition between steps 1 and 5, a step without evidence. It also produces the German version of the slides when the circle works in French and management in German. A bilingual person from the department reviews it.

The data stays outside its remit. A model that has not observed the process produces figures that are plausible and wrong. An invented tally distorts every step that follows. The team checks the cause on the shop floor. A model proposes candidate causes for the Ishikawa and confirms none of them. The reflection of step 7 comes from the team: a review written by a model teaches nothing to those who did not write it. A QC Story also carries staff names, performance figures and at times customer or patient data. The Federal Act on Data Protection (FADP) decides which tool they may lawfully be entered into. For patient data the cantonal rules on health data apply as well.

Examples

The completed storyboard shows the chain of evidence. Each step starts from the conclusion of the one before. The accounts payable circle of a machine manufacturer in the canton of Vaud tackles the invoices blocked at matching in its ERP.

Invoices blocked at matching
The QC Story of an accounts payable circle
ProblemStep 114.0% of invoices blocked at matching
412 blocked invoices out of 2'950 in four weeks of March
10%
March
14.0%
Target: below 10% by end of June
DataStep 2Every invoice records its block reason
Price variance
168
Missing purchase order
112
Goods receipt not posted
74
Wrong VAT
31
Other
27
Total
412
ParetoStep 241% of blocks come from a price variance
40.8%68.0%85.9%93.4%100%
Price variance168
Missing purchase order112
Goods receipt not posted74
Wrong VAT31
Other27
IshikawaStep 3Price variances follow contract renewals
MethodContract renewed without updating the price record
SystemERP price record without a validity date
PeopleStand-in buyers not trained in price entry
SupplierIncrease announced by email only
Price variance (168)
131 of the 168 variances concern a contract renewed less than six months ago
CountermeasuresStep 4Each action targets the selected cause
ActionCauseOwnerFrom
Update the price record on the day of signatureContract renewed without updateLead buyer1 April
Check renewed contracts against the ERP price records every monthContract renewed without updateHead of purchasing30 April
ResultsStep 59.4% of invoices blocked in June: target met
10%
Before
14.0%
Four weeks of March: 412 of 2'950 (14.0%)
After
9.4%
Four weeks of June: 274 of 2'900 (9.4%)
BeforeAfter
Price variance
168
36
Missing purchase order
112
110
Goods receipt not posted
74
72
Wrong VAT
31
30
Other
27
26
loop not taken: target met
StandardStep 6Price updates join the renewal procedure
Contract renewal procedure: step added to update the ERP price record
Monthly check in the closing checklist
Owner: head of purchasing
Indicator tracked every month
Step 1
Step 2
Step 3
Step 4
Step 5
Step 6
loop not taken: target met
Step 7
Reflection: a four-week tally was enough. Next theme: the missing purchase order (27% of March blocks).
Each slide title states a conclusion. The step-1 indicator also measures the effect at step 5.

The slide titles tell the story of the project without the charts. The circle reaches the target while the second Pareto bar has not moved. The team tackled one category only. At step 7 the circle makes the missing purchase order the theme of the next project.

Visualisations

The storyboard lays slides out in space and carries a loop that runs back from step 5 to step 1. A diagram shows it at a glance, where a table would lose the loop. The completed storyboard carries the charts of the case with their figures. The steps and their evidence read row by row and stay a table. The comparison of breakdowns aligns three versions on the same functions and stays a table too.

Cost

DimensionLevelJustification
PreparationMediumTrain the circle in the seven basic tools, set the indicator and its target.
ExecutionHighA circle project spans several months of short meetings. The first tally takes several weeks. The step-4 trial must last long enough for step 5 to measure an effect.
DocumentationMediumThe circle keeps the slides step by step. It then assembles the final story in a few hours.

Tooling

The paper check sheet remains the workstation tool: the person who sees the case ticks it on the spot. A spreadsheet such as Excel or LibreOffice Calc then takes over the tally and plots the Pareto, the histogram and the trend charts. Statistical software such as Minitab or JMP becomes useful when the circle puts the indicator on a control chart at step 6.

Presentation software such as PowerPoint holds the slides. A board in the department displays the slides as the project goes and shows progress to those who do not sit on the circle.

Sources

  • Kume, Hitoshi (1985), Statistical Methods for Quality Improvement, AOTS (Association for Overseas Technical Scholarship), Tokyo, chapter "The QC Story", pp. 191-206: one of the sources Shiba and Walden give for the seven steps. The book can be borrowed digitally on the Internet Archive.
  • Shiba, Shoji and Walden, David (2002), Quality Process Improvement Tools and Techniques, MIT and Center for Quality of Management, revision 6: the seven steps and their reference to Kume among other sources, the return to step 1 when the effect falls short, the use of the steps to report the work, the reasons for a standard form and the observation that the number of steps varies from six to eight.
  • Chan, Kelvin (2009), Employee involvement through quality circles, APO News, Asian Productivity Organization, February 2009: the eight-step version mapped onto the PDCA cycle, the tools of the method, how a circle reworks solutions that had no effect and the point that the method requires no in-depth technical knowledge.
  • JUSE (Union of Japanese Scientists and Engineers), Chapter 10, Father of the QC Circle: Prof. Kaoru Ishikawa: the founding of the quality circle headquarters in 1962, the definition of the circle, the 1970 QC Circle Koryo and the conferences where circles present their cases.
  • Graban, Mark (2014), Quality Circles Are Alive and Thriving in Japan: Lessons in A3 Thinking and Kaizen, leanblog.org: the observation of Japanese circles with eight or ten steps, the size of the circles, the slide-deck presentation, the lessons-learned step and the closeness to the A3.
  • Verble, David (2020), Dueling Methods: 8D and A3, The Lean Post, Lean Enterprise Institute: the origin of the A3 format as the reporting tool of quality circles and the reminder that filling in a report does not solve the problem.
Purpose-To-Practice (P2P)
All techniques
Quality Function Deployment (QFD)