Purpose-To-Practice (P2P)
Purpose-To-Practice (P2P) is a meeting structure from Liberating Structures. In it, the stakeholders of an initiative design five elements together: the purpose, the principles, the participants, the structure and the practices. The group first settles the purpose. It then designs the other four elements to serve it. Each element goes through 1-2-4-All: each person alone, then in pairs, then in fours, then the whole group. Henri Lipmanowicz and Keith McCandless describe P2P in The Surprising Power of Liberating Structures (2013). The session lasts two hours according to the book and about 125 minutes according to the authors' site.
Goal
In P2P, the stakeholders design their initiative together. The group answers one question per element. The purpose states why the work matters to the participants and to the larger community.
The book has all the stakeholders design the initiative instead of a small group behind closed doors. In the same session, the group covers every element needed to launch the effort and sustain it. According to the authors, a strategy that everyone has made their own gets implemented and spreads quickly. Power shared fairly makes the initiative more resilient to disruption. The group can then adapt each element when circumstances change. The site ties P2P to the Liberating Structures principle "Never Start Without a Clear Purpose".
The session produces the P2P chart: a purpose statement and the answers that the group kept for each of the other four elements. It also produces a prioritised list of next steps and a date to revisit the chart.
The business analyst uses P2P to launch a programme, network or shared service that several organisations or departments run together. You'll find the other structures in the repertoire under Liberating Structures.
Usage
When to use it
- Launching an initiative with several stakeholders: design the five elements with all the stakeholders before the first plan, even when there are many of them.
- A consortium or network between organisations: share control among the members from the design stage.
- A movement or community of practice to launch: set the common purpose before recruiting the members.
- A funding application to write: settle the purpose, the participants and the structure before writing the application.
- A strategy or planning retreat: structure the long session around the five elements.
- A small project: the five questions form a checklist.
- An initiative launched several months ago: revisit the chart and adapt the elements in the light of experience.
- A distributed team: run the rounds in breakout rooms on a shared whiteboard.
When not to use it
- A chronic problem to solve with no initiative to launch: look for the solutions already in practice with Discovery & Action Dialogue.
- An initiative that is already designed and lacks only its rules: set the must dos and must not dos with Min Specs.
Description
The elements of the initiative
The question for each element follows the site's wording.
Purpose. "Why is this activity or work important to us and the larger community?" The book asks why the work is important to each participant. Its worksheet opens the statement with the stem "… exists to…". The purpose can start something positive or stop something negative. Writing it is the most important step. It must have a strong pull on the participants.
Principles. "What rules must we absolutely obey to make progress toward our purpose?" The group writes them as must dos and must not dos. They often come from hard lessons learned in the field. A principle settles a decision: "answer every question within five working days" tells whether an answer arrives in time. A value such as "mutual respect" leaves the decision open. The health insurer example gives more principles.
Participants. "Who must be included and engaged to achieve our purpose?" The book asks who can contribute to the purpose and must be included. The group looks beyond the obvious people.
Structure. "How must we organize and distribute control to achieve our purpose?" The book counts both macrostructures and microstructures under Structure. Structure is usually the element that requires the most imagination: designing it moves the initiative from top-down control to distributed control. The group looks for patterns and technologies that give control to the people closest to the local work. The site warns that the details of Structure can bog the group down and call for a separate exploration. The facilitator then notes the open questions for that exploration.
Practices. "What are we going to do or offer? How will we do it?" The book's question names what the group will offer its users or clients. The facilitator can add questions to this round: "What is happening around us that creates an opportunity? What is at stake if we do not take a risk? Where are we starting, honestly?"
The group judges each answer for the other four elements by one question: does it serve the purpose? A practice that does not serve the purpose leaves the chart.
- PurposeWhy is this activity or work important to us and the larger community?
- PrinciplesWhat rules must we absolutely obey to make progress toward our purpose?
- ParticipantsWho must be included and engaged to achieve our purpose?
- StructureHow must we organize and distribute control to achieve our purpose?
- PracticesWhat are we going to do or offer? How will we do it?
The book and the site
The authors describe each Liberating Structure by its design elements: the structuring invitation, the space and materials, the distribution of participation, the group configuration, the steps and the time allocation. The site revises the book's 2013 version.
| Aspect | Book (2013) | Authors' site |
|---|---|---|
| Structuring invitation | Invite all or most stakeholders to design their new initiative by specifying its five elements | "Imagine we are a group of explorers mapping out steps for our big adventure. We start with a compass for setting a clear direction and correcting course when we lose our way based on our shared purpose and the principles we agree to follow." |
| Space and materials | Chairs and small tables for groups of four. A large wall with poster paper to record the result of each element. One worksheet per element and per participant | An open wall with the P2P template. Tables of four. A copy of the template and sticky notes for each participant |
| Distribution of participation | All the stakeholders of the initiative. Everyone has an equal opportunity to contribute | The same people. A facilitator. An online tech host. No minimum group size |
| Group configuration | 1-2-4-All. The whole group finalises each element | 1-2-4-All in the room and 1-3-All online |
| Going back to earlier elements | A 5-minute question after each element | An instruction with no time of its own |
| Duration | 2 h stated. The purpose round takes 30 min. The book gives no time for the other four rounds | About 125 min in seven steps |
| Close | Revisit the design from time to time after the launch | A 3-minute step to set the review date |
| Online | A chat version of 1-2-All with a whiteboard and a person who synthesises | Moves back and forth between the main room and fixed groups in breakout rooms. A visual collaboration space. Broadcast messages to keep time |
Preparing the session
The facilitator invites all the stakeholders of the initiative. For a service shared by several municipalities, this means the future users, the departments that will provide the staff and the elected official who champions the project. Someone who misses the session does not make the design their own.
The facilitator prepares the wall with one area per element and prints one template per participant. The facilitator gives roles to participants with a talent for writing, drawing or synthesising. Graphic recording helps the group stay attentive throughout the design.
An initiative can require several sessions spread over weeks or months. Before the session, the facilitator decides how many elements it covers.
The business analyst facilitates the session or takes part in it. As facilitator, the analyst runs the process and leaves the content to the participants. If the analyst wants to contribute to the content, someone else facilitates.
The steps according to the authors' site
The site runs each element in 1-2-4-All.
- Introduction (2 min): the facilitator reads the structuring invitation and hands out the templates. Online, each person draws their own.
- Instructions (5 min): the facilitator presents the five elements and the question for each.
- Clarify the purpose in small groups (10 min): the participants form groups of four. With 1-2-4-All, they generate ideas and stories for the purpose.
- Finalise the purpose (10 min): in plenary, a few groups share their ideas. The room consolidates them into one purpose and writes it on the shared template.
- Complete the other elements (4 × 20 min): the group repeats the two previous steps for the principles, the participants, the structure and the practices. It goes back to earlier elements as needed.
- Reflect (15 min): the group steps back to look at the whole draft. New groups of four generate and prioritise next steps with What, So What, Now What?
- Plan the follow-up (3 min): the participants set when they will revisit the P2P chart.
The steps add up to 125 minutes.
- 2 minIntroductionPlenary
- 5 minInstructionsPlenary
- Purpose round20 min
- 10 minClarify the purposeGroups of four in 1-2-4-All
- 10 minFinalise the purposePlenary
- Rounds of the other elements4 × 20 min
- 20 minPrinciples1-2-4-All then plenary
- 20 minParticipants1-2-4-All then plenary
- 20 minStructure1-2-4-All then plenary
- 20 minPractices1-2-4-All then plenary
- 15 minReflectionNew groups of four
- 3 minFollow-upPlenary
To finalise the purpose in 10 minutes, the facilitator asks three or four groups to read their proposal. The room marks the words that recur. One person uses these words to write a single statement in the form "… exists to…". The room tests the statement against the purpose question. It also checks that the statement rules out some practices: a purpose that justifies them all decides nothing.
The book splits the purpose round into three 10-minute steps. In 1-2-4, each person generates ideas and stories for the purpose. The groups of four compare, sift and amplify the best ideas. The whole group integrates the themes and finalises the purpose. The book runs the other four rounds with the same steps. It asks the facilitator to keep the rounds on schedule and to run a second round when time runs short.
Going back to earlier elements
An element designed later can contradict an element already settled. A structure that gives control to the local sites needs participants from those sites. A practice can require a principle that nobody has named.
So the book asks a 5-minute question after each element: "Has this element shed new light that suggests revisions to previous elements?" It tells the group to "expect some messy nonlinearity". The site asks the group to be prepared to revise earlier elements. The facilitator records on the chart each revision and the round that triggered it.
After the session
After the launch, the participants revisit their design from time to time. They adapt the elements in the light of their experience.
The business analyst transcribes the chart and the prioritised next steps. Each step gets an owner and a date. The named participants go into the stakeholder list. The purpose becomes the criterion that decides between requirements. The "must not do" principles become constraints when the team elicits the requirements.
Variations
The group can open with a rapid 30-minute cycle through the five elements. The cycle shows the group that a design without a clear purpose stays half-baked.
When all five are too much, the book proposes covering only the one or two most important elements. The site gives each element a visual symbol to hold the group's attention.
Online, the book accepts imperfect first rounds. Online rounds can deepen or complement face-to-face exchanges.
What makes P2P fail
A generic purpose such as "do better together" justifies any principle and any practice. The chart then decides nothing. The rapid cycle exposes this defect before the full rounds.
Management that arrives with a ready-made organisation chart turns the Structure round into a sign-off. At the start, the facilitator presents the elements already decided as constraints. The group designs the rest.
The small groups do the heavy lifting. The facilitator keeps the pace. A group that goes straight to plenary collects mostly the ideas of the people who talk the most.
The group works in rapid cycles and accepts failing forward. A chart that the group wants perfect in the first round will not be finished in the session.
A chart without a review date describes the initiative on launch day. The group sets that date before it leaves the room.
P2P in strings
The authors combine several Liberating Structures into a string.
| Element | Structure that the site proposes |
|---|---|
| Purpose | Nine Whys |
| Principles | Appreciative Interviews |
| Participants | Social Network Webbing |
| Structure | Network Relationship Patterns |
| Practices | Options Place |
When the initiative launches a new activity, the site first uses Creative Destruction to stop the activities that would hold the new one back. To deepen the conversation about the purpose, the book proposes Nine Whys, Appreciative Interviews or TRIZ. TRIZ is the book's name for Creative Destruction.
Chapter 6 of the book places P2P at the head of a string that spreads an innovation. P2P designs an organisation that its members own together. Drawing Together generates ideas for operations that are integrated and autonomous at once. Integrated~Autonomy spells out how to work across distant sites.
In chapter 7, twenty-five leaders spend three hours choosing the big idea of a collaborative project. They then use P2P before they write their funding application.
Origin
Henri Lipmanowicz and Keith McCandless developed P2P. The book names Dee Hock as its inspiration and refers to his book Birth of the Chaordic Age. The site refers to the work of Dee Hock and the Chaordic Commons.
The leaders of the Conversation Café movement have used P2P. Researchers from several US health systems used P2P to create the Quality Commons research consortium. A management team found a deeper purpose than expected in the first element. That purpose led the team to rethink its business model.
AI considerations
Before the session, a language model extracts must dos and must not dos from a lessons learned report. These are candidate principles. The facilitator holds them back until the end of the Principles round. The group looks through them for lessons it has forgotten.
The model does not write the purpose. The book grounds the value of P2P in a design that everyone owns. A purpose written by a model reproduces the closed-door design that P2P sets out to avoid. Once the room has settled the content, the model can propose three wordings of the statement in the form "… exists to…". The room chooses.
After the session, the model transcribes the photos of the wall into the chart and merges duplicate sticky notes. It flags the practices that the purpose does not justify and those that contradict a "must not do" principle. The group rules on each flag at the review.
The participant list names people. These names are personal data within the meaning of art. 5 let. a of the Federal Act on Data Protection (FADP, SR 235.1). The facilitator gives the chart only to an AI service that their organisation has approved.
Examples
A health insurer launches a community of practice for its 40 business analysts in Lausanne, Fribourg and Sion. Each row of the chart answers the question of its element and serves the purpose statement.
| Element | What the group kept |
|---|---|
| Purpose | The community exists to put a business analyst in touch within one week with a colleague who has already solved the same problem. |
| Principles | Must do: answer every question within five working days. Share models that contain no data on insured persons. Must not do: approve or grade colleagues' deliverables. Reserve the meetings for senior analysts. |
| Participants | The 40 business analysts. Volunteer product owners. The head of operations as sponsor. Added in the Practices round: the testers of the quality team. |
| Structure | One circle per site that meets every month. Each circle appoints a coordinator for six months. No central chair. A shared channel for questions. The sponsor holds a budget of CHF 6'000 a year. |
| Practices | One model review per month on a real case from the site. A repository of reusable BPMN models and decision tables. Three months of mentoring for each new analyst. |
| Review | In plenary in June 2027. |
The last Participants line comes from a revision. In the Practices round, the group noticed that the testers already read the models that the monthly review examines. When the revision question came, the group reopened Participants to add them.
Visualisations
A diagram shows the five elements, their order and the return to earlier elements. A second diagram places the site's seven steps on a time axis with the group configuration. The comparison of the versions, the structures that the site strings together with P2P and the example's P2P chart are tables.
Cost
| Phase | Level | Justification |
|---|---|---|
| Preparation | Medium | Invite all the stakeholders, prepare the wall and the templates, decide whether one session is enough. |
| Execution | High | About 125 minutes according to the site and 2 hours according to the book. All the stakeholders take part. A large initiative needs several sessions over weeks or months. |
| Documentation | Medium | Transcribe the chart and the next steps, record the revisions, return to the chart at each review date. |
Tooling
In the room, the shared chart covers an open wall lined with poster paper. Each participant receives a printed template. In the book's version, each participant receives five worksheets. Sticky notes carry the ideas of the rounds. A visible timer paces the rounds.
Remotely, a video conference with breakout rooms (Zoom, Microsoft Teams) replaces the tables of four. A collaborative whiteboard (Miro, Mural) holds a prepared template with the five areas. The video conference chat receives the answers in the book's 1-2-All version.
After the session, a shared document holds the chart. The group records the revisions and their dates in it.
Sources
- Henri Lipmanowicz, Keith McCandless, The Surprising Power of Liberating Structures: Simple Rules to Unleash a Culture of Innovation, 2013, ISBN 978-0-615-89337-2: the description of P2P with its elements, steps, purposes, tips, variations, examples, attribution to the authors and inspiration from Dee Hock (Field Guide, p. 305); the strings that spread an innovation (chapter 6); the three-hour session that launches a collaborative project (chapter 7).
- Purpose-to-Practice (P2P), Liberating Structures: the current version with its invitation, its questions, its seven steps in about 125 minutes, the online run, its uses, the principle "Never Start Without a Clear Purpose" and the structures that it strings together with P2P.
- Federal Act on Data Protection (FADP), SR 235.1, art. 5 let. a: the definition of personal data, which the participant list contains.