Two rounds of a Pugh matrix for document intake at a fiduciary firm. In round 1, the team compares A, B, C and D with the current process. It continues A, combines B with A and drops C and D. In round 2, A becomes the datum. The team compares the hybrids H1 and H2 with it. It drops H1 and selects H2.

Pugh Matrix

The Pugh matrix is a grid that selects solution concepts by comparing each one with a single concept from the set. The concepts fill the columns and the criteria fill the rows. The team picks one concept as the reference (the datum). On each criterion, it judges whether each other concept does better (+), as well (S) or worse (−) than the datum. Stuart Pugh devised the method in the 1980s for product design and named it controlled convergence. The counts of +, − and S guide the discussion: the team drops the weak concepts, combines the strong ones into hybrids, takes the best as the new datum and starts again.

Purpose

The Pugh matrix narrows a set of competing concepts down to a few stronger ones. A concept is a solution still at the sketch stage: a diagram, a few words, no detailed costing. The Institute for Manufacturing (IfM) at the University of Cambridge describes the method as a non-numeric and iterative tool that aims to improve the concepts and to reduce their number.

It fits a team that holds several solution ideas and cannot cost them yet. A weighted matrix would demand scores and weights that nobody can justify at this stage. The Pugh matrix asks only for a relative judgement: on this criterion, does this concept do better or worse than the datum? Each round ends with one decision per concept: continue the concept, combine it with another or drop it.

The deliverable is one completed matrix per round. Each matrix marks the datum and gives the number of +, − and S for each concept. It also records what happens to each concept. The last round delivers the selected concept and the refined criteria that set it apart.

Usage

When to use it

  • Concepts at the sketch stage: without reliable figures, a comparison with a datum is enough to sort them.
  • Five to ten competing concepts: the team wants to drop some, combine others and keep the best.
  • An existing solution to replace: the current solution is the datum in round 1.
  • A cross-functional team with strong opinions: the criterion-by-criterion comparison replaces each member's case for their own concept.
  • Requirements already prioritised: the highest-ranked ones supply the criteria, for example after a quality function deployment.

When not to use it

  • Detailed and costed options and a choice the team must justify: use the weighted decision matrix, which ranks on declared scores and weights.
  • Disagreement on the importance of the criteria: use the analytic hierarchy process, which derives the weights from pairwise comparisons.

Description

The elements of the grid

The concepts fill the columns. The IfM recommends five to ten. Each concept has a name and comes as a sketch with a few words. The MIT systems engineering course asks the team to compare all concepts at the same level of abstraction and in similar language. Otherwise a concept described on three pages beats a sketch because people understand it better.

The criteria fill the rows. For the IfM, the list of criteria is the decisive element of the matrix. They come from customer needs and from internal needs: manufacturing, maintenance, unit cost, technical risk. In a business analysis project, these internal needs become operations, compliance, data protection or licence cost. The team aims for about ten high-level criteria. Each one reads only one way. Each criterion states which direction counts as better: for running cost, + means cheaper. The whole team approves the list before the first comparison.

The datum (the reference) is one of the concepts. According to the IfM, any of them can serve in round 1. An existing solution makes the work easier because everyone knows its strengths and flaws.

Each cell compares a concept with the datum on one criterion. It gets + if the concept is better or easier, − if it is worse or harder, S (same) if it is roughly equivalent. MIT writes this last case as S or 0. The datum column stays empty. Below the grid, three rows count the +, the − and the S for each concept.

Running a round

  1. Sketch the concepts. A name, a diagram, a few words, the same level of detail for all. With fewer than five concepts, the team first produces more by brainstorming or with a morphological box.
  2. Set the criteria. The whole team approves about ten unambiguous criteria.
  3. Choose the datum and compare. The facilitator takes one criterion and runs every concept through it before moving to the next. Everyone keeps the same yardstick in mind along the whole row.
  4. Count. The facilitator counts the +, the − and the S for each concept.
  5. Combine and improve. When a strong concept suffers from a single flaw, the team often fixes it with a minor change. It sometimes borrows that change from another concept. It drops a concept with no strong point. The team also drops a concept whose every + appears in a stronger concept with fewer −: it brings nothing to combine. The team records what happens to each concept.
  6. Investigate disputed cells. When the team cannot agree on a sign, the facilitator notes the question. The team has it checked before the next round by a trial, a supplier quote or an expert opinion.
  7. Start again with a new datum. One of the strongest concepts becomes the datum of the next round. The team sharpens the criteria and gives them numerical values where possible. It does so above all when new concepts have appeared.
  8. Take stock. Does the team agree on the result? Does one concept stand out? Do the results make sense? Does a flaw recur in every concept?

The facilitator sets the pace of the session and keeps the matrix. MIT also makes the facilitator responsible for the group's discipline: the facilitator brings every exchange back to the comparison with the datum, cuts tangents, has the criteria and concepts clarified and looks for hybrids. MIT also reports what Pugh says about the group's resistance. Experienced participants grow impatient and want to move on. Those whose concept was dropped defend it with emotion, experience and raised voices. The facilitator then brings each objection back to a cell: on which criterion and against which datum?

Reading the counts

The MIT course quotes Total Design. In the book, Pugh writes that the scores are a guide and must not be summed algebraically. He sets his method against scoring and weighting matrices and rejects their rigidity and false assurance. Yet the IfM and MIT subtract the number of − from the number of + and rank the concepts on this net total. MIT adds that this total serves only as a guide.

The net total treats all criteria as equal: a + on a minor criterion cancels a − on data protection. Two criteria that measure the same thing count twice in the net total. The team reads the three counts together, then looks at which criteria carry the −.

If no concept stands out, the IfM gives the probable cause: ambiguous criteria or concepts that are too similar. A − that recurs in every column signals a common flaw. The team examines it in its own right before the next round.

MIT mentions a weighted version that needs the team to agree on the weights. It also cites a seven-level scale from −3 to +3. Both variants bring back the numerical precision that the method avoids at the sketch stage. Once the weights are set, the grid becomes a weighted decision matrix.

MIT warns that the most important criterion may be intangible and missing from the list. It therefore advises against making the grid the only selection filter. For the IfM, the method is only as effective as the team's input, the criteria and the starting concepts.

Choosing the datum

MIT notes that the ranking can change with the datum. Against a weak datum, almost every concept collects + and the counts no longer separate them. In the worked example, 7 of the 24 cells give S against the current process. Against A, 7 of 12 do.

Frey and his co-authors modelled the method by simulation with virtual teams that alternate evaluation, idea generation and investigation. In their models, a strong datum helps the concepts converge.

Iterating: controlled convergence

MIT reproduces the page of Total Design where Pugh describes what the matrix offers. The matrix drives convergence: the team eliminates the weak ideas and keeps a set of strong concepts. It also drives divergence: the team spots the concepts to combine. In each round, the team drops some concepts and adds others: the hybrids born of the discussion and the new ideas it prompts.

From one round to the next, the team sharpens the criteria. "Time to data entry" becomes "Entry within 2 working days". A comparison that gave S in round 1 may then give + or − in round 2. The team stops when one concept stands out, the results make sense and everyone agrees.

In the models of Frey and his co-authors, repeated matrices bring the experts' opinions closer together. Investigations planned between two rounds strengthen this effect. The ideas that the matrices prompt improve the concepts and ease convergence. Over a wide range of assumptions, the method yields better design outcomes than a single summary criterion or a Borda count. A Borda count adds up the ranks obtained on each criterion.

Pugh matrix and decision matrix

The decision matrix answers the question "Which option gets the best score?" The Pugh matrix answers "Which concepts keep their place and which hybrid beats them?"

Weighted decision matrixPugh matrix
RatingScore on a fixed scale (1 to 5, 1 to 10)+, S or − against a datum
WeightsOne weight per criterionNone
TotalWeighted sum that ranks the optionsCounts of +, − and S that guide the discussion
ProcessOne passSeveral rounds with a new datum and hybrids
InputDetailed and costed optionsSketched concepts
ResultThe highest-scoring optionA small number of improved concepts
Both grids set the options against the criteria.

The Pugh matrix narrows sketches down to two or three concepts that the team then details and costs. A weighted decision matrix decides between these finalists. Multi-criteria decision analysis and the analytic hierarchy process also require weights. The Pugh matrix requires none.

AI considerations

Before the session, a language model helps bring the concepts to the same level of detail. From each author's notes, it drafts a description of the same length and structure for each concept. The best-written concept then no longer wins on presentation alone. The model also reviews the list of criteria and flags those that read two ways or measure the same thing.

From the transcript, the model records for each cell the argument that decided the sign. In the next round, the team rereads these arguments when it sharpens the criteria. Between rounds, the model proposes hybrids. It looks for concepts whose + fall where another concept has its −. The team judges whether the combination holds up technically.

The team rates the cells itself. The method draws its value from the discussion of each sign. A + proposed by a model has nobody in the room to defend or challenge it. Nor does the model know the datum: the strengths and flaws of an existing solution live in the heads of the people who run it. A project's concepts are confidential. They go to an external AI service only under a data processing agreement (art. 9 FADP).

Examples

A Lausanne fiduciary firm is reviewing how it receives its clients' accounting documents. Today an employee keys in the documents that clients drop off or send on paper. This process is the datum in round 1.

CriterionCurrent: paper and manual entryA: client portalB: mail scanning by a service providerC: mobile app (photos of documents)D: submission by email
Client effort to submitDatum+S++
Time to data entry++++
Legibility and completeness of documents+S−−
Data protectionS−S−
Running cost+S−S
Submission without a digital device−S−−
Number of +4122
Number of −1133
Number of S1411
OutcomeContinued as the round 2 datumCombined with ADroppedDropped
Round 1. Each cell compares the concept with the current process: + better, − worse, S equivalent.

A has only one −: clients without a digital device can no longer submit their documents. B keeps the paper route and speeds it up. The team combines the two into H1. B's − on data protection gives rise to a second variant: H2 scans the paper at the office. Neither C nor D brings a + that A does not already have. In round 2, A becomes the datum and the team sharpens the criteria.

CriterionA: client portalH1: portal and scanning by a service providerH2: portal and scanning at the office
Client effort to submitDatumSS
Entry within 2 working daysSS
95% of documents usable without chasing the clientSS
Documents accessible to the fiduciary firm only−S
Annual running cost−−
Submission without a digital device++
Number of +11
Number of −21
Number of S34
OutcomeDroppedSelected
Round 2. A becomes the datum. The team sets a numerical threshold for the time to data entry and for the share of usable documents.

H2 equals or beats H1 on every criterion. Against A, its counts do not decide: one + against one −. Round 2 reduces the choice to one question: is submission without a digital device worth the cost of scanning at the office? The partners answer yes and select H2.

Round 1
Currentpaper and manual entryDatum
AClient portal4 +1 −1 SContinued
BScanning by a service provider1 +1 −4 SCombined
CMobile app2 +3 −1 SDropped
DSubmission by email2 +3 −1 SDropped
Round 2
AClient portalDatum
H1Portal and scanning by a service provider←AB1 +2 −3 SDropped
H2Portal and scanning at the office←AB1 +1 −4 SSelected
Idea from B's − on data protection
+ better, − worse, S equivalent
In round 1, the team compares A, B, C and D with the current process. It continues A, combines B with A and drops C and D. In round 2, A becomes the datum. The team compares the hybrids H1 and H2 with it. It drops H1 and selects H2.

Visualisations

A grey background and the word "Datum" mark out the datum column. The signs stay written out: a colour may reinforce them, never replace them. The facilitator places the three count rows and the "Outcome" row below the criteria: each decision reads under the column it concerns.

Over several rounds, a diagram links the concepts from one round to the next: the datum of each round, the dropped concepts and the origin of each hybrid. It shows a sponsor why the selected concept survived.

Cost

PhaseLevelRationale
PreparationMediumSketching the concepts to the same level of detail and getting the whole team to approve the list of criteria.
ExecutionMediumOne round fits into one facilitated session. The team spreads two or three rounds over several sessions and runs investigations between them.
DocumentationLowOne matrix per round, with the outcome for each concept.

Tools

In the room, a whiteboard or a large sheet of paper is enough. The facilitator posts the sketches above the columns and writes the signs where everyone can see them.

A spreadsheet holds the matrix and counts the signs with the COUNTIF function. One sheet per round keeps a record of each round's datum and of the outcome for each concept.

Remotely, a shared whiteboard such as Miro or Mural shows the sketches and the grid on the same canvas. No dedicated software is needed.

Sources

  • Stuart Pugh, Total Design: Integrated Methods for Successful Product Engineering, Addison-Wesley, 1991: the primary source for controlled convergence. The MIT course quotes its warning against adding up the scores and against weighted matrices.
  • Institute for Manufacturing, University of Cambridge, Controlled Convergence: the steps of the method, the choice of datum, the +, S and − rating, combining concepts, iteration and the review questions.
  • Olivier de Weck, MIT OpenCourseWare, 16.842 Fundamentals of Systems Engineering, Fall 2015, Session 5: the steps, rating relative to a datum, the facilitator's role, the quotations from Total Design and the critique of the method.
  • Daniel D. Frey, Paulien M. Herder, Ype Wijnia, Eswaran Subrahmanian, Konstantinos Katsikopoulos and Don P. Clausing, "The Pugh Controlled Convergence method: model-based evaluation and implications for design theory", Research in Engineering Design 20(1), 2009, pp. 41-58: the evaluation of the method by simulation, compared with a single summary criterion and a Borda count.