Your Training Partner
Techniques Toolbox
The case of the polluted river that de Bono describes. The usual track puts the factory's water intake upstream and its outflow downstream. The provocation "Po: the factory is downstream of itself" stands outside that track. Judgement asks whether the statement is true and rejects it. Movement asks where it leads and arrives at an idea: the water intake downstream of the outflow. The return to the original problem justifies the idea in hindsight.

Provocation and movement (Po)

Provocation and movement is a lateral thinking technique that Edward de Bono describes in Serious Creativity (1992). The group or the analyst first sets up a provocation: a statement that is false or impossible on purpose. The word "Po" precedes it: "Po: the factory is downstream of itself". The group then draws ideas from it through movement. Movement is an active operation: it asks where the statement leads instead of judging whether it is true. The deliverable is a harvest of ideas and concepts. Judgement comes after the harvest.

Goal

Provocation and movement produce ideas outside habitual reasoning. According to de Bono, the brain stores information in stable patterns and follows the best-established one. A provocation puts the thinking at a point that experience does not reach. Movement goes from that point to a new idea. The group comes back to the original problem and justifies the idea in hindsight.

De Bono gives the example of a polluted river: a factory usually takes in its water upstream and discharges its effluent downstream. "Po: the factory is downstream of itself" is literally impossible. Yet the provocation leads to a rule: the factory takes in its water downstream of its own outflow. It is then the first to suffer its own pollution. De Bono says he has been told that this rule became law in some countries.

The technique feeds a decision: which ideas and concepts go forward to evaluation. It does not evaluate them. The deliverable is the harvest of the session. It sorts each idea, concept, need or new focus into the categories of de Bono's checklist. Each item carries the provocation and the movement technique it came from.

Usage

When to use it

  • Established process that nobody questions: escape removes something everyone takes for granted and forces the group to rethink the procedure.
  • Workshop that keeps producing the same solutions: a provocation makes the group start from a point that nobody would have proposed.
  • Green hat time in a Six Thinking Hats session: movement gives the group an operation to carry out.
  • Remark dismissed as absurd in a session: the facilitator treats it as a provocation instead of rejecting it.
  • Solution options to open up before a decision matrix: the harvest adds options that the analysis of the current state did not yield.
  • Steep hierarchy in the room: the "Po" marker spares whoever states an absurdity from defending it in front of management.
  • Analyst alone at an impasse: according to de Bono, one person alone works three to five times faster than a group.
  • Distributed team: a shared board is enough if every provocation carries the word "Po" and everyone works on the same one.

When not to use it

  • Question of fact or cause: provocation produces ideas but no diagnosis. Look for the cause with root cause analysis.
  • Known options to decide between: provocation chooses nothing. Compare the options with a decision matrix.

Description

The word "Po"

De Bono created the word "Po" to signal a provocation. He takes the syllable from words such as hypothesis, suppose, possible or poetry. He reads it as provocative operation. The word warns the audience that the statement that follows is a provocation and that its author does not have to defend it. Without this signal, the group criticises the crazy idea or demands that its author justify it. With it, the session goes straight to movement.

De Bono defines provocation by when the reason for a statement appears. In ordinary thinking, the reason comes before the statement. With a provocation, the reason may appear only after the statement. A hypothesis aims at the plausible and waits for proof. A provocation aims at the implausible. Nobody tries to prove it: it is a stepping stone to another idea.

Judgement and movement

Judgement compares an idea with the patterns of experience and rejects any idea that does not fit them. Faced with a provocation, it does its job by rejecting it. Movement asks another question: where does this statement lead? It sets aside whether the statement is true.

De Bono separates judgement and movement and allows no middle ground between them. He finds the brainstorming instruction to "suspend judgement" too weak: it tells the group what to avoid without telling it what to do. Movement is an active operation. People learn it and practise it.

In the Six Thinking Hats, de Bono places movement under the green hat. Judgement belongs to the black hat.

justified in hindsight
Problem: river pollution
Usual trackintake upstream, outflow downstream
Po: the factory is downstream of itself
Rejectedimpossible
Ideathe intake downstream of the outflow
provocation
judgement: is it true?
movement: where does it lead?
The case of the polluted river that de Bono describes. The usual track puts the factory's water intake upstream and its outflow downstream. The provocation "Po: the factory is downstream of itself" stands outside that track. Judgement asks whether the statement is true and rejects it. Movement asks where it leads and arrives at an idea: the water intake downstream of the outflow. The return to the original problem justifies the idea in hindsight.

How a session runs

De Bono divides a session into stages: the focus, the technique, then the output. The provocation occupies the technique stage. The output covers extracting the concepts, harvesting and treating the ideas.

  1. Set the focus. The facilitator names the subject on which the group wants new ideas. The facilitator states it in several ways and keeps one, then notes sub-focuses for later. If the group does not agree on the focus, the facilitator first sets it through problem shaping and reframing.
  2. Set up the provocation. The group chooses a method and writes the provocation with "Po" in front of it. In a group, each person proposes a provocation. The group keeps one and everyone works on it. The group can also set up several provocations in a row without using them. De Bono recommends this exercise to free up thinking on the focus.
  3. Apply movement. The group first tries the general attitude: it moves forward from the provocation and notes what comes up. If nothing comes up, it applies the movement techniques one by one. It does not have to use all of them.
  4. Move forward from objections. An objection often comes up during movement. The group does not voice it, because the debate would fall back into judgement. It looks for an idea that starts from the objection.
  5. Leave known ideas behind. When movement leads back to a known idea, the group takes another route. Linking a provocation to an existing idea adds nothing.
  6. Harvest. The facilitator works through the harvest checklist and notes each result in its category.
  7. Treat the ideas. The group shapes the selected ideas before any evaluation. Under the black hat, it lists the faults to fix. Evaluation comes next. The trap at this stage is rapid rejection: the group tests the idea against practical constraints before it has taken shape and drops it.
  8. Stop if nothing comes up. The group harvests what the session produced anyway. It accepts the failure and starts again later with another provocation or another technique.

De Bono gives indicative timings. One person alone spends three minutes on the focus, three on the technique and six on the output. A group works in thirty-minute modules: three minutes of focus, three of technique, then twenty-four of output. These twenty-four minutes break down into ten minutes to pool the ideas and concepts, ten to harvest and treat the ideas, then four for the deliverable. De Bono advises against using more than three lateral thinking techniques in one session.

Focus3 min
  • name the subject
  • state it in several ways
  • note sub-focuses
Technique3 min
  • choose a method
  • set up the provocation "Po: …"
  • apply movement
Output6 min alone · 24 min in a group
  • extract the concepts
  • harvest
  • treat the ideas
nothing new
resume later with another provocation or another technique
De Bono's indicative timings: 12 minutes alone, a 30-minute module in a group.
A session according to de Bono: the focus, the technique, then the output. The output goes through the harvest and the treatment of the ideas. When nothing new comes up, the group harvests and then resumes later with another provocation. The durations are de Bono's indicative timings: twelve minutes for one person alone, a thirty-minute module for a group.

Setting up a provocation

A remark heard in a meeting or read in a report becomes a provocation if the listener chooses to treat it that way. Its author does not need to have meant it as a provocation. De Bono also describes formal methods: the escape method and four stepping-stone methods.

MethodOperationDe Bono's example
EscapeState something taken for granted, then remove it."Po: restaurants do not have menus."
ReversalTake the usual direction and go the opposite way."Po: planes land upside down."
ExaggerationPush a measurable dimension far outside its usual range without going down to zero."Po: police have six eyes."
DistortionChange a usual relationship between the parts or the usual order of actions."Po: letters are sealed after they are posted."
Wishful thinkingState a fanciful wish in the form "Wouldn't it be nice if…"."Po: the factory is downstream of itself."
The methods for setting up a provocation, with one of de Bono's examples for each.

Escape starts from something taken for granted: a feature that is usually present in the situation. The group states it formally and precisely: "We take for granted that restaurants have menus". A problem, a complaint or a defect is never the thing taken for granted. Escaping from a defect provokes nothing.

De Bono distinguishes escape from reversal. "I do not have orange juice for breakfast" removes a habit: that is escape. Reversal turns the relationship around: "Po: the orange juice has me for breakfast".

Exaggeration works on a measurable dimension: number, frequency, duration, volume, price. Downwards it stops before zero, because zero leads back to escape. Wishful thinking asks for a fantasy. "Make this pencil for half the cost" is an ordinary objective to work towards. "Po: the pencil writes by itself" is a provocation.

De Bono asks for bold and mechanical provocations. An analyst who aims at an idea already in mind picks a provocation that provokes nothing. De Bono proposes a test: at least 40% of the provocations must remain unusable. If all of them work, either their author is exceptionally good at movement or the author built them around ideas already in hand.

The movement techniques

De Bono describes systematic techniques for getting movement. They overlap in part. The overlap does no harm: each technique serves only to move towards an idea.

TechniqueWhat the group doesQuestion
Extract a principleKeeps one feature of the provocation, sets the rest aside and builds an idea on that feature.Which feature do we keep?
Focus on the differenceCompares the provocation with current practice and examines each difference down to the smallest.How does it differ from what is done now?
Moment to momentImagines the provocation put into practice and watches what happens step by step without looking at the end result.What happens next?
Positive aspectsLists the direct benefits of the provocation, then looks for a workable path to the same benefit. De Bono considers it the simplest of the five. It belongs more to the yellow hat than to the green hat.What does it offer as it stands?
CircumstancesLooks for the situations in which the provocation would have direct value.In what situation would it be useful?
The movement techniques: what the group does and the question it asks.

In de Bono's example for the first technique, an advertising agency looks for a new medium. The provocation "Po: bring back the town crier" yields a feature: nobody can switch a town crier off. The idea that comes out of it: public telephones offer free calls broken up by advertising messages.

De Bono calls moment to moment "possibly the most powerful" of the techniques. With "Po: cars have square wheels", he imagines the wheel rising on its corner. The suspension could anticipate the rise and shorten. From this he draws the concept of a suspension that adapts to the terrain.

What movement produces

The group notes every result of movement.

  • A usable idea. Movement most often delivers the outline of an idea that still needs work.
  • A concept. The group notes it even without a practical way to apply it. For de Bono, a concept has the right to exist on its own.
  • A for-instance idea. It shows a concept in action without being workable yet. Faced with an unworkable idea, the group pulls back from the idea to the concept behind it.
  • An interesting point or a difference. The group senses that something is there without yet seeing any value in it. It notes it anyway.
  • A value. The group keeps it as a fixed point and looks for a simpler way to obtain it.
  • Nothing. The group harvests what came up and stops.

The harvest

According to de Bono, a session looks for the magic idea. It also produces ideas to shape and puts concepts aside for later. A careless harvest keeps only the magic idea. De Bono gives a checklist that the facilitator works through category by category.

CategoryWhat the facilitator notes
Specific ideaA concrete idea that the group can apply as it stands.
For-instance ideaAn idea recognised as unworkable that illustrates a valuable concept.
Seedling ideaThe beginning of an idea that shows promise but still needs a lot of work.
Direct conceptA concept that came up during the session. The facilitator notes it as a concept even if it led to an idea.
Pull-back conceptA concept drawn afterwards from an idea or from a for-instance idea.
DirectionA very broad concept about how to tackle the situation.
NeedA gap that the session brought to light. The facilitator writes it in the form "There is a need for a way to…".
New focusA subject to tackle in a later session.
ChangeA shift in the line of thinking. The facilitator notes it as "from… to…".
FlavourA single phrase for the overall tone of the session.
De Bono's harvest checklist: each category and what the facilitator notes under it.

The needs and the new focuses give the analyst the questions to take to the backlog or to the next workshop.

Common mistakes

Immediate judgement is the most frequent mistake. A participant objects that a factory cannot be in two places. The objection is correct and teaches the group nothing, since the provocation is impossible on purpose. The facilitator points to the "Po" and asks where the statement leads.

The forgotten marker produces the opposite mistake. A provocation stated without "Po" reads as a proposal. When a manager states it, it passes for a decision that the room fights or carries out.

An escape that closes a single route leads to the nearest alternative. "Po: nobody comes to work by car" leads straight to the bus or the train. The idea may be useful but has nothing original about it. De Bono draws other directions from the same provocation: working from home or driving out of town in the morning. The second would encourage employers to set up on the outskirts.

The provocation delivered as a result confuses the starting point with the destination. The harvest carries the ideas. The provocation appears in it only as their origin. A provocation sometimes has direct value in itself. De Bono cites the 1984 Olympic Games: the organisers reversed the mistrust of television and treated the Games as a television show. Such a provocation goes to judgement like any other idea.

Sorting during the harvest discards the concepts that do not yet have a practical path. The facilitator notes everything.

Persistence wears out a group that keeps pushing after a failure. De Bono finds it more useful to accept the failure and resume later. He does not promise an idea at every session. In his view, practice builds fluency in movement.

Boundaries with neighbouring techniques

Provocation differs from its neighbours in its starting point: a statement that is false on purpose.

TechniqueStarting pointRelation to provocation
Six Thinking HatsA subject to addressThe hats divide the discussion into modes of thinking. Movement is the operation of the green hat.
SCAMPERA real product or processSCAMPER applies a fixed list of questions to it. Reversal appears in both.
Vuja-deA familiar situationVuja-de changes how the group looks at a real process. Provocation states a false fact.
BrainstormingAn open questionBrainstorming suspends judgement. Movement gives the group an operation to carry out instead.
Creative thinkingA problem already statedProvocation is one of the instruments of creative thinking.
Random inputA word drawn at randomDe Bono classes it among the provocation techniques. The drawn word replaces the false statement.
The neighbouring techniques: their starting point and their relation to provocation.

AI considerations

A language model sets up provocations in batches. The facilitator gives it the focus and the list of things taken for granted, then asks it for several provocations per method. The 40% test applies to the list: if the group can use every provocation, they are too tame.

A model's provocations are often too reasonable. It proposes a numerical target instead of a fantasy. It delivers an escape when asked for a reversal. The facilitator classifies each provocation by its method and discards the disguised targets.

The model can also apply the movement techniques to a provocation and return a first draft per technique. It often adds reservations about feasibility. These reservations are judgement: the facilitator removes them or asks the model to leave them out. The model does not know the practical constraints: internal rules, the systems in place, what users accept. The group then treats these proposals as its own: harvest, treatment, evaluation.

A focus sometimes concerns a real case with the names of clients or employees. The facilitator entrusts this personal data only to an AI service that the organisation has authorised for this processing under the Federal Act on Data Protection (FADP).

Examples

The table follows one escape provocation through the five movement techniques. Each technique yields a result in a different category.

Movement techniqueWhat the group sawHarvestedCategory
Extract a principleFeature kept: the certificate exists before any request.The residents' registration office attaches a certificate to the arrival confirmation that each new resident receives.Specific idea
Focus on the differenceToday the resident takes the municipality's paper to the bank or to the employer. In the provocation, nobody takes anything anywhere.With the resident's consent, the organisation that needs the address checks it with the municipality.Direct concept
Moment to momentThe resident arrives at the bank without a certificate. The bank employee only wants to know whether the declared address is correct.The bank enters the declared address in a municipal service and receives "match" or "no match" without any other data.For-instance idea for the concept in row 2
Positive aspectsThe counter no longer issues certificates. Its staff handle arrivals and departures without a queue.There is a need for a way to free up counter time.Need
CircumstancesThe absence of a request would have direct value when the same organisation asks for the same certificate every year. A family allowance compensation fund is one such case.A certificate valid until the next move. The municipality declares it void when the resident registers the departure.Seedling idea
Illustrative case: the harvest of a provocation at a municipal residents' registration office. Focus: requests for certificates of residence. Taken for granted: the resident requests the certificate. Escape provocation: "Po: the resident never requests a certificate". The case and its ideas do not come from de Bono.

The provocation appears in no row of the harvest. The concept in row 2 enters the harvest without a workable path. The idea in row 3 shows it applied.

Visualisations

A diagram shows how the group gets from the usual track to a new idea: the provocation stands outside the track, judgement rejects it, movement draws from it an idea that the return to the problem justifies. The course of a session reads as a sequence of stages with an exit when nothing comes up. The methods, the movement techniques, the harvest categories, the harvest example and the neighbouring techniques fit into rows and columns.

Cost

PhaseLevelJustification
PreparationLowChoose the focus and list the things taken for granted. A facilitator who has never practised movement first trains on a few provocations, since de Bono describes movement as an operation that people learn.
ExecutionLowTwelve minutes for one person alone. A thirty-minute module for a group: 3 min of focus, 3 of technique, 24 of output (10 for pooling, 10 for harvesting and treatment, 4 for the deliverable). These are de Bono's indicative timings.
DocumentationLowOne harvest page: one row per result with its provocation, its technique and its category.

Tooling

A whiteboard and cards are enough. Each card carries the word "Po" in large letters, then the provocation. A card on the wall lists the movement techniques and their questions.

For escape, de Bono proposes two mechanical draws. Each participant writes something taken for granted on a slip, then the facilitator draws a slip from a bag. Each person can also draw up their own list of things taken for granted. The facilitator then calls out a number that each person applies to their list.

For a distributed team, Miro, Mural or Microsoft Whiteboard take over the board: one area for the provocations, one area per movement technique, one harvest area. A spreadsheet holds the harvest.

Sources

  • De Bono, E., Serious Creativity: Using the Power of Lateral Thinking to Create New Ideas, HarperBusiness, 1992. Pages 145-162 cover provocation, judgement, movement and the movement techniques with their results. Pages 163-176 cover the word "Po" and the methods for setting up a provocation. Page 177 covers random input. Pages 210-216 cover the harvest and the treatment of ideas. Pages 285-290 cover the stages and the duration of a session.

De Bono reports successes such as the water intake rule.

Prototyping
All techniques
Pugh Matrix