Process Classification Frameworks and Reference Models
A process reference model is a published breakdown of the processes of a typical organisation. A body or a consortium maintains it. It names each process, places it in a hierarchy and gives it a number. A process classification framework is its simplest form: a numbered hierarchical list that describes no sequence. APQC's PCF (Process Classification Framework) is a classification framework for any industry. SCOR, which ASCM publishes, is the reference model for the supply chain. The analyst starts from one of these models to build the organisation's process landscape. From the model the analyst derives a draft that management corrects. Each adopted element keeps its number, which links the organisation's processes to the model's comparison data.
Goal
The analyst derives the organisation's process landscape from a published reference model, then tailors it. The landscape classifies all the organisation's processes from the enterprise level down to the activities. The ABPMP's CBOK calls it the enterprise process model and treats it as the foundation of process management. According to the CBOK, most organisations benefit from classifying their processes from a reference model.
The landscape states which processes the organisation performs, what it calls them and where each one belongs. A published model brings a common vocabulary. The model is also a checklist: the team walks through its categories and checks that it has left out no part of the work. Two organisations that map their processes to the same numbers can compare their measures process by process.
The deliverable comprises the process landscape and a mapping table. The landscape shows the level-1 and level-2 processes. It separates the operating processes from the management and support processes. For each element the table gives its local name, its number in the model and the decision: keep, rename, remove or add.
The reference model classifies the work that the organisation performs. Business capability analysis classifies what it is able to do. In functional decomposition the team itself breaks a subject down into a hierarchy. Architecture frameworks such as TOGAF or Zachman organise all the models of an enterprise. Maturity models such as CMMI assess an organisation's ability to manage its processes.
Usage
When to use it
- First process landscape: start from a published model instead of inventing a structure.
- Benchmarking programme: map each process to a model number to compare its measures with those of other organisations.
- Merger or reorganisation: place the processes of two entities in one structure before comparing them.
- Document management: index procedures, directives and forms by process.
- Enterprise architecture: link each application to the processes it supports.
- ERP project or outsourcing: describe the scope of the affected processes in a vocabulary that the integrator or the provider knows.
- Canton or commune: classify tasks and services according to the national process map eCH-0145.
When not to use it
- A single process to improve: the model gives it only a name and a number; move on to process modelling and process analysis.
- Breaking down a system or a project: the model classifies the work of the enterprise; break the subject down into a hierarchy through functional decomposition.
Description
The structure of a classification framework
APQC's PCF shows the typical structure. APQC is a non-profit benchmarking organisation. It designed the PCF in 1992 with more than 80 organisations. Version 7.4 dates from August 2024. It contains 13 categories and more than 1'000 processes and activities. Categories 1.0 to 6.0 group the operating processes from vision and strategy to customer service. Categories 7.0 to 13.0 group the management and support processes: human capital, IT, finance, assets, risk and compliance, external relationships and business capabilities.
Each category breaks down into four further levels: process group, process, activity and task. Each element carries two numbers. The hierarchy number (6.3.4.1) places the element in the tree. The five-digit reference number (10320) identifies the element's definition and stays the same when its name changes. APQC assigns a new number when the definition changes in substance.
According to APQC, the depth varies from one branch to another. In category 6.0, group 6.3 goes down to level 5. Group 6.4 stops at level 3. A task in one branch does not necessarily demand the same effort as a task in another.
APQC publishes the PCF free of charge in PDF and in Excel. The Excel file adds the definition of each element and its measures. According to APQC, users take the PDF to win buy-in for the framework and the Excel file to build the landscape. The licence allows anyone to use, copy, publish and modify the PCF and to create derivative works from it. Every copy and every derivative work carries the attribution notice that APQC supplies. A landscape derived from the PCF therefore carries it too.
Choosing the starting model
The CBOK classifies models by scope: valid for any organisation, specific to an industry, to a process domain or to a technology. It places SCOR among the industry models. ASCM describes SCOR levels 0 to 3 as valid for the supply chain of any industry.
| Scope | Model | What it covers |
|---|---|---|
| Any industry | Cross-industry PCF (APQC) | Operating processes and management and support processes in 13 categories (version 7.4) |
| One industry | Industry PCFs (APQC) | The structure and numbers of the cross-industry PCF plus the detail specific to the industry |
| One industry | eTOM (TM Forum) | The processes of a telecommunications operator |
| One process domain | SCOR (ASCM) | The supply chain from planning to return |
| One process domain | ITIL | IT service management |
| One technology | SAP process structure | The process plan of an SAP ERP project |
| Swiss public administration | eCH-0145 (eCH association) | The tasks and services of cantons and communes on three levels |
APQC also publishes industry PCFs. They cover banking, insurance, health insurance, utilities and city government among others. They keep the structure and numbers of the cross-industry PCF and detail the branches specific to the industry. The aerospace and defence PCF has 16 processes under group 4.3. The cross-industry PCF has four. According to APQC, an industry PCF is often the better fit.
For cantons and communes, the eCH association publishes the national process map of Swiss public administration as the eCH-0145 standard. It classifies tasks and services. It sorts the tasks into three levels and three types: core tasks, management tasks and support tasks. Its structure follows the functional classification in the chart of accounts of the Harmonised Accounting Model 2 (HAM2). The map names the public tasks. Each administration maps its own processes to it.
The CBOK also cites the Value Chain Group's model under the acronym VRM. The Value Chain Group published it under the name VCOR (Value Chain Operations Reference). Its strategic level has three processes: plan, govern and execute.
The CBOK allows practitioners to take components from several models to build the structure that fits the enterprise. A distributor can take the PCF for the whole organisation and SCOR for its supply chain. SCOR details category 4.0 of the PCF (20022). Its Order process overlaps the PCF's customer order management (3.5.4, 10185). Its Return process overlaps returns processing (6.2.4, 20094). In practice, the mapping table assigns each overlap to a single model.
SCOR for the supply chain
The Supply Chain Council created SCOR (Supply Chain Operations Reference) in 1996. In 2014 it merged with APICS, which later took the name ASCM. Earlier versions were organised around Plan, Source, Make, Deliver, Return and Enable. Version 14.0 (2022) places Orchestrate at level 0. Level 1 holds Plan, Order, Source, Transform, Fulfill and Return. Deliver split into Order and Fulfill. Make became Transform.
ASCM defines levels 0 to 3 in the standard. Each organisation extends the model with its own processes, systems and practices down to level 4 at least. SCOR describes processes rather than functions: it names the activity without saying which department performs it. Level-2 diagrams show the structural defects of the chain. Level-3 diagrams show the decision points, the triggers and the breaks between processes. At level 3, SCOR describes steps that run in a given order. A reference model such as SCOR therefore fixes a sequence. A classification framework such as the PCF fixes none.
Building the landscape from the model
- State the purpose. APQC describes the uses of the PCF: defining and managing processes, benchmarking performance, organising documentation, linking processes and applications in enterprise architecture. The purpose sets the depth and decides whether the reference numbers matter. Benchmarking requires all of them. A landscape used to name process owners needs only levels 1 and 2.
- Choose the model. Select the model that covers the work under study. Compare the industry PCF with the cross-industry PCF. Add a domain model where it details part of the work.
- Settle on one version. APQC advises a first-time user to take the current version. The version number has three parts: the generation, the maturity within the generation and the number of fixes. In practice, the mapping table carries the version number of the model.
- Build the draft. According to the CBOK, the team derives a draft landscape (straw model) from one or more models. Adopt levels 1 and 2 of the model. In practice, go down to level 3 only where a project needs it.
- Tailor element by element. The team keeps, renames or removes each element of the model. It adds the elements that are missing. APQC allows renaming to match the organisation's usage and recommends keeping the reference number. An added element has no reference number. In practice, a faithful translation of the English name keeps the element. A rename introduces a local term that the PCF name does not give. An element whose definition changes is no longer the same element: the team removes it and adds a new one.
- Have management validate it. According to the CBOK, management validates or modifies the draft (§3.5.1.1). The CBOK also describes the reverse path: management first describes the enterprise from its own point of view. The team then compares the result with the published models. In practice, the draft suits a management team with little time. The reverse path suits a management team with a settled view of its processes, for example after a reorganisation.
- Link to the organisation. According to the CBOK, the organisation divides work among its units at the activity level (§9.1.3). In practice, the team records for each level-2 process the units that perform its activities. Each level-1 or level-2 process receives a named owner.
- Use the landscape. File procedures and directives by element. Link each application to the processes it supports: APQC cites the question "which system does this process depend on?" Compare measures with those of other organisations through the reference number.
- Keep the landscape current. APQC advises moving to a new version only when it brings an element that the organisation needs. In practice, the team reviews the mapping table whenever a new version of the source model appears.
Pitfalls
Reading the list as a flow. According to APQC, the numbering says nothing about the order of execution. The PCF replaces neither a process map nor a swimlane diagram. The team uses it to build them. A team that links 6.1 to 6.2 with an arrow invents a sequence. Process modelling draws the flow, for example in BPMN.
Renaming without keeping the number. The local name alone cuts the link to the benchmarking data and to the next version of the model. In a bilingual organisation, the number also links the French label to the German label of the same process.
Adopting everything. An element that nobody performs leaves a box without an owner on the map. The team removes it.
Copying the organisation chart. APQC presents the PCF as a taxonomy of cross-functional business processes. A team that names its categories after its departments rebuilds the organisation chart with PCF numbers. A process that crosses three departments ends up cut in three. The link to the benchmarking data breaks. The team names the work first. It then attaches the units at the activity level.
Believing the levels are universal. According to the CBOK, the number and the names of the levels change from one enterprise to another. No standard fixes them (§9.1.3). The PCF has five levels. SCOR defines levels 0 to 3 and leaves level 4 to the organisation. The eCH-0145 standard has three. Level 3 denotes a process in the PCF and a process step in SCOR. When the team combines two models, the mapping table states the model and the level of each element.
Taking SCOR for an enterprise model. SCOR excludes sales and marketing, product development and research. A landscape built on SCOR alone leaves these processes out of scope. The PCF covers them.
Citing a number without its version. A number recorded without its version does not always exist in the next version.
AI considerations
A language model speeds up the mapping of an existing inventory to the reference model. The analyst gives it the PCF Excel file and the list of processes from the quality manual or the intranet. For each local process the language model proposes the closest PCF element and its reference number. The analyst checks each number in the file. A language model that answers from memory mixes PCF versions and produces plausible numbers that do not exist.
The same tool translates the labels into German or Italian without touching the numbers. It also classifies a batch of procedures by model element. It decides neither which elements to remove or add nor which name management will recognise: the workshop and the validation settle these choices. The mapping does not need the owners' names. The analyst removes them from the list before sending it to an external AI service.
Examples
A Vaud vendor of online payroll software tailors the cross-industry PCF 7.4. It sells a service and ships no physical product. Its level-1 landscape keeps the reference number of every kept or renamed category.
The mapping table goes down to level 2 in category 6.0.
| Hierarchy no. | Reference no. | PCF 7.4 element | Decision | Local name |
|---|---|---|---|---|
| 6.1 | 10378 | Develop customer service strategy | Keep | Develop customer service strategy |
| 6.2 | 10379 | Plan and manage customer service contacts | Rename | Manage user support |
| 6.3 | 12658 | Service products after sales | Remove | |
| 6.4 | 20110 | Manage product recalls and regulatory audits | Remove | |
| 6.5 | 20595 | Evaluate customer service operations and customer satisfaction | Keep | Evaluate customer service operations and customer satisfaction |
| 6.6 (local) | none | Add | Train new customers on the software |
The vendor keeps group 6.1 under its PCF name. Group 6.2 changes its name and keeps the number 10379: its measures stay comparable with those of other PCF users. Training new customers has no counterpart in the PCF. No external data attaches to it.
Visualisations
The level-1 landscape follows the layout of the PCF. The operating processes form a row of boxes. The management and support processes stack in bars below. A tree or an indented list shows the levels of a category with their two numbers. The mapping table has one row per element.
Cost
| Phase | Level | Justification |
|---|---|---|
| Preparation | Medium | Choice of the model and its version; inventory of the existing processes and procedures. |
| Execution | Medium | Draft of levels 1 and 2, then validation by management in two or three workshops. High if the team goes down to level 3 across the whole organisation. |
| Documentation | Medium | Upkeep of the mapping table with each new version of the model and after each reorganisation. |
Tooling
A spreadsheet is enough for the mapping table. The PCF Excel file supplies the numbers, the definitions and the measures. Process management tools such as ARIS, ADONIS or SAP Signavio hold the landscape in levels. They link each element to its BPMN models, its owner and the applications. According to the CBOK, some vendors ship reference models with their modelling environment (§3.8.2). SCOR is available online on the ASCM website. For the validation workshop, a poster of the level-1 landscape and one card per process group are enough.
Sources
- ABPMP, Guide to the Business Process Management Common Body of Knowledge (BPM CBOK), version 3.0: §9.1.4 for the scope of reference models, their use as a starting point and their combination; §9.1.3 for the levels without a standard and the division of work among units at the activity level; §3.8 for architecture frameworks and reference models; §3.5.1.1 for the draft that management validates and the reverse path.
- APQC, APQC's Process Classification Framework (PCF), Cross-Industry, version 7.4, August 2024: the 13 categories, the reference numbers, the new-number rule and the licence. The licence requires this attribution notice: "APQC's Process Classification Framework® (PCF) is an open standard developed by APQC, a nonprofit that promotes benchmarking and best practices worldwide. The PCF is intended to facilitate organizational improvement through process management and benchmarking, regardless of industry, size, or geography. To download the full PCF or industry-specific versions of the PCF, as well as associated measures and benchmarking, please visit www.apqc.org/pcf."
- APQC, Introduction to APQC's Process Classification Framework (2018): the five levels, the uneven depth, the uses and the formats.
- APQC, Understanding the Elements of APQC's Process Classification Framework (2018): the numbering without order, renaming with the number kept, the industry PCFs and the versions.
- ASCM, SCOR Digital Standard, version 14.0, Introduction and Front Matter (2022): the processes of level 0 and level 1, the levels, the scope and the changes in version 14.
- ASCM, SCOR Digital Standard, Introduction (2020): the processes of the earlier versions and the use of level-2 and level-3 diagrams.
- Yacine Ouzrout, Matteo M. Savino, Abdelaziz Bouras and Carlo Di Domenico, Supply Chain Management analysis: a simulation approach of the Value Chain Operations Reference model (VCOR), International Journal of Value Chain Management 3(3), 2009, pp. 263-287: the name VCOR and the three processes of the strategic level.
- Association eCH, eCH-0145 Carte nationale des processus de l'administration publique suisse, version 1.1, 2014: the classification structure of public tasks and services, the three types of task and the link with HAM2.

