Your Training Partner
Techniques Toolbox
The Positive Gossip sequence on a 15-minute axis. The facilitator reads the invitation for 1 minute. Three rounds of 3 minutes follow. In each round, participants form a new pair and each person speaks for 1 minute. In the first round, each person talks about a mentor or someone who supported them. That person is not in the room. In the second round, each person talks about someone in the group who is not in their pair. In the last round, each person talks about their partner. The group then meets in plenary for 5 minutes.

Positive Gossip

Positive Gossip is a meeting structure from the Liberating Structures repertoire. Participants form three pairs in succession. In each round, each person spends one minute saying good things about someone: a mentor in the first round, someone in the group in the second, their partner in the last. In plenary, the group then says how it felt and where it could use the practice again. According to the Liberating Structures site, the structure starts to turn around a habit of negative gossip. The site gives it about 15 minutes and a minimum of twelve participants.

Goal

In Positive Gossip, participants pair up and say good things about another person. They change partners in each round.

Gossip is what people say about someone who is not there. The structure keeps the form of gossip and changes its content: participants say only good things. In the last round, each person talks about their partner. The gossip then becomes direct feedback.

The authors link the structure to the principle "Engage in Seriously Playful Curiosity". They credit it with a climate of appreciation that improves performance and teamwork.

The session produces positive feedback. In plenary, a few participants name other occasions to practise. The structure settles nothing and leaves no written record.

You will find the other structures under Liberating Structures.

Usage

When to use it

  • Closing a meeting or workshop: the site suggests the structure to help people reflect on their progress and show appreciation.
  • A celebration or the launch of a phase in a team that has already worked together: the site suggests the structure to inspire good cheer.
  • A team where criticism circulates behind people's backs: the site presents the structure as a first step to turn this habit around.
  • The last session of a series of elicitation workshops: in our view, each stakeholder hears what the others took from their contribution.
  • The end of a retrospective: in our view, the team acknowledges everyone's work in a quarter of an hour and closes the retrospective.
  • A remote team: the site describes an online version with breakout rooms of two.

When not to use it

  • Open conflict or an unresolved grievance: prescribed praise sounds like denial. A trained mediator deals with the conflict first.
  • A group that has not yet worked together: in the second and last rounds, participants have nothing to say about the others. Use Impromptu Networking instead.

Description

The elements of the structure

The site describes each structure through its design elements: the invitation, space and materials, participation distribution, group configuration and the steps with their time allocation.

The facilitator opens the activity with the invitation: "In this activity we are going to ditch negativity and practice giving and getting positive feedback. Positive Gossip is like regular gossip, but way more fun and uplifting!"

Participants stand in pairs in an open space, then come together as a whole group. Online, each pair joins a breakout room. The roles are the facilitator and the participants. Online, a tech host joins them. The site gives no reason for its minimum of twelve participants. Everyone is included and has an equal opportunity to contribute.

The sequence

  1. The facilitator reads the invitation and says that the instructions will come one round at a time. 1 min.
  2. First round. Participants form pairs. Each person spends one minute saying good things about a mentor or someone who has supported them in their life. The facilitator signals the role switch. 3 min.
  3. Second round. Participants form new pairs. Each person spends one minute saying something positive about someone in the group. 3 min.
  4. Last round. Participants form new pairs. Each person spends one minute saying something positive about their partner. 3 min.
  5. Plenary sharing. The whole group comes back together. A few participants answer out loud the questions "How did it feel to go through the rounds?", "Now that we've practiced Positive Gossip, where else could we use this in our lives?" and "What good could it bring to life?". 5 min.
  1. Introduction1 min
  2. First round3 min1 min eachA mentor or supporter
  3. Second round3 min1 min eachSomeone in the group
  4. Last round3 min1 min eachThe partner
  5. Plenary sharing5 minHow it felt and other uses
  • The room
  • Facilitator
  • The same participant in every round
  • Person being talked about
The Positive Gossip sequence according to the current page of the site. Participants form a new pair in each round. In the last round, each person talks about their partner.

In each round, the two partners speak for one minute each. That fills two of the three minutes. The site does not explain the third. The archived version gives 2 minutes to form the last pair before the facilitator gives the last round's prompt. In our view, the partners use the third minute to form the pair and switch roles.

The order of the rounds

In the first round, the person spoken about is outside the room. In the second round, that person is in the room but outside the pair. In the last round, that person is listening. The site does not comment on this order. In our view, the order asks more of the participants from one round to the next. In the last round, the speaker needs confidence to praise the person opposite. The listener needs it to receive the praise.

Face to face, the facilitator gives each prompt once the pairs have formed. In our view, nobody then picks a partner to suit the prompt. In the last round, nobody picks the partner they hope will praise them.

The tone

The facilitator encourages exaggeration and lightheartedness. Both mimic the way negative gossip spreads. A participant might say, for example: "Did you see Nancy come to the rescue again and again!" The facilitator can expect an outpouring of emotion and laughter.

Online

The facilitator posts the prompt for each round in the chat before sending participants to breakout rooms. The facilitator announces the role switch with a message broadcast to all rooms. In a large group, the tech host struggles to give everyone a new partner in each round. The tech host can preset the rooms after the first round. In plenary, participants answer out loud or in the chat.

Facial expressions, body language, subtle gestures and tone of voice matter in these exchanges. Online, these signals are easy to miss.

What makes Positive Gossip fail

In the second round, a participant whom nobody names receives nothing. The last round partly makes up for this: every person in it hears their partner speak about them. So the facilitator does not ask in plenary who was named.

In our view, the praise in the second round drifts towards the most visible person in the room. That person is often the team lead or the sponsor. Praise of a superior sounds like flattery. Peers whose work rarely shows receive nothing. The facilitator words the prompt to aim at a peer's contribution: "someone whose work rarely shows".

When pairing is free, friends pair up again. The facilitator asks each person to join someone they have not yet spoken to in each round. In a narrow room, the facilitator lines up two rows face to face. One row moves along one place in each round.

Ironic praise ("Well done on your legendary punctuality") turns back into mockery. The facilitator asks for praise that is exaggerated and sincere.

Praise that compares hurts a third person: "She works better than the rest of the team." The facilitator asks participants to say what the person did. The prompt in the archived version targets the person's behaviour or contributions.

A single session rarely breaks an entrenched habit. The site's subtitle promises only a start. The archived version advises repeating the exercise in the group until the new habit takes hold.

Variants

In one variant on the site, participants say good things about a person who is often the target of negative gossip. In our view, the facilitator keeps this variant for a person who is absent or who has agreed to it. If that person is present without having agreed, the exercise marks them out as a target in front of the group.

In another, the facilitator changes the prompts, for example by inviting each person to tell what they themselves contributed recently.

The two published versions

The authors' former site keeps a version 1.4 labelled Liberating Structure in Development.

PointReference procedureVersion 1.4 (archived)
Group sizeAt least twelve participantsUnlimited. Example use: closing a meeting of ten people or more
Subjects of the roundsA mentor, someone in the group, the partnerSomeone in the group, a mentor, the partner. A variant swaps the first two
Number of roundsThreeThree. More depending on group size
Role switchThe facilitator signals itA bell marks it
Closing5-min plenary on how it felt and on other usesGroups of four for 5 min with What? So What? Now What?
Positive Gossip: the reference procedure and the archived version 1.4.

Only the archived version asks the facilitator to keep the rounds short.

Neighbouring structures

Impromptu Networking also rotates participants in pairs over three rounds. There, each person talks about their own challenge. In Appreciative Interviews, each person tells the story of a success they were part of. In Positive Gossip, each person talks about someone else.

Positive Gossip in a string

The site suggests stringing Positive Gossip with What I Need From You or Generative Relationships STAR. In What I Need From You, groups from different functions address their requests to each other. In Generative Relationships STAR, the team assesses its working relationships. What, So What, Now What? then draws lessons from what participants discovered.

AI considerations

The praise in the rounds comes from the participants. Praise drafted by a model loses what makes it credible: someone in the group noticed what the other person did.

Before the session, a model can reword the prompts for that day's meeting. The facilitator checks that each prompt keeps its subject. The facilitator discards any prompt that invites comparison or ranking. For a bilingual group, the model translates the invitation and the prompts. The facilitator checks that the translation keeps the light tone of the original.

Online, the chat keeps the plenary answers and sometimes praise of named people. These are personal data within the meaning of the Federal Act on Data Protection (FADP, art. 5 let. a). The FADP governs companies and the federal administration. A cantonal administration applies the law of its canton. After the session, the facilitator can hand these answers to a model. The facilitator removes the names before passing on the answers. The model groups the occasions to use the practice again into a short list that the team keeps.

Examples

A facilitation plan adapts the prompts to the session and keeps the order of subjects.

StepDurationOriginal promptAdapted prompt
Introduction1 minThe invitationThe invitation, then: "I will give the prompt for each round once the pairs have formed."
First round3 minShare positive gossip about a mentor or supporter in your lifeUnchanged
Second round3 minShare something positive about someone in the group"Tell your partner what someone in this group contributed to the workshops."
Last round3 minShare something positive about your partner"Tell your partner what they contributed to the workshops."
Plenary5 minHow it felt, where else to use the practice and what good it could bring"How did it feel to go through the rounds?" "In which project sessions should we use this practice again?"
Constructed case. The facilitation plan for the last session of a series of elicitation workshops on a municipality's online counter. Sixteen people take part. The column "Original prompt" gives the prompts from the site.

The prompts for the second and last rounds steer the praise towards the contribution to the workshops. The site's variant allows this change. The first round keeps the original prompt. Each person first praises a mentor. This easy praise comes before the praise of colleagues.

Visualisations

A diagram shows the sequence: the durations, the new pair in each round and the person spoken about. The two published versions and the facilitation plan fit into rows and columns.

Cost

PhaseLevelJustification
PreparationLowClear a space where the pairs can stand. Prepare one slide per prompt.
ExecutionLow15 minutes. The facilitator times the rounds and signals when it is time to switch roles. In our view, the facilitator watches the tone above all.
DocumentationLowThe site asks for no record. Online, the chat keeps the plenary answers.

Tooling

Face to face, an open space is enough. The archived version recommends a bell to mark the role switch. A visible timer does the same job. One slide per round shows the prompt once the pairs have formed.

Remotely, Zoom or Microsoft Teams split participants into rooms of two. The chat carries the prompts and the plenary answers.

Sources

According to the site, the Strozzi Institute for Somatics inspired the structure through Tracy Rekart. Neil McCarthy and Keith McCandless adapted it.

Portfolio Kanban
All techniques
Prioritization