Your Training Partner
Techniques Toolbox
Plan view of an Open Space. On the left, a circle of chairs surrounds an empty centre that holds the theme. On the right, the agenda wall forms a grid: the columns are the times and the rows the places. Sheets signed by their conveners sit in the cells. Arrows lead from the circle to the wall: the participants post their sessions there and sign up for them.

Open Space Technology

Open Space Technology is a meeting method in which the group builds its own agenda around a theme. Participants who care about a question post it on a blank wall with a time and a place. They then convene the session they proposed. Each person chooses their sessions and moves on when they neither learn nor contribute: this is the Law of Two Feet. Harrison Owen invented the method. He plans an event lasting between five hours and three days. In The Surprising Power of Liberating Structures (2013), Henri Lipmanowicz and Keith McCandless describe a short form of 90 minutes.

Goal

Open Space Technology puts a large group to work on a complex problem. The group sets its agenda during the meeting. According to Owen, the method fits when the group must learn, innovate or break with the norm. It also fits when the group is unsure where it stands or where it is going.

According to the Liberating Structures book, participants who have built the agenda and chosen their sessions quickly take responsibility for the problems and act on them. The sponsor and the facilitator hand the agenda and the division of work over to them. The book gives the structure these purposes: spark action and share leadership, tackle a stuck problem or conflict through self-organisation, get every question that matters to the participants posted and addressed, let each person take charge of what they care about.

The method leaves the group the agenda wall and the session reports. The wall shows each proposed session with its convener, its time, its place and its sign-ups. The conveners write the reports during the event. The reports make up a document that the group receives before leaving. At the closing, the participants add their commitments to it.

In these deliverables, the business analyst reads the stakeholders' concerns. Each posted sheet names a question that matters enough to one person for them to convene a session on it. The signatures show how much interest it draws. The reports feed a first round of elicitation. A workshop follows the agenda its facilitator prepared. Open Space leaves that choice to the group. You will find the full repertoire under Liberating Structures.

Usage

When to use it

  • A complex problem with no known solution: Owen reserves the method for situations that call for learning or innovation.
  • The start of a transformation: all staff propose and lead projects from the first session.
  • A merger of two organisations: the book suggests bringing together all the employees of both companies to decide the next steps.
  • A stuck problem or conflict: the book relies on self-organisation to break the deadlock.
  • A network without a common hierarchy: in the meeting, partner organisations find the projects they will run together.
  • A large group: Owen reports 400 participants. The book goes up to about two thousand.
  • An inventory of concerns before elicitation: each stakeholder posts the question that matters to them.
  • A leadership retreat: in the book, Open Space fills the morning when the group moves into action.

When not to use it

  • A fully known path (rolling out known software, an established procedure): Owen advises training the users and running the plan.
  • A sponsor attached to their agenda or their results: according to Owen, the process aborts. Run a workshop with a prepared agenda instead.

Description

The starting conditions

Owen asks for little preparation: a clear and compelling theme, an interested and committed group, a time, a place and a facilitator. In his view, a detailed agenda, a plan and documents prepared in advance usually do harm.

The theme steers the whole meeting. Owen compares it to the first paragraph of a story. It is precise enough to point the way and open enough to let the group imagine the rest. Peggy Holman has practised the method since 1993. Her opening script gives a theme in question form: "How do we create the community we really want?" In that script, the facilitator also names the sponsor's constraints and what the sponsor commits to support. The participants then know which proposals can succeed.

The sponsor invites people on a voluntary basis and describes the format in the invitation. Owen warns that imposed or ill-informed participation can turn destructive. For the people the sponsor wants to involve and who hesitate, Owen suggests two events in succession. Word of mouth from the first draws the hesitant to the second. Otherwise, the sponsor respects their choice.

Owen requires one unbroken block of time: the participants arrive at the start and stay until the end.

The room and the wall

The group sits in a circle on movable chairs. Tables get in the way. The centre of the circle stays empty. Owen sees in it the open space that gives the method its name.

The agenda is a large blank wall. It has no windows, doors or drapes. The sheets stick to it with masking tape. It is long enough for the whole group to stand before it in three or four rows at most. The facilitator posts the list of available places before the conveners choose a time and a place.

The book calls for microphones above 40 participants. Its blank agenda sits on easels, flip charts, a long roll of paper or a whiteboard. The facilitator prepares enough parallel session slots for what the group will propose. The number of places multiplied by the number of rounds gives the slots. According to the book, about three participants in ten post a session, that is 15 sessions for 50 participants. For 30 participants and 2 rounds, the facilitator therefore plans 5 places. If the topics exceed the slots, the conveners add a place or a time on their sheet.

Post a topic
Sign up
Round 1
Round 2
Room A
Room B
Room C
Title, convener, signatures
The group sits in a circle around an empty centre that holds the theme. The participants who propose a session post it on the wall with a time and a place. Then everyone signs up for the sessions that interest them.

Owen and Liberating Structures

The book describes each structure through five design elements and refers to Owen's guide for the rest. The two sources differ on group size, duration, the marketplace, the wording of the law and the reports.

ElementOwen (Brief User's Guide)Liberating Structures (2013)
Group sizeAbout twenty at the minimum. Below that, diversity is missing. 400 participants work very well10 to 1'000 people in the room. Up to about two thousand
DurationFive hours at the minimum, which is a little tight. Eight hours to examine a topic. Two to three days for firm conclusions90 minutes in the short form. Up to three days in the long form
MarketplaceThe sign-ups that follow the posting of all the topicsThe posting of the topics with a time and a place
Law of Two FeetEach participant alone carries the responsibility for success. Whoever cannot contribute where they are goes where they canEach person goes to the session of their choice and leaves it if they neither learn nor contribute there
ReportsEach convener writes up their results. The reports are printed and posted as they come inA single document that is completed and distributed during the meeting
Open Space Technology according to Owen's guide and according to the Liberating Structures book.

How the event runs

Owen divides the event into the opening, the agenda setting, the sessions and the closing. The book gives the timing.

StepShort form (90 min)Long form (up to 3 days)
The facilitator presents the method, its mechanics, the four principles and the Law of Two Feet5 min20 to 45 min
Marketplace (in the book's sense): the participants post their topics with a time and a place15 min20 to 30 min
Sessions run by their conveners. The groups write recommendations and action plans2 rounds of 30 min or 1 round of 60 minSeveral rounds of 60 to 90 min
Debrief, distribution of the reports and closing10 min60 min per day
The timing of the short and long forms of Open Space Technology according to the Liberating Structures book.

The group builds the agenda by posting the topics, giving them a time and a place, then signing up for them.

  1. Opening. The facilitator steps into the centre of the circle, states the theme and points to the blank wall: "That is our agenda." Owen advises a pause. The rising nervousness is energy the group can use. The facilitator resumes before a discussion about the process gets going. The facilitator explains that the participants will post their topics on the wall and then sign up for sessions at the marketplace. Next, the facilitator presents the principles and the law and posts them on a large sheet. The book asks the facilitator to present them in a tone that is both serious and playful.
  2. Posting topics. Each person who cares about a question writes a short title and signs it. They stand up, read the title to the group and stick the sheet on the wall. In doing so they commit to convening the session and writing up its results. The facilitator allows no discussion of topics at this stage. According to Owen, whoever does not find their topic on the wall has only one person to complain to: themselves.
  3. Times and places. Each convener writes the time and place of their session on the sheet. They put the sheet on the left of the wall for an early slot and on the right for a late one. Places are first come, first served.
  4. Marketplace. Everyone stands up and signs as many sessions as they wish. The participants settle schedule clashes by negotiating with the conveners. Two conveners merge their sessions or one of them changes time. Otherwise, the participant chooses.
  5. Sessions. The conveners gather their groups. In each session, the convener or a volunteer takes notes in the report template. Each group writes its recommendations and action plans. A session stops as soon as it has produced its result. According to Holman, a session that runs over moves elsewhere if another session is scheduled in the same room. The facilitator leaves the room for a while, for example for a coffee. According to Owen, this departure shows that everyone now carries the responsibility for what happens.
  6. Closing. The group meets in a circle with no head table. Anyone who wishes says what mattered to them and what they propose to do. In a very large group, two or three volunteers speak.

In an event longer than one day, the facilitator opens each morning with announcements that stick to the facts. Each evening, the participants meet for what Owen calls the Evening News and recount what happened without a formal report. A party fills the last evening. The book suggests reopening the marketplace each morning so that larger collaborations can form.

The four principles and the Law of Two Feet

Owen's four principles and his law guide the facilitator and the participants alike.

PrincipleWhat it tells the participant
"Whoever comes is the right people."Each person works with the people who came instead of regretting those who stayed away. The facilitator invites the indispensable people before the meeting
"Whatever happens is the only thing that could have."With this theme and these people, this is the result. Whoever arrives with a precise list of expected results misses what happens
"Whenever it starts is the right time."An idea is born when it is ready. The event has a start and an end. In between, each session runs its course
"When it is over, it is over."A session that has produced its result stops even before the scheduled time
The four principles of Open Space Technology according to Owen and what each one tells the participant.

According to Owen, each participant alone carries the responsibility for success. Whoever cannot contribute where they are goes where they can. They leave without hostility: they take leave of the group, wish it well and go and do something useful.

Holman's script names the kinds of participant that the law produces. Bumblebees move from one session to another and carry ideas between them. Butterflies join no session. They stay in the cafeteria, where a conversation with them sometimes helps a participant put into words an idea that the participant then carries into a group. Owen and Holman note another effect of the law: whoever monopolises the floor sees their group leave. Holman adds a fifth principle: "Wherever it happens is the right place." Owen counts four.

The Law of Two Feet during a round of sessions. A participant who neither learns nor contributes leaves their session. The bumblebee moves from one session to another with its ideas. The butterfly stays in the cafeteria. A conversation with it there sparks an idea that a participant carries into a group. The bumblebee and the butterfly come from Peggy Holman's script.

The facilitator's role

Owen calls this role leader. In his guide, the facilitator handles only the time, the place and the theme. For the rest, Owen asks the facilitator to "set the direction, define and honor the space, and let go". The facilitator trusts the group.

During the sessions, the facilitator stays in the background and looks after the main room and the wall: re-sticking fallen sheets and collecting the cups. Owen compares this room to a control centre where everyone drops by to see how the sessions are going. To a lost participant who asks what to do, the facilitator answers with a question: "What would you like to do?" Faced with someone who wants to impose their idea on everyone, the facilitator reminds the group of the Law of Two Feet instead of contradicting the person.

According to the book, a facilitator who catches themselves judging what is right or imagining how to help drops the thought: "do one less thing". Owen advises a novice facilitator to rehearse with friends and colleagues who volunteer as guinea pigs. If the exercise is no fun for the novice, the novice gives up on the event. Perhaps they should never run an Open Space. Perhaps they need more practice.

The reports

Owen finds formal report-backs in plenary boring and unproductive. Each convener types the group's results into a word processor during the event. A small team prints each report and posts it as soon as the convener has entered it. In one of his examples, 200 participants produced 65 reports, that is 200 pages available at departure time.

Holman's script explains at the opening how the reports will be produced. The analyst prepares a short template with the facilitator: session, convener, participants, points discussed, recommendations, next steps and the owner of each step. The conveners then know what they will have to hand in. During elicitation, each recommendation becomes a requirement to refine, a risk to assess or an action to track. In Alison Joslyn's case, more than 70 projects come out of an Open Space. Seventeen get formal support. Six months later, ten remain within the Min Specs. The analyst therefore sorts the results with Min Specs or 25/10 Crowd Sourcing before drawing a backlog from them.

Stringing Open Space with other structures

Context in the bookLinked structuresWhat the book says about them
Open Space entryBefore: Celebrity Interview, Appreciative Interviews or Creative Destruction (TRIZ in the book). After: 25/10 Crowd Sourcing
Chapter 6Open Space, then Min Specs, then 25/10 Crowd SourcingA typical string for unleashing local action
Leadership retreat (chapter 7)The day before: Ecocycle, 25/10 Crowd Sourcing and What I Need From You. Afterwards: Critical Uncertainties and What, So What, Now What?Open Space focuses the group on the progress of each strategy
Summit of 400 people (chapter 7)In the morning: Celebrity Interview, Nine Whys, Creative Destruction and Appreciative Interviews. The next day: 25/10 Crowd SourcingEach region decides what it stops and what it starts
Alison Joslyn's caseMin Specs after an Open Space with 250 employeesMore than 70 projects launched. 17 get formal support. 10 stay within the Min Specs for six months
The structures that the Liberating Structures book links to Open Space Technology.

The book counts unconferences and BarCamps among the other forms of Open Space.

What makes an Open Space fail

A theme that lists objectives gives nobody a reason to post a topic. The wall stays almost empty. In the book's view, a problem that mobilises people and an attractive invitation come first.

The sponsor sticks a list of topics "to cover" on the wall before the opening. According to Owen, any attempt to impose an agenda or an outcome aborts the process.

The facilitator slips a talk in between two rounds or admits drop-in participants. According to Owen, the method fails once it is interrupted. A talk comes before the opening or after the closing.

The facilitator assigns participants to sessions or asks them to stay where they signed up. In doing so, the facilitator abolishes the Law of Two Feet. The book holds that a meeting without this law is not Open Space.

The facilitator merges two similar sessions on their own authority. Holman advises keeping them separate. Each participant gets more speaking time in them. The two conveners often have different things in mind. The conveners alone decide whether to merge.

Nobody writes during the sessions. The recommendations stay on flip charts. The group leaves with no record of what it decided.

AI considerations

Before the meeting, a language model helps the sponsor word the theme. It proposes several versions in question form. The sponsor keeps the one that points the way without closing off what follows. The model does not propose session topics. The blank wall is the principle of the method. A suggested list would become the agenda.

During the event, voice dictation or a photo of a flip chart speeds up report writing. The convener rereads and corrects the text before posting it. A model formats the reports to the common template. In a bilingual organisation, it translates them between French and German. Everyone then reads the other groups' reports before the closing.

After the event, the analyst has a model group the recommendations by theme and flag duplicates across sessions. The analyst checks each grouping against the original report. An automatic summary tends to erase the sessions that few people attended. The analyst keeps every session in the synthesis, whatever its attendance.

The reports name people and record what they said. Information that relates to an identified or identifiable natural person is personal data within the meaning of the Federal Act on Data Protection (FADP, Art. 5 let. a). The sponsor chooses a tool that the organisation authorises and announces its use at the opening.

Examples

After the sign-ups, the agenda wall shows who convenes which session, where and when.

PlaceRound 1 (10:20 to 10:50)Round 2 (10:50 to 11:20)
Room A"What do we ask the policyholder that they do not know?"
Claims handler
7 signatures
"Should we keep the paper form?"
Claims handler
3 signatures
Room B"Why does a simple claim wait ten days?"
Claims team leader
9 signatures
"Turnaround times: what can we promise the policyholder?"
Head of customer service
8 signatures
Room C"Which claims can customer service close on its own?"
Customer service adviser
5 signatures
"Turnaround times: what do we measure today?"
Business analyst
6 signatures
Cafeteria"What do we do with the photos that policyholders send by email?"
Developer
4 signatures
"Who is waiting for the loss adjuster's report and when?"
Loss adjuster
5 signatures
TerraceFree"Which anti-fraud checks slow down simple claims?"
Fraud specialist
4 signatures
Constructed case. An insurer is redesigning how policyholders report a claim. Thirty staff from claims, customer service and IT hold a 90-minute Open Space. Its theme is "How can we make reporting a claim simpler for the policyholder?" The opening is at 10:00 and the closing at 11:30. Each session on the wall shows its convener and its number of signatures.

Two round 2 sessions deal with turnaround times. The facilitator keeps them separate: one looks for what the insurer can promise, the other for what it measures today.

Visualisations

One diagram shows the room in plan view: the circle around the empty centre and the wall where the participants post their sessions. A second diagram shows the Law of Two Feet between sessions. The comparison of the sources, the timing, the principles, the strings and the filled wall fit in rows and columns.

Cost

PhaseLevelJustification
PreparationMediumWord the theme with the sponsor, invite people on a voluntary basis, find a room with a free wall and places for the sessions, prepare how the reports will be written up.
ExecutionHighThe whole group is tied up for 90 minutes in the short form or for five hours to three days in Owen's form.
DocumentationMediumThe conveners write during the event. One person assembles the reports and distributes the document before departure.

Tooling

In the room, the method needs movable chairs, a large wall, masking tape, sheets of paper and markers. The conveners write large enough for their sheet to be read from about three metres. With 25 or more participants, the facilitator places the stack of sheets and a basket of markers in the centre of the circle. The book calls for microphones above 40 people. One large sheet carries the principles and the law. Another gives the list of places.

The facilitator puts no break or meal on the agenda apart from an optional opening dinner and the dinner on the last evening. Under the third principle, each discussion keeps its own pace. The facilitator provides coffee all day in the main room and a buffet that stays open for several hours. Everyone eats when they want.

For the reports, a few computers or a shared document (Microsoft 365, Google Docs) and a printer are enough. Owen made do with entry-level laptops.

Remotely, an online whiteboard (Miro, Mural) stands in for the wall. The breakout rooms of a video conference stand in for the places. Each participant must be able to choose and change rooms on their own. Zoom allows this.

Sources

Harrison Owen invented Open Space Technology and describes it in his User's Guide. The Liberating Structures book attributes the method to him and credits Lipmanowicz and McCandless with the short form.

  • Harrison Owen, A Brief User's Guide to Open Space Technology, original edition, early 1990s: the conditions, the basic structure, the four principles and the Law of Two Feet, the facilitator's role, the contraindications and the opening script.
  • Harrison Owen, Open Space Technology: A User's Guide, 3rd ed., Berrett-Koehler, 2008, ISBN 978-1-57675-476-4: the author's complete guide, which the Liberating Structures book recommends for a first Open Space.
  • Henri Lipmanowicz, Keith McCandless, The Surprising Power of Liberating Structures: Simple Rules to Unleash a Culture of Innovation, 2013, ISBN 978-0-615-89337-2: the Open Space Technology entry with its elements, timing, purposes, tips and variations. Also the strings of chapters 6 and 7 and the cases of Alison Joslyn and the Innovation Learning Network.
  • Open Space Technology, Liberating Structures (archive site): the online version of the book's entry.
  • Peggy Holman, Open Space Technology Opening Outline, 2004, updated 2018: the opening script, with the bumblebees and the butterflies, the fifth principle and the advice to keep similar sessions separate.
Onion Diagram
All techniques
Opportunity Analysis