NUF Test
The NUF test is a technique for evaluating ideas quickly. During a brainstorming session the group scores each idea from 1 to 10 on three criteria: is it new, is it useful, is it feasible? The name takes the initials of New, Useful and Feasible. Dave Gray, Sunni Brown and James Macanufo describe the test in Gamestorming (2010). The scores show each idea's weak point so that the group can rework the idea before anyone presents it outside the session.
Goal
With the NUF test, a group tests the ideas from a brainstorming session against the reality they will meet after the session. In Gamestorming the group runs it during the session on the ideas already proposed. The authors state that the test is not meant for killing good ideas. It finds their weak points so that the group corrects them before presenting the idea.
The deliverable is a grid: ideas in rows, the three criteria in columns, one score per cell. The group adds the weak points it keeps for discussion and the ideas it has reworked.
Dot voting and the bullseye are other ways for a group to judge options. Dot voting counts the votes placed on each option. The bullseye places each option by its distance from a single goal. The NUF test scores each idea on three criteria and shows which one falls short.
Usage
When to use it
- End of a brainstorming session: check the ideas before choosing the ones the group develops.
- Before presenting an idea outside the session: find its weak point while changing it costs little.
- A short list of ideas already worded: a small group fills the grid in 15 to 30 minutes.
- A mixed business and technical group: scoring Useful takes someone who knows the problem. Scoring Feasible takes someone who knows what delivery costs.
- A room where rank makes people hold back what they think: scores written down before anyone calls them out show a disagreement that nobody would have voiced aloud.
- A remote team: the grid fits in a shared spreadsheet where each person enters their scores.
When not to use it
- Thirty options to cut to five: dot voting gets there faster than three scores per option.
- A decision that commits a budget: a weighted decision matrix justifies the spend where a gut score cannot.
Description
The three criteria
| Criterion | Question | The score rises when the idea… |
|---|---|---|
| New | Has the idea been tried before? | differs clearly from what has been tried. |
| Useful | Does the idea solve the problem? | solves the whole problem without creating another one. |
| Feasible | Can it be done? | needs fewer resources and less effort. |
According to the authors, a new idea captures attention and opens possibilities. The group still weighs a new and useful idea against its cost to implement.
Running the test
- Prepare the grid. Gamestorming says to draw the grid quickly: one row per idea, one column per criterion. Each idea fits in one sentence that every participant understands the same way. A vague idea collects scores for different ideas.
- Read the three questions. The facilitator reads the group the question for each criterion. The source gives no anchors. The group therefore takes a few minutes to agree what 1 and 10 mean, for example "10 on Feasible: the team delivers it with its current means".
- Score alone and in writing. Each participant scores each idea on each criterion. Gamestorming offers this step as an option and gives no reason for it. Each person commits to a score in writing before hearing the others. The first score called out therefore no longer steers the next ones. The authors ask for a quick gut check.
- Call out and tally. Idea by idea and criterion by criterion, each person calls out their scores. The facilitator enters them in the grid. The authors say only that the group tallies the results. The group therefore sets two rules before the call-out. In each cell it combines the participants' scores by a sum or an average. For each idea it adds up the three criteria, averages them or keeps them separate. The source sets no pass mark.
- Discuss the weak points. The source says that the discussion after the tally can uncover uncertainties about an idea or ideas underrated until then. The group can then strengthen an idea. The authors give an example: "How do we make this idea more feasible with fewer resources?"
| Participant | New | Useful | Feasible |
|---|---|---|---|
| P1 | 8 | 9 | 1 |
| P2 | 7 | 9 | 2 |
| P3 | 9 | 8 | 2 |
| P4 | 8 | 10 | 3 |
| P5 | 8 | 9 | 7 |
| Average | 8 | 9 | 3 |
Gamestorming allows 15 to 30 minutes for a small group. The duration depends on the size of the group and on the time given to discussion.
Reading the score profile
Gamestorming does not say how to read the grid. Reading it by score profiles is an interpretation that does not come from Gamestorming.
The low score marks the subject of the discussion. Two opposite profiles call for two different discussions.
| Profile | What the profile signals | Question to ask |
|---|---|---|
| New and Useful high, Feasible low | Cost or effort blocks an idea that solves the problem. | How can it be done with fewer resources? |
| Feasible high, Useful low | The idea is easy to deliver and does not solve the problem. More resources change nothing. | What problem does it solve? |
| Useful and Feasible high, New low | Someone has already tried a similar idea. | What happened to the earlier attempt? |
| Scores spread within one cell | Participants differ in what they know, in the idea they have in mind or in the scale they use. | What does the person who scored 1 know that the person who scored 7 does not? Are they talking about the same idea? |
Pitfalls
The total taken as a verdict. A ranking by total discards the new and useful idea whose only flaw is feasibility. That ranking turns the test into a filter. Gamestorming gives the test another purpose: to find the weak points so that the group reworks the ideas. Two ideas with the same total can have opposite flaws. At most the total sets the order of the discussion.
The scale without anchors. One participant's 7 is worth another's 4. Without shared anchors the gap between two ideas measures the gap between two participants. The anchors set in step 2 correct this bias.
Debating every score. Before the grid is complete, a group that argues over every score overruns the 15 to 30 minutes that Gamestorming allows. Each person scores on instinct. The debate comes after the tally.
Feasible scored without knowing the cost. The source does not say who scores. If nobody in the room can cost the delivery, the Feasible column collects guesses. The facilitator then invites someone who costs this kind of work. Failing that, the facilitator treats the column as a hypothesis to verify.
AI considerations
Before the test, a language model rewrites each idea as one sentence. It flags duplicates and spots ideas that contain two.
For the New criterion, the model lists known solutions close to each idea. It does not know what the organisation has tried: the project abandoned three years ago appears in no model. It can also cite a precedent that does not exist. The group checks every precedent before using it.
After the tally, the model suggests variants of an idea that scored low on Feasible. It answers the authors' question: how do we make it feasible with fewer resources? The group judges these variants on the same footing as its own.
The model does not give the scores. The test measures the group's judgement. A score that the model suggests anchors the group in the same way as the first score called out. An organisation's ideas are often confidential. Before the workshop, the organisation applies its confidentiality rules to decide whether to send them to an external service.
Examples
A health insurer wants to cut the calls its customer service receives about reimbursements. Five participants score four ideas. The group has chosen to keep the three scores separate. Each cell gives the rounded average of the five scores.
| Idea | New | Useful | Feasible |
|---|---|---|---|
| A. Chatbot on the customer portal that gives the status of a reimbursement | 7 | 7 | 6 |
| B. SMS at each step in the processing of an invoice | 5 | 8 | 9 |
| C. Photo of the invoice in the app and an immediate answer on coverage | 8 | 9 | 3 |
| D. Phone line open on Saturdays | 4 | 2 | 8 |
C solves the problem. Delivery is the obstacle: the immediate answer requires a link between the app and the claims management system. The group keeps the photo and replaces the immediate answer with a reply from a claims handler within 48 hours. D is easy to deliver but moves the calls to Saturday. If the group added up the scores, A and C would reach the same total of 20. Only the grid shows that C has a single, specific defect that the discussion corrects.
Visualisations
A table shows the grid as it stands. The facilitator marks the low score in its cell and shows where the discussion starts. The grid carries no total column because Gamestorming does not fix the tally rule. A total column would draw the group into the ranking that the pitfall "The total taken as a verdict" describes.
Cost
| Phase | Level | Rationale |
|---|---|---|
| Preparation | Low | Write each idea as one sentence and draw the grid. A few minutes for the facilitator. |
| Execution | Low | The source allows 15 to 30 minutes for a small group. That time includes the discussion. |
| Documentation | Low | A photo or spreadsheet of the grid with the weak points kept and the reworked ideas. |
Tools
A whiteboard is enough. Participants write their scores on a sheet before calling them out. In a remote session each participant enters their scores in their own column of a shared spreadsheet. Only the spreadsheet computes the sum or the average under the agreed rules and shows the spread of scores in each cell. A digital whiteboard such as Miro or Mural also holds the grid.
Sources
- Gray, D., Brown, S. and Macanufo, J., Gamestorming: A Playbook for Innovators, Rulebreakers, and Changemakers, O'Reilly Media, 2010. Web edition of the "NUF Test" game: gamestorming.com/nuf-test. This source grounds the three criteria and their questions, the 1-to-10 scale, the individual scoring followed by the call-out, the discussion of weak points and the duration. The authors present the test as an adaptation of a patent examination process.

