Network Relationship Patterns
Network Relationship Patterns is a Liberating Structures meeting format in which a group compares three views of how it works: how it says it works, how it actually works and how it wants to work. For each view, every participant picks one pattern alone from ten network diagrams such as Hub and Spoke or Strict Hierarchy. The groups of four then compare their picks. Finally, the whole group looks for what it can change that same day. Eva Schiffer and Keith McCandless developed the structure. The materials credit the patterns to Eva Schiffer and her Net-Map toolbox. The session takes about 25 minutes.
Goal
Network Relationship Patterns is a meeting structure in which a group describes its working relationships with network patterns. A pattern is a small diagram that shows people, the links between them, how close they are and the direction in which power, information and know-how flow. The materials set these patterns against the formal organisation chart. The patterns show how the members interact and work together.
According to the Liberating Structures site, the structure clarifies the current patterns to prepare the move to new ones. It gives the group a shared language to describe and visualise intangible group dynamics. The site links it to the principle "Emphasize Possibilities: Believe Before You See".
Each participant leaves with their handout and its three marked patterns. The stated pattern is the one that the group presents to outsiders. The actual pattern is the one that it works in day to day. The desired pattern is the one that it wants to adopt. The groups of four name the gaps between the stated pattern and the actual pattern. The whole group settles on a first action towards the desired pattern.
In our view, the structure serves the business analyst when an organisation designs its target way of working after a merger or a reorganisation. Organisational modelling describes the roles and the reporting lines. Network Relationship Patterns has the group itself say how work flows between its members and which pattern it wants to adopt.
You will find the other structures in the repertoire under Liberating Structures.
Usage
When to use it
- Merger of two organisations or two teams: the group chooses the patterns of the new organisation.
- New community of practice: the group decides how to structure it.
- Initiative designed with Purpose-To-Practice: the site proposes this structure to design the Structure element.
- Map drawn with Social Network Webbing: the group imagines how its network could be reconfigured.
- Activities that call for different ways of organising: the group chooses one pattern per aspect of its work.
- A stated organisation that no longer matches daily work: the group compares the stated pattern with the actual pattern.
- Distributed team: according to the site, the structure works online with no major adjustments.
When not to use it
- Fewer than four people: the site sets this minimum. Prefer Generative Relationships STAR, which also works with two people.
- A climate where describing the real work exposes the speaker: an actual Hub and Spoke or Gatekeeper often points to a person in the room. First hold individual interviews to gather each person's account of how the team actually works.
- A need to document roles and reporting lines: prefer organisational modelling, which produces the organisation chart.
Description
The elements of the structure
The site describes every structure through five structural elements (Min Specs). For Network Relationship Patterns, the facilitator reads this invitation: "Rather than accepting the status quo, we can deliberately design how we work together to improve our work. We are going to explore and assess our current network relationship patterns and select a new pattern to explore."
Participants sit in groups of four. Each participant receives the handout of the ten patterns and the Risks and Benefits handout. Online, both handouts go into a visual collaboration space. The site names the facilitator and the participants as the roles. Online, the site adds a technical facilitator.
The group has at least four people. Everyone is invited and has an equal opportunity to contribute. Participants work alone, then in groups of four, then all together.
The network patterns
The patterns handout shows ten ways of organising work between people. In the legend of the materials, colour marks a differentiated or unique role. The spacing of the dots marks tight or loose coordination. Arrows mark the direction in which power, information or know-how flows.
The names of the patterns vary from one source document to another. The Risks and Benefits handout calls Cohesive Clique "Everyone Holding Hands". It covers Homogeneous Pairs and Autonomous Individuals in a single entry.
| Pattern | What the pattern describes | Risks | Benefits |
|---|---|---|---|
| Hub and Spoke | A central actor through whom all communication passes | If the central actor is overloaded or leaves, communication in the group stops. | Everyone knows whom to turn to. |
| Strict Hierarchy | A formal chain of command | It gives the illusion of control and overlooks informal relationships. | It organises standardised processes efficiently. In a crisis, it gives direction. |
| Heterogeneous Network | Very diverse members with varied links | Without clear direction, the group struggles to move from ideas to decisions. | The group combines different ways of working and encourages innovation. |
| Cohesive Clique | A tight group in which each member is linked to almost all the others | The group turns inward and mistrusts outsiders. It holds back diverging ideas. | Trust is strong. When a member leaves, the others take over the work. |
| Boundary Spanner | A person who links two communities | The spanner consolidates power by filtering information. Both sides may see the spanner as a traitor. | The spanner carries ideas and resources from one community to the other. |
| Gatekeeper | A person who controls access to a leader | The gatekeeper gains power without checks and balances. The gatekeeper can shield the leader from dissenting voices. | The gatekeeper sorts the requests and protects the leader's attention. |
| Core-Periphery Network | A densely connected core surrounded by a less connected periphery | The core can consolidate power and abuse it. The periphery has few means to check it. | The core decides quickly and consults the periphery. |
| Homogeneous Coalitions | Homogeneous groups with no link between them | Each coalition adopts win-lose strategies and drifts away from the others. | Each coalition agrees on what needs to be done and how to do it. |
| Homogeneous Pairs and Autonomous Individuals | Pairs or people who work alone | The pairs and the solo workers become isolated. Their innovations spread poorly. | The work needs little coordination. One or two people adapt quickly to a disruption. |
According to the materials, no pattern is the perfect solution. The choice of a pattern is "individual and collective".
The steps
- Introduction (1 min): the facilitator reads the invitation and has the group name a shared purpose. The facilitator hands out the two handouts.
- Individual reflection (4 min): each participant looks over the ten patterns and notes the ones that seem familiar. They can read the Risks and Benefits handout. If no pattern fits, they draw their own.
- How we say we work (2 min): the facilitator asks "Which pattern would we use to show someone outside the group how we work together?" Each participant circles their answer. They change colour or mark at each step. The facilitator points out that the answers may differ with role, experience and point of view.
- How we actually work (2 min): "Now be honest: which pattern best reflects how we really work together, day to day?" Each participant marks their answer.
- How we want to work (2 min): "Which pattern would help us be the most productive, have the best interactions, and work at our highest intelligence?" Each participant marks their answer.
- Reflection in groups of four (8 min): each group compares where its members' picks agree and where they differ.
- Plenary sharing (3 min): a few groups share what everyone needs to hear. Everyone listens for a new pattern that would help the group reach its shared purpose.
- First change (3 min): the whole group discusses the possibilities. The facilitator asks: "What's one thing we can do today to start working in a different way? What else will it take for each of us to make a transition?" A few people share their ideas.
The three marks
Each participant marks their three patterns alone and in sequence. After eleven minutes, the groups of four compare the picks from one view to the next and from one participant to the next.
The actual pattern varies with each person's role and experience. In our view, the facilitator leaves the disagreements on the actual pattern visible.
From the desired pattern to the first action
In our view, the facilitator writes each action in a form that names who acts, on what and from when: "From Monday, the on-call pair receives the hotline requests directly." The facilitator also notes what each person says they still need to make the transition. At the next session, the facilitator reads the actions back and checks that everyone got what they needed.
Online
Each participant marks their picks in the visual collaboration space. The groups of four meet in breakout rooms.
The structure's slide deck proposes a shorter online sequence.
- Each participant picks their three patterns alone (3 min).
- The participants place their picks on a shared whiteboard (4 min).
- The groups of four discuss what the patterns show and whether they matter (4 min).
- The whole group hears from the groups that have something to say to everyone (3 min).
- The groups of four look for an action or a first step towards a different pattern (4 min).
- The whole group hears from the groups again (3 min).
The two rounds in groups of four take up the "So What" and "Now What" questions of What, So What, Now What.
The same deck proposes an A-B-C variant. Each participant thinks of a group or a community of practice that they belong to. They choose three patterns and label them A, B and C. A is the "official" pattern that the group presents to outsiders. B is the pattern that they experience on the ground. C is a pattern that might generate more productive interaction. The participants share their picks on the whiteboard, then work out the next steps with 1-2-4-All.
Variations
The site suggests printing the patterns on cards and giving one set to each participant. The cards make the exercise more tactile.
It also suggests adding 25 minutes to the last three steps. The group then looks for where the differences in perspective come from. It names what some members know and others do not. It sets the next steps. Another variation spends more time on the risks and benefits of each pattern.
Stringing it together with other structures
| Site page | String | What it produces |
|---|---|---|
| Network Relationship Patterns | Network Relationship Patterns, then Troika Consulting and 15% Solutions | The next steps and the resolve to act |
| Network Relationship Patterns | Network Relationship Patterns with Drawing Together | The patterns drawn into a story |
| Social Network Webbing | Social Network Webbing, then Network Relationship Patterns | Possible reconfigurations of the network |
| Purpose-to-Practice | Network Relationship Patterns for the Structure element of Purpose-To-Practice | The structures that the team prefers for the different aspects of its organisation |
What makes Network Relationship Patterns fail
A facilitator who explains each pattern in detail does the group's work for it. The site advises against helping participants too much with defining the patterns. The participants read the diagrams and the Risks and Benefits handout themselves.
A group that looks for the right pattern often ends up choosing the one that looks best on paper. The site asks the facilitator to remind participants that no single pattern will fix everything and that each one has its risks. It invites participants to combine patterns or invent their own. A group that wants a Heterogeneous Network without reading its risks expects innovation and overlooks how hard it is to decide.
The fourth step asks for honesty. In our view, a participant seated next to their own manager marks the stated pattern more readily than the actual pattern. When the room brings several teams together, the facilitator forms the groups of four so that no group puts a manager with one of their direct reports. When the room brings a single team together, the manager necessarily shares a group of four with their direct reports. If the climate makes the actual pattern risky to name, the facilitator first holds individual interviews to gather each person's account of how the team actually works.
When time runs short, the facilitator is tempted to skip the last step. The group then names the gap and decides nothing. In our view, the facilitator keeps the three minutes of the first change and takes the missing time from the plenary sharing, then from the reflection in groups of four.
Origin
The site credits the structure to Eva Schiffer and Keith McCandless. Eva Schiffer created the Net-Map toolbox. The site first presented the structure under the working name "Network Patterning Cards". The site's menu lists Network Relationship Patterns among its structures.
AI considerations
Before the session, a language model translates the Risks and Benefits handout into French or German for a team that does not read English well. The facilitator asks it to keep the English pattern names, which the participants find on the patterns handout. A native speaker reviews the translation: a mistranslated risk changes a pick.
After the session, a model that reads images transcribes the photos of the handouts into a table with one row per participant and one column per view. It counts the picks per pattern and marks the gaps between the stated pattern and the actual pattern. Before sending the photos to an external service, the facilitator removes the names and the notes that target a person.
The model does not choose the group's pattern. The site asks the facilitator to let the participants define the patterns themselves. A model that infers a Hub and Spoke from the organisation chart or from email traffic takes that work away from the group. It also describes a network that nobody in the room has recognised.
Examples
In this constructed case, the application support team of a cantonal hospital has eight members. The table shows the picks of one of its groups of four.
| Participant | Stated pattern | Actual pattern | Desired pattern |
|---|---|---|---|
| Team lead | Heterogeneous Network | Hub and Spoke | Core-Periphery Network |
| Business analyst | Heterogeneous Network | Boundary Spanner | Core-Periphery Network |
| Developer | Strict Hierarchy | Hub and Spoke | Homogeneous Pairs |
| Tester | Heterogeneous Network | Hub and Spoke | Core-Periphery Network |
| First action chosen in plenary | From Monday, the on-call pair receives the hotline requests directly. The team lead receives only the escalations. | ||
Three of the four members say they work as a Heterogeneous Network. Three of the four actually work in a Hub and Spoke, in which every request goes through the team lead. The analyst sees herself as the only link between the business and the developers. Her lone pick shows a second chokepoint that the other three had not seen.
The first action moves the team away from the Hub and Spoke, since the team lead no longer receives every request. The on-call pair and the team lead form the core of the Core-Periphery Network that three members want. The rest of the team becomes its periphery.
Visualisations
The patterns handout shows the ten network diagrams and the three marks of the analyst in the case. A timeline lays the eight steps out across the 25 minutes and shows when the participant works alone, in groups of four or with the whole group. The patterns with their risks and benefits, the strings and the picks of one group of four fit in rows and columns.
Cost
| Phase | Level | Justification |
|---|---|---|
| Preparation | Low | Print the patterns handout and the Risks and Benefits handout for each participant. Translate them if the team does not read English well. |
| Execution | Low | 25 minutes with at least four people. The long variation adds 25 minutes. |
| Documentation | Low | Photograph the handouts. Record the gaps named and the actions chosen. |
Tooling
In the room, each participant receives the two printed handouts and pens or sticky dots in three colours. The site publishes the handouts in the structure's resource folder. They are in English.
Remotely, a shared whiteboard holds the patterns handout. Miro, Mural or the annotation tools on Zoom's whiteboard will do.
For the card variation, the structure's page links to a card deck that Birgit Nieschalk sells. This deck presents an expanded version of the patterns.
Sources
Network Relationship Patterns rests on the materials that the Liberating Structures community publishes. The structure's page is published under a Creative Commons BY-SA 4.0 licence.
- Network Relationship Patterns, Liberating Structures: the purposes, the invitation, the five structural elements, the eight steps and their durations, online facilitation, the tips, the variations, the applications, the strings and the credit to Eva Schiffer and Keith McCandless.
- Network Relationship Patterns, the structure's slide deck (Google Slides), Liberating Structures: the names of the ten patterns, the legend, the online sequence and the A-B-C variant.
- Network Relationship Patterns, Risks and Benefits (Google Docs), Liberating Structures: the risks and benefits of each pattern.
- Liberating Structures in Development, page archived on 2 January 2026 by the Internet Archive: the working name of the structure.
- Social Network Webbing, Liberating Structures: the string with Network Relationship Patterns.
- Purpose-to-Practice (P2P), Liberating Structures: Network Relationship Patterns for the Structure element and for the different aspects of the organisation.

