Illustrative case of a health insurer. At the top, the purpose: "We want every branch to reimburse a simple invoice within one working day and for the right amount." On the left, the eight rules that the participants listed. In the centre, the test question: "If we broke this rule, could we still achieve our purpose?" Five rules get a yes and drop out: use the head office letter template, print the benefit statement for the file, have the branch manager sign every benefit statement, fill in the weekly report, call the insured person to confirm receipt. On the right, three rules get a no and stay: enter the invoice on the day it arrives, check the cover before paying, never send a simple reimbursement to head office for approval.

Min Specs

Min Specs (minimum specifications) is a meeting structure from Liberating Structures. In it, a group sets the only rules it must respect to achieve a purpose: the absolute "must dos" and "must not dos". Each participant first writes down every rule they believe they must follow. These are the Max Specs. In small groups, the participants then put the test question to each rule. In its short form, it asks: "If we broke this rule, could we still achieve our purpose?" A rule that gets a yes leaves the list. The whole group keeps the shortest list. Henri Lipmanowicz and Keith McCandless describe the structure in The Surprising Power of Liberating Structures (2013) and on their website. The book allows 35 to 50 minutes for it.

Goal

Min Specs is a session in which a group cuts its rules down to those its purpose requires. A group often inherits directives, procedures and habits. It follows all of them because it cannot tell which ones matter. After the session, it acts freely within the limits it has kept.

The book calls these rules enabling constraints. It compares them to the Ten Commandments: they state only what must be done and what must never be done. According to the authors, a few rules respected without exception let a group innovate freely. The innovations then serve the purpose. The authors' website ties the structure to the sixth principle of Liberating Structures: Amplify Freedom AND Responsibility. The first "must do" of this principle is to specify minimum constraints and let go of over-control.

According to the book, the structure has a group decide what success requires, frees front-line staff from micromanagement and helps spread an innovation without losing what makes it work.

The deliverable is a short list of rules tied to a written purpose. The book says that "often two to five" are enough. The group makes the list official and lives by it.

Usage

When to use it

  • A new initiative or a challenging activity: the group sets the rules its success depends on before it acts.
  • Teams that wait for permission or are slowed down by procedures: the Min Specs set limits on what the team does. Within these limits, the team acts without waiting for approval.
  • Actions launched by an Open Space session: the Min Specs bound what the volunteers undertake.
  • An innovation to spread to other teams or sites: the Min Specs fix what stays the same everywhere. Each site adapts the rest.
  • Stakeholders opposed on a complex problem: the group agrees on the few rules that everyone respects.
  • A major transition (reorganisation, merger, new way of working): the group sets what must hold during the change.
  • The scope of a prototype: the group chooses the features to develop and prototype.
  • An assignment given or received: Min Specs go with every assignment.
  • A distributed team: the structure works online without major adaptation.

When not to use it

  • A purpose that is still vague: the test question has nothing to measure a rule against. Clarify the purpose first with Nine Whys.
  • Requirements to rank: Min Specs keeps or drops a rule without ordering the ones that remain. See prioritization.
  • Rules that an information system enforces: Min Specs sets limits on what a group of people does. See business rules analysis.

Description

Max Specs and Min Specs

The Max Specs (maximum specifications) are the full starting list: everything the group thinks it must do or not do to succeed. The term belongs to Liberating Structures. The book also gives the name Max Specs to the nonessential rules that get in the way of innovation. These are the rules that the test drops. The Min Specs are the rules that remain. The group cannot break any of them and still achieve its purpose.

The book also uses "Min Specs" in a second sense: each structure in its Field Guide presents its five elements under this heading.

The elements of the structure

Structuring invitation. For a challenging activity or a new initiative, the facilitator asks the participants to list all the must dos and must not dos that success requires. The facilitator then asks them to cut this list down to the minimum that achieves the purpose. On the website, the invitation is a sentence that the group says aloud. It states that the group uses its direct experience in the field to eliminate the nonessential rules and keep those that its purpose requires.

Space and materials. The participants sit in groups of 4 to 7 around small tables. They record the Max Specs and the Min Specs on paper. The website provides one sheet per participant.

Distribution of participation. Everyone involved in the activity can take part. Each person can contribute on an equal footing. The facilitator involves as many players and stakeholders as possible.

Group configuration. Everyone starts alone. Small groups of 4 to 7 test the rules. The whole group consolidates.

The purpose first

The test compares each rule with a purpose. Without a written purpose, it has nothing to measure a rule against. The website has the group phrase a shared purpose in one sentence that begins with "We want…". It holds that the group needs a clear purpose to evaluate the Max Specs. The book prescribes the purpose as a remedy: if the groups struggle, the facilitator circles back to it. The facilitator clarifies it and checks that it is limited to what matters.

The test question

The small groups go through their list rule by rule and put the book's question to each one: "If we broke or ignored this rule, could we still achieve our purpose?" A yes drops the rule. A no keeps it.

A useful rule also drops out when the purpose stays within reach without it. A health insurer wants every branch to reimburse a simple invoice within one working day and for the right amount. The branch manager's signature on each benefit statement serves internal control. Yet the branches can achieve the purpose without it. It leaves the list.

PurposeWe want every branch to reimburse a simple invoice within one working day and for the right amount.
Max Specs
1Enter the invoice on the day it arrives
2Use the head office letter template
3Check the cover before paying
4Print the benefit statement for the file
5Have the branch manager sign every benefit statement
6Never send a simple reimbursement to head office for approval
7Fill in the weekly report
8Call the insured person to confirm receipt
If we broke this rule, could we still achieve our purpose?
YesDropped
2Use the head office letter template
4Print the benefit statement for the file
5Have the branch manager sign every benefit statement
7Fill in the weekly report
8Call the insured person to confirm receipt
NoMin Specs
1Enter the invoice on the day it arrivesMust do
3Check the cover before payingMust do
6Never send a simple reimbursement to head office for approvalMust not do
Illustrative case. The group puts the same question to each of the eight rules. Five rules get a yes and leave the list. The three rules that remain are the Min Specs.

The book offers a second test for the remaining rules: "If you followed all the Min Specs except this one, would you achieve your purpose?" A yes drops the rule here too. The first test judges each rule alone. The second judges it together with the others. It drops the rule that the others already cover.

The steps according to the book

  1. Max Specs alone (1 min). Each person writes down everything that must be done and not done to achieve the purpose.

  2. Max Specs in small groups (5 min). The group pools the lists and makes them as complete as possible.

  3. Test (15 min). Each small group tests each rule against the purpose. It drops every rule that it can break and still achieve the purpose.

  4. Second round if needed (15 min). The small group puts the test question to the remaining rules again. The group can apply the book's second test in this round.

  5. Consolidation (15 min). The whole group compares the lists of the small groups. It reduces them to the shortest list.

1Max Specs alone1 min
2Max Specs in small groups5 min
3Test15 min
4Second round15 minif needed
5Consolidation15 min
Alone
4 to 7
All
36 min without a second round, 51 with one
The Min Specs steps according to the book. Each person lists the Max Specs alone. The small groups complete the list and test it. A second round follows if needed. The whole group consolidates the lists into the shortest one.
StepBookAuthors' website
Introduction: read the invitation, phrase the purpose as "We want…"not in the book1 min
Max Specs alone1 min1 min
Pooling in small groups5 min in groups of 4 to 76 min in groups of 4 to 5
Test15 min15 min
Second round15 min if needed10 min as an option
Consolidation15 min15 min
First steps to apply the Min Specsnot in the book2 min
Sum of the steps36 min without a second round, 51 min with one40 min without a second round, 50 min with one
Stated duration35 to 50 minabout 40 to 50 min
Min Specs timings in the book and on the authors' website.

The website sets the minimum group size at 4 people.

After the session

The book asks the group to make the Min Specs official. The group then lives by them: no "yes but". The website calls them inviolable. The book also asks the group to keep the Min Specs alive. The group adapts them to experience in the field and to the observations of Simple Ethnography. Plsek and Wilson note that minimum specifications that come out of a dialogue are not perfect and evolve over time.

Variants

The group can also write the Min Specs of the future. It asks which Min Specs should guide its future action. It then uses them to inform the present.

For an online session, the book has the participants share their answer to each test question in the chat. When the list gets short, the facilitator lets everyone speak.

According to the book, Simple Ethnography or Nine Whys can bring tacit Min Specs to light.

Stringing Min Specs with other structures

Chapter 6 of the book combines structures into strings. In its four examples that contain Min Specs, another structure comes first. That structure produces the material: a purpose, success stories, local actions or the trust of the formal leaders. Min Specs draws the rules from it. The next structure acts within those limits.

StringBefore Min SpecsAfter Min SpecsGoal in the book
W³ + Appreciative Interviews + Min SpecsW³ establishes the starting reality and the actions it suggests. Appreciative Interviews brings out the conditions of past successes.The group goes back to the Now What? actions. It keeps those that respect the Min Specs.Noticing patterns together
Open Space + Min Specs + 25/10 Crowd SourcingOpen Space launches local actions.25/10 Crowd Sourcing finds the bolder initiatives within these limits. Volunteers carry them.Unleashing local action
Nine Whys + Min Specs + Ecocycle + PanarchyNine Whys clarifies with the community what justifies the work.Ecocycle maps the activities and relationships of the organisation on the ecocycle. Panarchy does the same at the other levels.Spreading innovation
Celebrity Interview + Min Specs + EcocycleCelebrity Interview builds understanding and trust with the formal leaders.Ecocycle maps the activities and relationships on the ecocycle. The group spots possible changes on this map.Spreading innovation
The strings in Chapter 6 of the book that contain Min Specs.

The Field Guide also suggests following Appreciative Interviews with Min Specs. The website suggests Creative Destruction after Min Specs when the participants struggle to let go of the Max Specs.

Where the structure comes from

The book attributes the structure to Henri Lipmanowicz and Keith McCandless. It names Professor Kathleen Eisenhardt and author Paul Plsek as its inspiration. It refers to the book Edgeware by Zimmerman, Lindberg and Plsek. The website cites the work of Paul Plsek, Brenda Zimmerman and the Plexus Institute.

Plsek and Tim Wilson described minimum specifications in the BMJ in 2001. In their view, creative progress towards a difficult goal can emerge from a few simple and flexible rules. Their minimum specifications typically provide direction, boundaries, resources and permissions. Their example on thrombolysis contains a permission: any trained medical staff may administer the treatment in any safe setting. Min Specs keeps only must dos and must not dos. The four-part framework belongs to Plsek and Wilson.

The traps

Max Specs that creep back undo the work. A rule dropped at the test reappears at consolidation in other words: "use the head office letter template" becomes "follow the corporate communication guidelines". The book asks the group to be ruthless and not to let Max Specs creep back in. The website asks the facilitator to congratulate the groups that drop many rules.

Conceptual knowledge keeps rules that front-line staff would drop. The book gives more weight to direct experience in the field than to conceptual knowledge. The facilitator has the people who do the work every day answer first.

An incomplete starting list leaves rules out of the test. A rule that nobody wrote down goes on applying. The facilitator asks for a complete list of must dos and must not dos at the start and involves as many players as possible.

The rule set by the manager in the room survives the test out of caution. A participant hesitates to tell the manager present that one of the manager's rules can go. The remedy comes from practice: the facilitator forms the small groups without direct reporting lines. Failing that, the manager answers the test question last.

Min Specs without authority remain wishful thinking. A manager who still demands a dropped rule restores it in practice. The Min Specs become official when the person with authority over the rules adopts the list. Even once adopted, Min Specs do not hold by themselves. In Venezuela, Alison Joslyn wrote Min Specs with the leaders of the 70 projects that an Open Space produced. Of the 70 projects, 17 obtained formal support. Ten of them stayed within the Min Specs for six months. The other seven left them. The book calls the result messy.

A rule imposed from outside does not lapse because a workshop answered "yes". A legal obligation, a regulatory requirement or a control that internal audit demands binds the group. If the purpose does not name the rule, the test drops it on paper and the organisation restores it. In practice, the facilitator lists these rules separately before the test or writes them into the purpose. In the health insurer case, the branch manager's signature leaves the list only if internal audit does not require it.

AI considerations

Before the session, a language model helps complete the starting list. The facilitator gives it the directives and procedures that govern the activity. The model extracts each obligation and each prohibition as one sentence. The participants receive this list next to their own. To keep the test within 15 minutes, the facilitator adds only the model's rules that no participant wrote down.

The test stays with the group. The question "could we still achieve our purpose?" requires experience in the field. A model has only the text of the rules.

After the session, the model spots the rules that overlap between the lists of the small groups. It flags a Min Spec that restates a dropped rule in other words. It rewrites each Min Spec as a short sentence that starts with a verb. The group validates each rewrite.

Internal directives can be confidential. The facilitator submits them only to an AI service that the organisation authorises.

The authors say nothing about AI. These uses rest on practitioner judgement.

Examples

Among its stories, the book gives the content of the Min Specs for one case only: Montana Senate Bill 29 (SB 29) on responsible alcohol sales and service. Senator Lynda Bourque Moss brought parties that usually opposed each other together around the bill. The Min Specs came out of the stories in their Appreciative Interviews.

Min SpecWhat the book adds
Purpose: everyone shares the responsibility for preventing drunk driving.
Training for alcohol servers and sellers is mandatory. So are personal fines and the threat of licence revocation for the employer.The rule was meant to lower liability insurance premiums and give the law weight.
Requirements for servers stay reasonable, respectful and flexible.A part-time employee keeps their training certificate when they change jobs.
Servers and sellers learn to say no.The behaviours and social skills that this job demands are neither simple nor common.
The Min Specs of Montana's SB 29 as the book reports them. All three rules are must dos.

Each rule sets a limit and leaves open how to respect it. None says who trains the servers or how.

Visualisations

The diagram of the test question and the diagram of the steps go with the Description. The table of timings and the table of strings complete it. The SB 29 table illustrates the Examples.

Cost

PhaseLevelJustification
PreparationLowWrite the purpose. Invite the people who do the work and set out tables that each seat 4 to 7.
ExecutionMediumThe steps in the book add up to 36 to 51 minutes. The website states about 40 to 50. Everyone involved in the activity takes part.
DocumentationMediumPublish the official Min Specs with their purpose, then adapt them to experience in the field.

Tooling

Face to face, one flip chart per small group holds the shared list. The group crosses out each dropped rule on it.

Online, the videoconferencing tool opens breakout rooms. The chat collects the answers to the test questions. The website mentions an optional visual collaboration space. A digital whiteboard such as Miro or Mural keeps the lists of the small groups side by side for the consolidation.

After the session, a shared document or a wiki page publishes the official Min Specs with their purpose. The group records each adaptation there.

Sources

The article by Plsek and Wilson defines minimum specifications.

  • Henri Lipmanowicz, Keith McCandless, The Surprising Power of Liberating Structures: Simple Rules to Unleash a Culture of Innovation, 2013, ISBN 978-0-615-89337-2: the description of Min Specs with its purposes, tips, variations, examples and attribution (Field Guide, Part Four); the strings and their triggers (Chapter 6); the Montana SB 29 and Venezuelan turnaround stories (Part Three).
  • Min Specs, Liberating Structures: the website version with its invitation, timings, minimum group size, online facilitation and string with Creative Destruction.
  • LS Principles, Liberating Structures: the sixth principle "Amplify Freedom AND Responsibility" and its must dos.
  • Paul E. Plsek, Tim Wilson, "Complexity, leadership, and management in healthcare organisations", BMJ 323(7315), 2001, pp. 746-749, DOI 10.1136/bmj.323.7315.746: the definition of minimum specifications, the four things they provide and the thrombolysis example.