Your Training Partner
Techniques Toolbox
A cycle of four modes running clockwise: concrete experience at the top, reflective observation on the right, abstract conceptualisation at the bottom, active experimentation on the left. A vertical axis links concrete experience to abstract conceptualisation: grasping experience. A horizontal axis links active experimentation to reflective observation: transforming experience. The quadrants hold the learning styles: diverging at top right, assimilating at bottom right, converging at bottom left, accommodating at top left.

Kolb's Learning Cycle

Kolb's learning cycle describes learning as a passage through four modes: concrete experience, reflective observation, abstract conceptualisation and active experimentation. David A. Kolb places it at the centre of his experiential learning theory (1984, 2nd edition 2015). The business analyst uses it to design the training that accompanies the deployment of a solution: each session takes the participants through all four modes.

Goal

Kolb's learning cycle models the way a person learns. Kolb defines learning as "the process whereby knowledge is created through the transformation of experience". Lived experience feeds reflection. Reflection condenses into concepts. The concepts suggest actions to try and the try-out creates a new experience.

The cycle corrects training that stops at a demonstration. For two and a half hours the participants watch the new tool. They observe and are given concepts. Concrete experience and active experimentation are missing. The participants then handle their first real case without having experienced or tried anything.

The cycle supports a design decision: which activities the training contains, in what order and who runs them. The deliverable is a learning plan. For each mode it names the activity, what the activity produces, its owner and its duration. This deliverable is our addition.

Usage

When to use it

  • User training before go-live: replace the demonstration with short cycles, one per task.
  • A new process that replaces a habit: start from what the participants do today, then set the old workflow against the new one.
  • Low use of the tool after training: review the programme and find the mode it skipped.
  • A mixed audience: each person enters through a different mode. The plan covers all four.
  • Handover to the operations team: have the team handle real incidents under supervision instead of handing over the documentation alone.
  • Review of a pilot: draw rules from the experience, then try them on the next batch.
  • A problem to solve in a session: follow the four stages of Kolb's problem-solving model.
  • Remote training: reflect in video-conference breakout groups and try things out in the training environment.

When not to use it

  • News that needs no new skill: new support hours call for no training. A note is enough.
  • Refusal rooted in a group norm: training does not remove it. Lead the change first with Lewin's change model.

Description

The learning modes

Kolb distinguishes two operations. The learner grasps experience through concrete experience or through abstract conceptualisation. The learner transforms it through reflective observation or through active experimentation. The two modes of each operation are opposed. For Kolb, learning arises from the resolution of the creative tension among the four modes.

  • Concrete experience: the learner experiences a situation. For example, they handle a case in the new tool.
  • Reflective observation: they look back on what happened and view it from several angles, alone or with others.
  • Abstract conceptualisation: they condense their observations into concepts, rules or models.
  • Active experimentation: they turn these concepts into actions and try them out in their work.
A cycle of four modes running clockwise: concrete experience at the top, reflective observation on the right, abstract conceptualisation at the bottom, active experimentation on the left. A vertical axis links concrete experience to abstract conceptualisation: grasping experience. A horizontal axis links active experimentation to reflective observation: transforming experience. The quadrants hold the learning styles: diverging at top right, assimilating at bottom right, converging at bottom left, accommodating at top left.ConcreteexperienceReflectiveobservationAbstractconceptualisationActiveexperimentationDivergingAssimilatingConvergingAccommodatingGrasping experienceTransforming experienceA cycle of four modes running clockwise: concrete experience at the top, reflective observation on the right, abstract conceptualisation at the bottom, active experimentation on the left. A vertical axis links concrete experience to abstract conceptualisation: grasping experience. A horizontal axis links active experimentation to reflective observation: transforming experience. The quadrants hold the learning styles: diverging at top right, assimilating at bottom right, converging at bottom left, accommodating at top left.ConcreteexperienceReflectiveobservationAbstractconceptualisationActiveexperimentationDivergingAssimilatingConvergingAccommodatingGrasping experienceTransformingexperience
The learner moves from concrete experience to reflective observation, then to abstract conceptualisation and active experimentation. The vertical axis sets two ways of grasping experience against each other. The horizontal axis sets two ways of transforming it against each other. Each learning style combines the two modes on either side of it.

The full cycle and short cycles

Kolb presents the cycle as an idealised cycle or spiral in which the learner passes through all four modes: experiencing, reflecting, thinking and acting. A training session can follow the full cycle. It starts from an experience and makes time for reflection alone or in a group. It then supplies the concepts that give the experience its meaning and has the participants test their conclusions in a new experience.

For Kolb, learning usually happens in many short or partial cycles. The learner's style or the context can decide the mode through which they enter the cycle. A half-day session therefore holds several cycles, one per task. A participant who asks for the rule before any exercise enters through conceptualisation. The trainer answers, then moves them on to the try-out.

Kolb finds the origin of the four-stage cycle in the model that Kurt Lewin built for action research and laboratory training. He relates it to the models of John Dewey and Jean Piaget. Lewin based his model on feedback. For him, the ineffectiveness of a person or an organisation often came from an imbalance between observation and action. Some people decide and act without gathering information. Others get bogged down in collecting and analysing data. A two-and-a-half-hour demonstration leans towards observation. A go-live with no training, where everyone "dives in", leans towards action.

Learning styles

A learning style is a person's preference for certain modes of the cycle. Kolb attributes it to heredity, life experience and the demands of the present environment. Each person resolves two tensions in their own way: the concrete against the abstract and action against reflection. Kolb's Learning Style Inventory (LSI) appeared in 1971. Research with the inventory identifies four styles.

StyleDominant modesStrengthIn training, prefers
DivergingConcrete experience and reflective observationViewing a concrete situation from many angles. Generating ideas.Group work, open-minded listening and personal feedback
AssimilatingAbstract conceptualisation and reflective observationUnderstanding a wide range of information and putting it into a concise and logical form.Readings, lectures, analytical models and time to think
ConvergingAbstract conceptualisation and active experimentationFinding practical uses for ideas and theories.Trying out new ideas, simulations, practical assignments and applications
AccommodatingConcrete experience and active experimentationLearning from hands-on experience.Working with others, setting goals, field work and trying several ways to complete a project
The four learning styles according to Kolb and Kolb (2005). Each style combines a mode that grasps experience and a mode that transforms it.

Kolb and Kolb define the style as a dynamic state that arises from repeated transactions between the person and their environment. Version 4.0 of the inventory (KLSI 4.0) refines the typology into nine styles. It also measures learning flexibility: the ability to use each of the four modes and to adapt one's way of learning to the situation. In our view, the trainer must guide a group with little flexibility through each mode, whereas a flexible group needs only shorter instructions.

Honey and Mumford's learning styles (Activist, Reflector, Theorist and Pragmatist) form another typology and rest on another questionnaire.

All learning is relearning

From the cycle, Kolb draws a rule for anyone who designs training: all learning is relearning. Every participant arrives with ideas about the subject. They use these ideas in their work, even if some are wrong. The trainer implants new ideas and must also discard or modify the old ones. According to Kolb, the learner learns more easily when the training draws out their beliefs, examines them and tests them before they integrate the new ideas.

Kolb builds on Piaget. A person adopts a new idea by integration or by substitution. An integrated idea becomes a stable part of the way the person sees the world. A substituted idea can give way to the old one. The person may also keep two theories. Chris Argyris and Donald Schön call them espoused theory and theory-in-use. Double-loop learning works on the gap between the two.

In a deployment, the old process is the participants' theory-in-use. The plan starts by having them describe it: what each of them does today and what they expect from the new tool. Reflective observation then compares the old workflow with the new one. A training session that presents the new process as if the old one did not exist sets up a substitution. At the first difficult case, the old way of working comes back.

Principles of a learning space

From the theory, Kolb and Kolb (2005) derive principles for designing a learning space. A trainer can check a training session against their list. Applying these principles to workplace training is our own addition.

  • Respect learners and their experience: the participants know that the trainer knows them and that their experience counts. The trainer knows each person's job.
  • Begin with the learner's experience of the subject: have the participants describe the old process before showing the new one.
  • Create and hold a hospitable space: Kolb and Kolb take from Robert Kegan the idea that people grow best in "an ingenious blend of challenge and support". In a company, this space is a training environment where a mistake touches no real data and nobody is assessed.
  • Make space for conversational learning: plan exchanges between participants in pairs or in small groups.
  • Make space for acting and reflecting: every presentation leads to a try-out, every try-out to feedback.
  • Make space for feeling and thinking: fear and anxiety can block learning. The trainer names what the change takes away from the participants.
  • Make space for inside-out learning: link the exercise to the learner's interests and goals, for example to the case that troubles them today.
  • Make space for the development of expertise: deliberate and repeated practice of the tasks of the job rather than a quick tour of every function.
  • Let learners take charge of their own learning: each participant leaves with the cases they still want to try.

The cycle applied to problem solving

Kolb and Kolb (2009) apply the theory to management. In their view, each specialised management process emphasises certain phases of the cycle. Creativity emphasises the diverging phases. Strategy formulation emphasises the assimilating phases. Problem solving and decision making emphasise the converging phases. Entrepreneurial learning emphasises the accommodating phases. All of them gain from going round the whole cycle. A strategy workshop leans towards assimilation. In our view, the BA should add a trial before the decision, for example a limited pilot.

Kolb derives from the cycle a problem-solving model whose stages follow the modes of the cycle. Each stage begins in a "green mode" that opens up the options and ends in a "red mode" that decides.

StageMode of the cycleGreen modeRed modeWhat the stage establishes
Situation analysisConcrete experienceValuingPriority settingThe right problem to work on
Problem analysisReflective observationInformation gatheringProblem definitionThe variables that influence the problem
Solution analysisAbstract conceptualisationIdea gettingDecision makingThe solution chosen against the criteria set at the previous stage
Implementation analysisActive experimentationParticipationPlanningA plan with its deadlines and its follow-up evaluations
Kolb's problem-solving model. Each stage follows one mode of the cycle and moves from a divergent opening to a convergent close.

Designing training with the cycle

These steps are our own derivation from Kolb's texts.

  1. Name what the participants will be able to do
    A list of observable tasks in the new tool or the new process, for example "register an arrival". Each task gets its own cycle.
  2. Gather the participants' experience
    How they handle each task today, what they fear and what they expect. A short interview with two or three of them is often enough.
  3. Plan one activity per mode and per task
    Experience: handle a realistic case in the training environment. Reflection: compare with the old workflow in pairs. Concept: the rule, the process model or the screen that explains the differences found. Try-out: handle a second case alone, then real cases on the job with support.
  4. Order the activities
    The full cycle starts from experience. A task that nobody knows can start from the concept. The try-out of one cycle supplies the experience of the next.
  5. Prepare the space
    The training environment, no individual assessment and time for conversation. If the training environment is missing or not ready, printed screens and paper cases provide the concrete experience. A demonstration by a key user provides the reflective observation. The try-out then moves to real cases on the job.
  6. Check the coverage
    Each task has an activity and a time slot for each mode. If the styles of the group are known, the plan protects the weakest mode of the group. Otherwise it gives the four modes comparable shares.
  7. Name an owner and a duration for each activity
    The learning plan fits in one table per task, one row per mode.
Demonstration
Project presentationAC
Tool demonstrationRO
Questions and answersAC
Short cycles
Arrival
CE20 min
RO15 min
AC15 min
AE20 min
Departure
CE20 min
RO15 min
AC15 min
AE20 min
Change of address
CE20 min
RO15 min
AC15 min
AE20 min
CEConcrete experience
ROReflective observation
ACAbstract conceptualisation
AEActive experimentation
Two programmes for the same half-day. The demonstration runs through the whole tool and works on two modes. In short cycles, three tasks each pass through all four modes.

Pitfalls of the plan

A group of managers pushes to cut the reflection short and get to action. Kolb and Kolb (2009) report that managers are generally distinguished by strong active experimentation and weaker reflective observation. A trainer who gives in removes the moment where the old workflow meets the new one.

The style becomes a label. A trainer who groups the participants by style and gives each group only the activities of its style deprives them of the other modes. Learning flexibility develops through going round the whole cycle.

The cycle is read as a rigid procedure. A plan that imposes the order experience, reflection, concept and try-out on everyone loses the participants who ask for the rule before the exercise. Over a half-day, several short cycles where each person enters through their preferred mode work better than one big cycle.

The exercise cases are too clean. Fictitious files with no edge case teach a path that the first real file breaks. The trainer builds the cases for the concrete experience and for the try-out from real anonymised files. Each task gets one known difficult case.

AI considerations

A language model prepares the material for each mode. From anonymised files it drafts realistic exercise cases for the concrete experience. It writes variants of increasing difficulty for the active experimentation. From the description of the two processes it proposes reflection questions that compare the old workflow with the new one. It turns the vendor's manual into a first draft of a job aid. The trainer completes the draft with the rules that the group identified. After the sessions the model sifts through the participants' free-text comments and sorts them by mode. A run of "we didn't have time to try it" remarks signals a try-out cut short.

AI does not know the participants' experience of the old process. The business analyst gathers it from them. An exercise case drafted by AI can apply a wrong business rule. The subject-matter expert reviews the case before the session. Otherwise the participants learn the error. A real file fed as it is into an external AI service exposes personal data. A private company is subject to the Federal Act on Data Protection (FADP). A cantonal or municipal administration is subject to the cantonal data protection act.

Examples

The residents' registration office of a municipality of 12'000 inhabitants in the canton of Vaud is moving to new software. In one short cycle, the plan covers the first task of the four counter staff: registering an arrival.

ModeActivityOutputOwnerDuration
Concrete experienceIn the training environment, each staff member registers the fictitious arrival of a family of four moving from the canton of Fribourg.Four records entered and the time each person tookKey user20 min
Reflective observationIn pairs, compare with the old software: the steps added, the steps removed and the screens where they hesitated.List of differences on the whiteboardBusiness analyst15 min
Abstract conceptualisationPresent the target process and the entry rules that explain the differences found. The group completes the job aid.One-page job aidBusiness analyst15 min
Active experimentationWorking alone, handle the arrival of a person moving from abroad. The next day, register two real arrivals at the counter with the key user alongside.Questions and difficult cases notedKey user20 min, then one day of support at the counter
Learning plan for the task "register an arrival".

The next cycle starts from the difficult cases noted at the counter: they become the concrete experience of a second cycle on arrivals.

Visualisations

The cycle is drawn on its two axes: grasping experience on the vertical, transforming it on the horizontal. Each style occupies the quadrant between its two modes. The BA checks the coverage of a programme on a timeline: each time block takes the colour of the mode it works on. A programme with two colours missing stands out at a glance. By hand, the BA draws one band per programme. The BA gives each mode a colour and each block a length proportional to its duration.

Cost

DimensionLevelJustification
PreparationMediumGather the participants' experience, write one case per task and prepare the training environment.
ExecutionMediumOver a half-day, short cycles cover three tasks whereas the demonstration covers the whole tool. The try-out on the job ties up a key user for one day.
DocumentationLowA one-page learning plan and one job aid per task.

Tooling

The learning plan fits in a spreadsheet or on a page of the project's collaborative workspace. Concrete experience requires a training environment: a copy of the new tool loaded with fictitious data. The participants note their reflections on a physical or online whiteboard (Miro, Mural, FigJam). Remotely, breakout rooms in Microsoft Teams or Zoom host the pair discussions. A learning platform such as Moodle keeps the exercise cases and the job aids for newcomers. Experience Based Learning Systems publishes the KLSI 4.0. This paid questionnaire measures the style of each participant. A plan that covers all four modes can do without it.

Sources

Kill a stupid rule
All techniques
Kotter's change process