Your Training Partner
Techniques Toolbox
Grid with two axes. The impact of removal rises from left to right. The ease of removal rises from bottom to top. Top right, the quick-win box holds R1 (weekly report) and R2 (expense claim signature). R3 (three approvals for IT equipment) sits at the bottom in the middle. R5 (second signature on the employment contract) sits on the left in the middle. Outside the grid, a separate strip headed "Red rules" holds R4 (retention of time records).

Kill a stupid rule

Kill a stupid rule is a workshop technique in which a group names the internal rules that slow its work and then decides what happens to each one. Lisa Bodell described it in Kill the Company (2012). She runs the consulting firm futurethink. Each participant writes one rule on a note. The group separates legal obligations from the rules the organisation gave itself. It places the latter on an impact and ease grid. Each rule receives a decision: kill, change, pilot or keep. The session ends with a commit list in which every line has an owner.

Goal

Kill a stupid rule is a short session in which a group lists the rules that hinder its work or its service to customers, then decides what happens to each one. A rule here means any constraint the organisation imposes on itself: a signing threshold, a periodic report, an approval chain, a standing meeting. An unwritten habit counts too.

The technique removes obstacles. Brainstorming and most ideation techniques produce options to evaluate. Kill a stupid rule produces decisions: kill, change, pilot or keep.

The deliverable is a decision register. Each rule in it receives a decision and an owner. A trial kill or a pilot also receives a review date. For the business analyst, the session often comes before a process redesign. It points to the steps of the current state that rest on habit alone.

Usage

When to use it

  • Recurring complaints about red tape: turn the complaint into a list of named rules and settle each one.
  • Current-state analysis of a process: spot the approvals and reports nobody can justify before drawing the target state in process analysis.
  • An obstacle that returns from retrospective to retrospective: take the subject out of the retrospectives and settle it with the person who owns the rule.
  • Recent merger or reorganisation: sort the rules inherited from both organisations.
  • One hour available: the session produces a decision register.
  • Remote team: an online whiteboard carries the notes, the grid and the vote.

When not to use it

  • An obstacle caused by a missing resource or skill: no rule to kill, look for the cause with root cause analysis.
  • Need for a new solution: the technique removes without designing, generate options with brainstorming.
  • Fully regulated scope (for example an AMLA process): nothing to decide in the session, document and check each rule with business rules analysis.

Description

Lisa Bodell sets out the steps in her article "How to encourage innovation by upending rules" (Duke Corporate Education, 2016). The session fits into one hour.

StepMinutes
Question and team discussion10
Notes5
Red and green sort10
Duplicates5
Grid10
Vote and decisions15
Commit list5
Total60

When the teams extend the discussion, the facilitator takes that time back from the grid.

How a session runs
1Question
teams of two or three
2Notes
one rule per note
3Red and green sort
Green rule
4Duplicates grouped
5Impact and ease grid
6Decision
KillChangePilotKeep
7Commit list
owner, deadline
Red rule
Keep, reason recorded
Review date
Red rules go no further than the red and green sort. The group keeps them and records their reason. Each green rule receives a decision and an owner. A trial kill or a pilot comes back on its review date.

Preparing the session

Participants work in teams of two or three that mix departments and levels of hierarchy. The mix reveals the rules one department imposes on another without knowing it. The facilitator invites at least one person who can kill the rules in scope. Without that person, the session produces a wish list.

The facilitator sets the scope: a department, a process or a customer journey. A scope that is too wide produces notes about "bureaucracy". In a strongly hierarchical team, nobody writes down the rule that the boss in the room introduced. The facilitator then collects anonymous notes before the session or on an online board.

Asking the question

The facilitator asks Lisa Bodell's question: "If you could kill or change all the stupid rules that get in the way of better serving our customers or just doing your job, what would they be and how would you do it?"

Each team has ten minutes. When a team asks for more time, the facilitator lets it carry on. Each person then writes the rule they hate most on a sticky note.

Each note carries one rule. Nobody can decide what to do with "Too much paperwork". "Every expense claim carries the department head's signature" can be killed, changed or kept. The facilitator has the complaint rephrased as a rule before it goes on the wall.

Separating red rules from green rules

Red rules come from the law. The organisation cannot change them. Green rules are the ones it gave itself. The futurethink toolkit makes the same split between non-negotiable rules (legal, regulatory) and rules that exist out of habit. In Switzerland, a red rule comes for example from the Federal Act on Data Protection (FADP), a FINMA circular or employment law.

Whoever claims that a rule is a legal requirement cites the article or the directive. The law sometimes sets an objective and leaves the means to the organisation. The objective is red. The internal means that implements it is green and open to discussion. A rule whose text nobody can find is green.

Red rules go no further than this sorting step. The group keeps them separate and records their reason so that the teams know it.

Grouping the duplicates

Some rules come up in several teams. The group merges identical notes and counts the mentions. A rule that several teams mention goes to the top of the discussion.

Many notes target a habit rather than a written rule: the Monday meeting, the email copied to the whole team. A habit has no owner. The group assigns one. Otherwise nobody kills it.

Placing the rules on the grid

The grid has two axes. The horizontal axis measures the impact of removal, from low to high. The vertical axis measures the ease of removal, from low at the bottom to high at the top. Each participant places their note according to their position in the organisation. The authors of a merged rule place it together.

Each person estimates what the removal gains in working time or in lead time for the customer, then what it costs. A tool to reconfigure, a contract to renegotiate or several departments to convince make the removal less easy. The box at top right holds the quick wins: the high-impact rules that are easy to kill. Discussion comes after placement.

Deciding what happens to each rule

DecisionConditionEffect
KillThe rule adds nothing and nobody defends it.It disappears at once.
ChangeThe purpose of the rule holds. Its means creates the friction.The group rewrites the rule and keeps its purpose.
PilotThe effect of the change is uncertain.A small group applies the new rule until a review date.
KeepThe rule serves a purpose the group recognises.It stays. The group records its reason.
The four futurethink decisions. A killed rule disappears. A changed rule keeps its purpose. A piloted rule changes for a small group. A kept rule stays with its reason.

Before killing a rule, the group names its purpose. A signature on expense claims controls spending. If that control is still needed, the rule moves to Change.

The group votes with sticky dots (dot voting) and deals with the quick wins first. A quick success shows the participants that the session takes decisions.

The owner of a rule often has reasons for it. The owner listens to the criticism without getting defensive. The facilitator asks for the reasons at decision time and not during the note-writing step. A reason that convinces the group moves the rule to Keep or to Change.

The group sometimes does not know whether a removal improves the work or creates other problems. It then kills the rule on trial until a review date. On that date, the owner asks who missed it. If nobody missed it, the removal becomes permanent. A trial kill removes the rule for everyone. The futurethink pilot applies a new rule to a small group.

Committing and reviewing

The session ends with the futurethink commit list. Each line names the rule, the decision, an owner and a deadline.

Bodell reports the case of HBO's distribution department (200 people), which capped its meetings at one hour. At McGraw-Hill, senior leadership put the monthly operating reports on hold for six months and then dropped them. This second case shows a trial kill.

The owner reports on progress on a date set in the session. A session without follow-up teaches the participants that the question was not serious. At HBO, the proposals went into a shared document that everyone could comment on and add to. The department's executive vice-president gave updates on the killed rules at her team meetings.

A killed rule sometimes leaves a need unmet. The group often puts a new rule in its place. That replacement can be progress. The group checks that the new rule weighs less than the one it replaces. It designs the next step with another technique. When the rule lives in a system, business rules analysis documents the new version.

AI considerations

After the note-writing step, a language model groups duplicates worded differently and counts the mentions. It rephrases each complaint as a testable rule, a task the facilitator otherwise does by hand. For a rule the group sends to Change, it suggests the likely purpose and two or three lighter means. The group keeps or discards these suggestions.

An assistant connected to the collection of internal directives finds the text behind a rule that someone claims is a legal requirement. It cites the directive and its article. It does not decide whether the rule is red. The legal department or the data protection advisor interprets the law.

The model does not know which rules hinder the teams. A list of "stupid rules" it generates describes an average organisation. It does not replace the note-writing step. The notes often name colleagues, customers or incidents. Whoever hands them to an external service first anonymises them and uses a tool approved by the organisation.

Examples

The HR department of a Lausanne insurer held a one-hour session with eleven participants from four departments. Each participant wrote one note. The mentions in the register add up to eleven.

No.RuleMentionsColourImpactEaseDecisionOwnerReview
R1Each team sends a weekly activity report to management.4GreenHighHighTrial kill: report suspended for six monthsHead of HRAfter six months
R2The department head signs every expense claim from CHF 1.3GreenHighHighChange: signature from CHF 500 and spot checks belowHead of FinanceAfter three months
R3A request for IT equipment goes through three approvals.2GreenMediumLow (workflow configured in the ticketing tool)Pilot: one approval for the claims teamHead of ITAfter three months
R4Time records are kept for five years.1Red (Art. 73 para. 2 ArGV 1)––Keep: the ordinance requires working-time records to be kept for at least five yearsLegal counsel–
R5Two people sign every employment contract.1GreenLowMediumKeep: the second signature checks the salary against the internal pay scaleHead of HR–
Decision register of the session. Each rule receives its number of mentions, a colour, a decision and an owner. The green rules also carry their place on the grid.
The impact and ease grid
Rules of an HR department
Green rules
highEase of removallow
Quick wins
R1Weekly reportTrial kill
R2Expense claim signatureChange
R3Three approvals for IT equipmentPilot
R5Second signature on the contractKeep
lowhigh
Impact of removal
Red rules
R4Time recordsKeep (ArGV 1)
The group places the quick wins at top right: the high-impact rules that are easy to kill. The red rule stays outside the grid.

R5 is green and stays. The group named its purpose and judged it valid. Green says that the rule can change. It does not say that it must.

Visualisations

On the wall, each rule fits on a sticky note. A red or green dot marks its colour. The green notes go on the impact and ease grid. The red notes stay in a separate strip. The decision register is kept as a table with one row per rule. It then becomes the follow-up list for the reviews.

Cost

PhaseLevelJustification
PreparationLowSet the scope, form mixed teams and make sure a decision-maker attends. An anonymous note-writing step before the session adds a form.
ExecutionLowOne one-hour session: team discussion, sort, grid, vote and register.
DocumentationMediumThe register is quick to write. The reviews of trial kills and pilots stretch over several months.

Tooling

A flipchart, sticky notes and red and green dots are enough in the room. The grid is drawn with a marker on two sheets. An online whiteboard such as Miro or Mural reproduces the set-up for a remote team. It also allows anonymous notes and dot voting.

An online form collects the rules before the session when the hierarchy holds people back from speaking. The decision register lives in a spreadsheet or in the team's task tracker, one row per rule with its review date.

Sources

Lisa Bodell is the author of Kill a stupid rule. The sources are her book, her firm's toolkit and her article that sets out the steps.

  • Bodell, L., Kill the Company: End the Status Quo, Start an Innovation Revolution, Bibliomotion, 2012: the book in which the technique originates.
  • futurethink, "Kill a Stupid Rule": split between non-negotiable rules and habit rules, impact and ease grid, four decisions and commit list. Online page.
  • Bodell, L., "How to encourage innovation by upending rules", Duke Corporate Education, 2016: opening question, mixed teams, ten minutes of discussion, red and green rules, impact and ease grid, trial kill, HBO and McGraw-Hill cases. Online article.
Kick-off meeting
All techniques
Kolb's Learning Cycle