Your Training Partner
Techniques Toolbox
Two ellipses overlap. The left ellipse reads "More standardisation". The right ellipse reads "More local customisation". The intersection reads "More of both". Arrows lead from both ellipses into the intersection. Under each zone is its letter in the book and on the site: A and A on the left, B and C in the centre, C and B on the right.

Integrated~Autonomy

Integrated~Autonomy is a meeting structure from Liberating Structures. Leaders from head office and from the local units examine one tension together: standardise or let each unit customise. The group lists the activities where this tension is felt and chooses one. It looks for actions that standardise the activity, then for actions that customise it. Finally it looks for actions that give more of both and ranks the most promising. Henri Lipmanowicz and Keith McCandless describe the structure in The Surprising Power of Liberating Structures (2013) and on their site. The book allots it 80 minutes. The site gives about 70.

Goal

Integrated~Autonomy moves a group from an "either-or" conflict to "both-and" solutions. The conflict sets integration against autonomy. Integration means what the centre sets for all units: the rules, the standards, the control. Autonomy means what each unit decides to fit its local conditions. The book asks: "What mix of integrative control and autonomous freedom will advance our purpose?" and "Where do our needs for global fidelity and consistency meet the needs for local customization and creative adaptability?"

The structure helps to design strategies for moving forward. It keeps a policy, a programme or an organisation from swinging abruptly into its opposite. The group identifies the pairs of complementary yet paradoxical needs that matter to it. The structure also tests a decision with one question: "Are we boosting or attending to both sides?"

The structure produces the completed worksheet and the list of "more of both" actions that the group has ranked. The site adds a follow-up plan: the next steps and the date on which the group will evaluate progress.

The business analyst meets this tension in any project that rolls out a shared model across several units: a group ERP, a process harmonised across subsidiaries, a platform shared between cantons. Integrated~Autonomy brings into one workshop the head office that defends the shared model and the units that ask for adaptations. The actions the group keeps feed the requirements of the shared model and the gap analysis. You'll find out how to nest and string structures in the Liberating Structures fiche.

Usage

When to use it

  • A shared model to roll out across several units: establish what head office sets and what each unit customises before writing the requirements.
  • Swings between centralisation and decentralisation: break out of the back-and-forth between the two policies.
  • A central standard that the units work around or ignore: work out with the units what stays common and what they customise.
  • A local solution that does not scale: look for what can become common without taking away the site's room for manoeuvre.
  • A decision that affects the centre and the units: check that it strengthens both sides.
  • Common rules and local decisions in a hospital network or a multi-level administration: divide what the centre sets from what each hospital or canton decides.
  • Tension between collaboration and competition (between teams or subsidiaries): replace the integration and autonomy pair with this one.
  • After Purpose-To-Practice and Drawing Together: specify how dispersed sites work together.
  • A distributed team: run the session in 1-3-All with a digital template per group.

When not to use it

  • An exclusive choice between two options (one system or the other): the structure has nothing to combine. Compare the options in a decision matrix.
  • A rule set by law or by a regulator: the rule itself offers no local room for manoeuvre. Document the rule with business rules analysis.

Description

Integration and autonomy

The structure starts from a tension between two valid needs. The centre wants the same rules, the same data and the same control in every unit. Each unit wants to adapt its work to its customers, its size or its language. The two sources use two pairs of words: standardisation and customisation, integration and autonomy. Standardising serves integration. Customising serves autonomy.

The book sets the goal: a few rules that are identical across the whole group and differences in each unit. The group looks for actions that strengthen both poles.

The creative tension between the centre and the units stays hidden at first. The group brings it out activity by activity.

The worksheet

The group works on a sheet shaped as a Venn diagram. The left ellipse holds the actions that standardise the activity. The right ellipse holds the actions that customise it. Their intersection holds the actions that give more of both. The group fills the intersection. In the book's version it moves actions there from the other two zones.

More standardisationintegration
Book: ASite: A
More of both
Book: BSite: C
More local customisationautonomy
Book: CSite: B
The group fills the intersection. In the book it moves actions there from the two outer zones. The book and the site give the zones different letters.

The book and the site give the zones different letters. The facilitator avoids confusion by naming the zones by their content: "more standardisation", "more of both", "more local customisation".

From zones to requirements

In our practice each zone of the worksheet yields one type of requirement. The standardisation zone yields the common requirements of the shared model. The customisation zone yields local variants that the analyst records per unit in the gap analysis. The intersection yields a common requirement with a parameter that each unit sets within a range.

The elements of the structure

The authors describe each structure through five design elements. Their site revises the 2013 book version.

ElementBook (2013)Authors' site
Structuring invitationWill our purpose be best served by more local autonomy, customisation, competition and freedom among the units? By more integration, standardisation and control? Or by both?Have you felt the tension between standardisation and customisation? How do we integrate at the centre while we strengthen local autonomy? The group will move from "either-or" to "more of both"
Space and materialsGroups of four chairs with or without small tables. One worksheet per participant and a large one on the wall. Paper for recording the activities and the actionsGroups of four chairs around small tables. A worksheet template and a pen per participant
How participation is distributedAll the central and local unit leaders involved in the challenge. Everyone has an equal opportunity to contributeA facilitator and the participants. No minimum group size. Everyone involved at the centre and in the field. Everyone has an equal opportunity to contribute
How groups are configuredAlone to generate the topics, in groups of four, as a whole group1-2-4-All
Sequence of steps and time allocationEight steps, 80 minSeven steps, about 70 min
Zone lettersA standardisation, B both, C customisationA integration, B autonomy, C both
The design elements of Integrated~Autonomy according to the 2013 book and according to the authors' site.

The steps according to the site

  1. Introduction (1 min): the facilitator reads the invitation and hands out the worksheet template. They display the steps.
  2. List of activities (3 min): alone, each person lists the activities where integrating or centralising the work is in tension with local customisation or autonomy. The site gives the example of a doctor who reconciles evidence-based recommendations with each patient's decisions.
  3. Merging the lists (7 min): in pairs, the participants combine the main points of their lists.
  4. Actions on both sides (10 min): the pairs form groups of four. Each group chooses one activity. It looks for actions that integrate the activity and actions that customise it.
  5. New actions (20 min): the groups of four look for actions that increase both integration and autonomy. They place them in the intersection.
  6. Priorities (15 min): in plenary, everyone reviews the intersections and picks out the most promising actions.
  7. Follow-up (15 min): the group plans the follow-up and sets the date on which it will evaluate progress.

The steps add up to 71 minutes. The site states about 70. Its visual groups the steps: 3 minutes alone, 7 in pairs, 30 in groups of four and 30 in plenary.

The steps according to the book

  1. Presentation (5 min): the facilitator introduces Integrated~Autonomy as applied to the challenge at hand. They ask: "How is it that we can be more integrated and more autonomous at the same time?" They keep examples from past experience ready.
  2. Activities in tension (10 min): in 1-2-4-All, the group lists the activities that require attention. The question: "Where is there tension between our desire to standardize and the request for more customizing or autonomy?"
  3. Reasons (10 min): each group of four chooses one activity from the list. It works out which reason pushes towards standardising and which reason pushes towards customising.
  4. Actions (10 min): in 1-2-4, the participants look for actions that standardise, then, in a second 1-2-4, for actions that customise.
  5. Actions that serve both (5 min): "Which actions boost both standardization (group A) and customization (group C)?" The book's question is elliptical. On our reading it targets the actions on the two lists that already serve both sides.
  6. Moving into the intersection (15 min): "What modifications or creative ideas can be adopted to move some actions from group A to group B or from group C to group B?"
  7. Priorities (10 min): in 1-2-4-All, the group ranks the most promising actions that serve both integration and autonomy.
  8. Refinement (15 min): the group refines the actions it kept with 15% Solutions and with Wise Crowds or Troika Consulting.

The book first has the group set out the reasons to standardise and the reasons to customise. The site goes straight to the actions. The book looks for the "more of both" actions in two passes: it identifies those that already serve both sides, then it modifies the others. The site looks for them in a single pass. The book ends by refining the actions with other structures. The site ends with a dated follow-up plan.

Search for actions that serve both sides
Book (2013): 80 min
5
Activities in tension10 min1-2-4-All
Reasons10 mingroups of four
Actions10 min1-2-4
5
Moving into the intersection15 min
Priorities10 min1-2-4-All
Refinement15 min
PresentationActions that serve both
Authors' site: 71 min
3
7
Actions on both sides10 mingroups of four
New actions20 mingroups of four
Priorities15 minplenary
Follow-up15 minplenary
Introduction1 minList of activities3 minaloneMerging the listspairs
01020304050607080min
Book (2013): 80 min
  • Presentation5 min
  • Activities in tension1-2-4-All10 min
  • Reasonsgroups of four10 min
  • Actions1-2-410 min
  • Actions that serve both5 min
  • Moving into the intersection15 min
  • Priorities1-2-4-All10 min
  • Refinement15 min
Authors' site: 71 min
  • Introduction1 min
  • List of activitiesalone3 min
  • Merging the listspairs7 min
  • Actions on both sidesgroups of four10 min
  • New actionsgroups of four20 min
  • Prioritiesplenary15 min
  • Follow-upplenary15 min
The book has eight steps and 80 minutes. The site has seven steps and about 70 minutes. Both versions give 20 minutes to the search for actions that serve both sides.

Running the session

The opening question gives both sides the same weight. The facilitator avoids a question that puts the blame on one side: "How does our effort to be ONE integrated organization squash local autonomy?" They ask instead: "How is it that we are both integrated and autonomous in our current operations?" To build a balanced question on another pair, see Wicked Questions.

The facilitator prepares examples from past experience: a situation in which the organisation gained more consistency and more freedom at the same time. During the session they ask: "How can we do more of both?" They come back to the opening question as the steps go on.

When the group gets stuck or starts to argue, the facilitator asks each side to argue the other side's point of view. Laughter and groans signal progress.

Each group of four chooses its own activity. With four groups, the plenary may rank actions drawn from four activities. The facilitator therefore decides whether the groups share one activity or each take their own.

A senior manager from head office in the room can silence the unit leaders. The steps in which each person works alone and then in pairs let each unit write before anyone speaks. These two points come from our practice.

A novice facilitator keeps to the basic structure. An experienced facilitator may adapt it.

Online

The site replaces 1-2-4-All with 1-3-All: the participants work alone, then in threes, then in plenary. The trios stay together to look for actions. Each group gets a digital version of the template in a visual collaboration space. A technical host assists the facilitator.

What makes Integrated~Autonomy fail

With an accusing question, the side it targets spends the session defending its position. The facilitator rewords the question before the group starts the list of activities.

With only one side in the room, nobody checks that an action serves the other side. The structure invites all the central and local leaders involved in the challenge. The facilitator checks the invitations against the stakeholder list.

A compromise filed in the intersection gives the group the illusion that it has served both sides. For each action in the intersection, the facilitator asks what it brings to the centre and what it brings to the units. An action that takes something away from both goes back to its zone. This check is a practitioner's addition.

The urge to move everything into the intersection contradicts the book's goal: to keep only a few rules identical. An action that sets one of those rules stays in the standardisation zone. An action that concerns only one site stays in the customisation zone.

Expecting a solution in one session discourages the group. The book warns that there are often no quick fixes. It advises running several experiments in parallel and returning to the challenge with further rounds of Integrated~Autonomy.

A list with no follow-up leaves the group where it was. The facilitator reserves the last 15 minutes for the follow-up plan or for refinement.

Variations

One variation replaces integration and autonomy with collaboration and competition. The worksheet then serves teams or subsidiaries that cooperate and compete with each other.

Integrated~Autonomy in strings

SourceStringPurpose
Book (Field Guide, last step)Integrated~Autonomy, then 15% Solutions with Wise Crowds or Troika ConsultingRefine the actions the group kept
Book (Field Guide, variations)Integrated~Autonomy, then Min SpecsWhen what helps on one challenge applies to the whole organisation: spell out what must be done and what must not be done
SiteIntegrated~Autonomy, then Min Specs and Nine WhysMin Specs sets what a "more of both" solution must do and must not do. Nine Whys links a tactical solution to the group's strategic goals
Book (chapter 6, spreading an innovation)Purpose-To-Practice, then Drawing Together, then Integrated~AutonomyDesign an organisation with shared ownership. Imagine how it runs in an integrated and autonomous way. Specify the work across dispersed sites
The strings that the authors propose around Integrated~Autonomy and their purpose.

The book also pairs Integrated~Autonomy with 15% Solutions, What I Need From You and the Agreement-Certainty Matrix. Wicked Questions applies the same logic to any pair of opposing forces. Integrated~Autonomy focuses it on the pair of central control and local freedom.

Origin

Henri Lipmanowicz and Keith McCandless developed Integrated~Autonomy. They link it to the sixth principle of Liberating Structures: Amplify Freedom and Responsibility.

Management research also studies these lasting tensions. Wendy Smith and Marianne Lewis (2011) observe that organisations face contradictory demands. They propose a model in which cyclical responses to paradoxical tensions sustain an organisation over time.

AI considerations

Before the session, the facilitator can ask an AI assistant for examples of "more of both" actions in the group's field. They keep the ones that the participants will recognise. The book asks for examples from past experience. The organisation's own examples speak to the group more than the assistant's.

During the search, a group of four can give the assistant one standardising action and one customising action. The assistant proposes combinations fast. It does not know whether head office will accept them or whether the units will apply them: only the two sides in the room can judge that. The assistant also tends to propose halfway compromises. The facilitator puts its proposals through the same check as the others: what does the action bring to the centre and to the units?

After the session, the assistant transcribes the photo of the wall sheet into a table: the action, its zone, its rank and the agreed follow-up. The group checks each line.

The activities in tension often name sites, departments or managers. The facilitator submits them only to an AI service that their organisation authorises. The authors say nothing about AI. These uses rest on practitioner judgement.

Examples

In this constructed case, an industrial group prepares a shared ERP for its four production sites. The purchasing managers from head office and from the sites work on the activity "equipment purchasing". They follow the book's version and finish with the site's follow-up plan. The worksheet shows the actions after the move into the intersection.

Constructed case: equipment purchasing, industrial group and four sites
More standardisation
  • Group item codes on all sites
  • Single supplier catalogue
  • Single approval workflow
More of both
  • Common catalogue for the strategic purchase categoriescomes from Single supplier cataloguecomes from Each site chooses its suppliersmodified
  • Common approval workflow with local thresholdscomes from Single approval workflowcomes from Each site sets its approval thresholdsmodified
  • Suppliers tested by a site added to the group cataloguecomes from Each site adds the suppliers it has tested to the catalogueunchanged
More local customisation
  • Purchasing documents in the site's language
  • Each site chooses its suppliers
  • Each site sets its approval thresholds
  • Each site adds the suppliers it has tested to the catalogue
Constructed case. The purchasing managers of an industrial group and its four sites fill in the worksheet for equipment purchasing. Three actions move into the intersection. Two arrive there after modification and the third unchanged. The item codes stay standard. Each site keeps the choice of language for its documents.

The group then ranks the three actions in the intersection and decides on the follow-up.

Rank"More of both" actionThe group setsEach site decidesFollow-up and review
1Common approval workflow with local thresholdsThe workflow and a threshold range of CHF 5'000 to CHF 20'000Its threshold within the rangeTrial on two sites. Review after three months
2Common catalogue for the strategic purchase categoriesThe strategic categories and their suppliersIts suppliers for the other categoriesThe purchasing department approves the list of categories. Review after six months
3Suppliers tested by a site added to the group catalogueThe catalogue and its admission criteriaThe suppliers it proposesHead office drafts the admission criteria. Review after six months
Constructed case. The three "more of both" actions ranked by the purchasing managers. Each action states what the group sets and what each site decides.

Each action in the intersection shares the decision: the group sets the limits and the site decides within them. The item codes stay in the standardisation zone. The ranked actions become requirements of the ERP's shared model. The threshold in action 1 is the parameter of an intersection requirement: each site sets it within the range.

Visualisations

A first diagram shows the worksheet and the letters of its zones in the book and on the site. A second places the two sequences of steps on one time axis. A third shows a completed worksheet. The elements of the structure, the strings and the ranking of the actions are tables.

Cost

PhaseLevelJustification
PreparationMediumBring together the leaders from head office and from the units. Prepare examples from past experience. Print the worksheets.
ExecutionMedium80 minutes according to the book and about 70 according to the site. All the leaders involved take part. Further rounds if the challenge calls for them.
DocumentationLowPhotograph the worksheets. Keep the list of ranked actions with their follow-up and their review date.

Tooling

In the room, each participant gets a printed worksheet and a pen. A large sheet on the wall collects the actions from the plenary on sticky notes. A visible timer keeps the steps on time.

Remotely, a video conference with breakout rooms (Zoom, Microsoft Teams) hosts the trios. A shared whiteboard (Miro, Mural) carries each group's template.

A spreadsheet holds the list of ranked actions. On the review date the group checks the agreed follow-up in the spreadsheet.

Sources

Inspection
All techniques
Interface Analysis