Informal Walkthrough
The informal walkthrough is a review session the author runs himself: he walks through his work product in its draft state in front of a group of peers and asks for their feedback. Reviewers may do minimal preparation before that joint session (BABOK §10.37.3.2). Wiegers puts the author in the leader's role and in the material presenter's role (Table 3-2), and he sums up the contrast: where an inspection serves the team's quality objectives, a walkthrough principally serves the needs of the author. His table of objectives grants seven to the walkthrough, eight to the inspection and five each to the desk check and the pass around (Table 3-3).
Goal
In an informal walkthrough the author walks through his work product in its draft state in front of a group of peers and collects their feedback (§10.37.3.2). Of BABOK's seven reviews, it is the only one whose definition names that state.
BABOK lists seven objectives for a review (§10.37.3.1). The informal walkthrough serves five of them.
Remove defects: Wiegers marks that row for all six methods in his table (Table 3-3). Ensure the work product is complete and correct: the same table marks that row for the inspection and the walkthrough only. The group takes the draft end to end, and the case with no step anywhere announces itself.
Establish consensus on an approach or a solution: Wiegers marks that row for three methods, the team review, the walkthrough and pair programming (Table 3-3). Holding a session is therefore not enough, since the inspection holds one and is not marked there. He gives the mechanism on p. 3-6: the group looks for problems and at the same time builds a shared understanding of the purpose, structure and implementation of the object presented. Table 3-2, on the other hand, withholds any product appraisal from the walkthrough, and an agreement that has to be evidenced belongs to a formal walkthrough (10.37b). Explore alternatives: authors use walkthroughs, he writes, to test their ideas and brainstorm alternative solutions. Educate reviewers about the content: a walkthrough is appropriate, he writes again, when a prime review objective is to educate others about the product.
BABOK's objective that carries the exploration of alternatives contains two others, answer a question and resolve an issue, and the informal walkthrough does not take them. A bounded question is put to an available peer and settled in minutes: that is the home ground of the ad hoc review (10.37g). A draft, by contrast, has options, and options need people to set them against each other.
Two of the seven are out of its reach. Check conformance to a specification or a standard: both conformance rows of Table 3-3 are empty for the walkthrough. Table 3-2 gives the reason: the technique uses no defect checklist. A reader alone checks conformance, holding the document and the standard, in a desk check (10.37e) or a pass around (10.37f), to which Wiegers grants both rows. A single issue review (10.37c) settles the matter when one standard is at stake. Measure work product quality: Table 3-3 reserves that row for the inspection, and Wiegers writes that walkthroughs typically generate no metrics. A measurement presupposes a defect log, so an inspection (10.37a).
Among the objectives BABOK's list does not carry, Wiegers marks one for a single one of the six methods he compares, this one: simulate the execution of a program (Table 3-3). He writes "program"; extending the row to a process model or a requirements specification is our reading. Another one is missing from the walkthrough: assess how understandable the document is. After a walkthrough, he writes, you are not sure whether you understood the material because it was well structured or because the author presented it clearly. The author's presence is what lets this review educate a group and what stops it testing comprehension, which Table 3-3 grants to the pass around (10.37f), where readers meet the document without him.
The session produces nothing but the scribe's notes. BABOK lists the scribe among the roles applicable to this review (Table 10.37.1). It gives him the task of documenting the defects, suggestions, comments, issues, concerns and outstanding questions raised during the session. Nothing else comes out: no defect log, no product appraisal, no decision. The author corrects, and nothing in the technique closes the loop.
Usage
When to use it
- The work product is a draft: of BABOK's seven definitions, this is the only one that names that state (§10.37.3.2).
- The author wants to test options rather than have defects reported: Wiegers marks the exploration of alternatives for two methods only (Table 3-3).
- The group has to agree on what the document means: Wiegers marks consensus for three methods, this one among them (Table 3-3).
- A group has to be educated about a work product: Wiegers sees the technique's own case there (p. 3-6).
- A concrete case has to be walked end to end in front of the people who live it: that is one of the strategies Wiegers describes (p. 3-6).
- What is missing matters more than what is wrong: Wiegers gives completeness to the inspection and the walkthrough alone (Table 3-3).
- No record is required: nothing comes out of the session but the scribe's notes.
- The room is free to contradict the author out loud: without that freedom the session confirms the draft instead of testing it.
- A synchronous session is workable: the technique needs a room, physical or by video conference, with the draft shared on screen.
- The decision at stake is worth an hour of several people: the cost is paid in one block, in session.
When not to use it
- A record or evidence of a reading is required: an inspection (10.37a) logs the defects and verifies the rework.
- The question is whether the document reads on its own: a pass around (10.37f) puts independent readers in front of the same text.
- Conformance to a specification or a standard has to be checked: a desk check (10.37e) does it; a single issue review (10.37c) settles the matter when one standard is at stake.
Description
Running the session
Wiegers writes that walkthroughs typically follow no defined procedure: lacking one, practitioners run them in ways that range from casual to disciplined. He does describe what happens in a typical walkthrough.
The author's walkthrough. The author presents his work product to the group: what it does overall, how it is structured, how it accomplishes its tasks, the logical flow, its inputs and its outputs (p. 3-5). Wiegers is speaking of a code module or a design component; the same questions apply to a process model, a use case or a specification. The group looks for problems in it and builds a shared understanding of the object's purpose, structure and implementation.
Walkthrough strategies. Beyond that, Wiegers names two particular strategies. The programmer, in the old days, stepped through the execution of a module in front of his peers, with sample data, while they checked its logic and its behaviour; the interactive debugger has taken that place, he notes. The other strategy is to follow a scenario that describes a specific task or case, to show how the system would function during a sample user session (p. 3-6). This second strategy serves the business analyst directly: it helps a group of customers, analysts and developers agree on the system's behaviour. Wiegers writes that it can also reveal errors in upstream deliverables, requirements specifications for instance.
A draft read out loud, section after section, produces nodding heads. The same draft walked through with a concrete case produces the place where the case stops.
Choosing the case. The quality of the draft and the case chosen decide what the room can find. The author therefore takes the case that crosses the most branches rather than the one that runs without incident: a patient admitted as an emergency teaches more than a patient who reports to the desk. When the first case is the nominal path, a second walkthrough is warranted, on a case picked for the place where the draft hesitates.
The size of the room. Wiegers writes that a walkthrough can include more people than can take part effectively in an inspection. The price is paid in silence: the number of people who can stay quiet without it being noticed grows with the room. The author therefore invites the people who have a case that will break the draft, and he himself draws out the ones who have said nothing.
After the session. The author leaves with the scribe's notes and corrects the draft himself (Table 3-1, correction: yes). Nothing verifies the rework (verification: no), so he goes back through his notes line by line and settles each item: corrected in the draft, set aside with its reason or carried elsewhere. The options the room put on the table without choosing between them call for a decision that does not belong to this review. The author refers those options to whoever takes that decision.
One activity delivers three of the five objectives. The case with no step anywhere in the draft is completeness. The step that admits two defensible answers is the options. The word two departments use in two senses is the consensus.
Where the informal walkthrough sits
BABOK lists its seven review types in decreasing formality and calls the first three formal techniques, the next four informal techniques (§10.37.3.2). Two questions cut across that ordering. Is the session planned? Does the reviewer examine the work product alone before speaking? The informal walkthrough answers yes, then no. No other cell answers that way. That signature is its boundary with its neighbours. The session is convened, whereas an ad hoc review (10.37g) is held without being convened. The reviewer may come into it having done minimal preparation, whereas a desk check (10.37e) and a pass around (10.37f) consist entirely of that reading.
The name itself is standard: walkthrough is one of the nine review types ISO/IEC 20246:2017 lists in clause 5.3, alongside the peer desk check. The clause presents them as the ones commonly referenced in the literature and found in IEEE 1028. It announces an Annex E that describes the alignment of the activities the standard defines with the procedures of IEEE 1028-2008. The standard groups the informal types differently: NOTE 1 to 6.5 holds formal documentation to be rarely required for the peer desk check and four other types, not for the walkthrough.
The roles in the room
The author presents. Wiegers puts him in the leader's role and in the material presenter's role, and of the three types his table compares, the walkthrough is the only one in that position (Table 3-2). The other review roles, he adds, are usually not defined in it. BABOK lists the scribe among the roles applicable to this review and lists no facilitator for it (Table 10.37.1). Of the seven review types, it stands alone in this: the session is written down, and nobody is charged with overseeing it.
| Review type | Facilitator | Scribe |
|---|---|---|
| Inspection (10.37a) | Yes | Yes |
| Formal walkthrough (10.37b) | Yes | Yes |
| Single issue review (10.37c) | May be helpful | No |
| Informal walkthrough (10.37d) | No | Yes |
| Desk check (10.37e) | No | No |
| Pass around (10.37f) | No | No |
| Ad hoc review (10.37g) | No | No |
BABOK does not set these two columns side by side. It does name, though, what the informal walkthrough traded away for its speed: the facilitator, in that same table, has the task of validating that the reviewers have examined the work product before the session and of ensuring that each of them takes part. The technique's definition drops those two obligations, since it allows reviewers minimal preparation. Nobody here answers for them.
The traps
The room goes quiet
Wiegers says: when you do not fully understand what is being presented, you tend to gloss over it and assume the author is right. It is easy to be swayed into silence by an author's rationalization of his approach, even if you are not convinced. Yet a reviewer's confusion, he adds, is sometimes a clue that a defect lurks nearby. Table 10.37.1 charges the facilitator with making all the reviewers take part, and this review has none. BABOK holds that a review is focused on the work product and not on the skills of the participants (§10.37.2). The precaution counts here more than anywhere, with the author standing in front of the group, presenting his own work.
The group sees only what it is shown
The author decides the granularity of what he presents (Table 3-2). Wiegers draws the warning from it: drawing the reviewers' attention to the portions that were changed risks overlooking the ones that should have been changed and were not.
The session taken for evidence of a reading
Six people were in the room, so "the document was reviewed". Nobody validated that a single one of them had opened the draft. Evidence of an independent reading takes a defect log and a verification of the rework, which is to say an inspection (10.37a).
Sliding into a formal walkthrough without deciding to
The day a facilitator is appointed, the day individual reading is required before the session and the day a product appraisal comes out of it, a formal walkthrough (10.37b) is being held. Better that it be a choice than a drift. A finding that has to survive the session belongs to item tracking (10.26).
AI considerations
This review's own weakness: the author is in the room. A large language model is useful exactly there. It is taken for the room itself just as easily.
Rehearsing the walkthrough
A model can walk the case through before the group does: the step with no alternative branch, the actor cited at step eight and never introduced, the case with no step anywhere in the draft. The group then spends its hour on what only it can see.
Being the reader who was not in the room
A model reading the draft cold produces the one reading the session cannot produce, the one where the author explains nothing. That does not make it a pass around (10.37f): in that review, Wiegers writes, understandability is judged by people who occupy different positions and who have something at stake. A model occupies no position. Its reading prepares the session, it does not replace it.
The illusion of an independent reading
Nobody validates that the reviewers examined the work product, and a well-kept list of findings, out of a machine, makes it look as though the reading took place. Consensus is out of its reach for the same reason: the session produces the agreement of the people who will have to live with the process. A model that picks between two options has not weighed them, it has hidden that there were two.
Data protection
A hospital admission process carries patient data. The revised Federal Act on Data Protection (revFADP) comes before productivity. The organisation's rule is fixed before the session: which model, which data, hosted where.
Examples
An informal walkthrough produces a scribe's notes, taken while the author was walking a case through in front of the group.
| Step in the draft | Raised by | What was said in the session | Kind |
|---|---|---|---|
| Step 1, "the patient reports to the admissions desk" | Nursing | "An emergency patient does not arrive through the desk. The draft has no other entry point." | Open question |
| Step 1, two possible entry points | Admissions · Billing | "Open a provisional file at triage, completed afterwards." / "Enter the admission after the fact, from the care file." The room put both on the table; it did not settle them. | Options |
| Step 3, "read the AVS number from the insurance card" | Admissions | "A newborn has no AVS number yet and is admitted with the mother." | Defect |
| Step 5, "check LAMal cover" | Billing | "Online at admission or deferred to billing." Care does not wait for the cover: both options hold, the cost is not the same. | Options |
| The word "admission" | the whole room | "Administrative registration" for admissions, "the patient's arrival on the ward" for nursing. The room agreed on administrative registration. | Point agreed in the session |
| No step | Social services | "A patient resident outside the canton appears nowhere in the flow, although the stay requires a guarantee of payment from the canton of residence." | Defect: case absent from the model |
| Step 8, financial guarantee | Billing | "The draft freezes at CHF 5'000 the guarantee asked of an uninsured patient. That is a departmental parameter." | Suggestion |
The "Raised by" column does not appear in BABOK's list. It makes the notes usable after the session: the author who goes back to an option knows who to put it to again.
The case absent from the model surfaced because the group heard the flow end to end. The author corrects it himself, and nothing in the technique checks that he did. The findings live in the scribe's notes, which are the trace of a session and not the proof that a reading took place.
Visualizations
The formality spectrum is a spatial object: seven types placed on an axis, two marks per cell. The informal walkthrough's signature on the two gates belongs to no other cell. Rendered as a table, it would lose the axis and the isolation of the cell.
The roles applicable to the seven reviews are rows and columns, read by scanning, and they come from a single BABOK table. No axis and no position enters that reading, so the table is enough.
The artefact carries the scribe's notes, qualified by the enumeration BABOK entrusts to him (Table 10.37.1). One kind is added to it: the options, which that list does not carry and which walking a concrete case through brings out. The choice between the seven reviews is handled in reviews (10.37).
Cost
| Phase | Level | Justification |
|---|---|---|
| Preparation | Medium | Wiegers counts planning in this technique (Table 3-1). In practice the author fixes the date, gathers the participants and prepares his walkthrough. The reviewers prepare nothing (Table 3-1, preparation: no), and BABOK writes that they may do minimal preparation. |
| Execution | Medium | One session, several people in the same room at the same time. The cost of the session is multiplied by the number of participants. It is paid in one block. Wiegers lets a walkthrough include more people than an inspection can and sets no ceiling, so the room is what makes the cost vary. The duration follows the case walked through rather than the volume of the draft. |
| Documentation | Low | The scribe's notes, taken in session. No collation, no defect log, no product appraisal, no metrics (Table 3-2). The author corrects, and nothing in the technique closes the loop (Table 3-1, correction: yes, verification: no). |
Tooling
The informal walkthrough needs a room, the draft on display, a case to walk through and somebody who writes. Wiegers marks the recorder as a maybe (Table 3-2) and BABOK lists the scribe among the applicable roles (Table 10.37.1): the only tooling decision is who writes. It is taken before the session.
Table 3-2, on the other hand, counts no defect checklist for this technique. The day you want one, you have chosen another review, a desk check (10.37e) for instance. And a finding that has to live beyond the session leaves the notes for item tracking (10.26), with an owner and a deadline: the scribe's notes track nothing, they say what was said.
Sources
- IIBA, A Guide to the Business Analysis Body of Knowledge (BABOK Guide) v3, §10.37 Reviews (§10.37.2, what the review is focused on; §10.37.3.1, the seven objectives; §10.37.3.2, the seven types; Table 10.37.1, the roles).
- Karl E. Wiegers, Peer Reviews in Software: A Practical Guide, Addison-Wesley, 2002, chapter 3, "Peer Review Formality Spectrum" (Table 3-1, activities by review type; Table 3-2, inspection, team review and walkthrough compared; Table 3-3, objectives and methods).
- ISO/IEC, ISO/IEC 20246:2017, Software and systems engineering: Work product reviews.
- IEEE, IEEE Std 1028-2008, IEEE Standard for Software Reviews and Audits.