Your Training Partner
Techniques Toolbox
A room seen from above. Three players act on a stage in the centre. Four small groups of observers surround them. The explanation and the scenario description last 5 minutes and happen only once before the first scene. A loop shows the book's timings. Volunteers act out the scene in front of everyone in 3 to 5 minutes. Each group debriefs with 1-2-4-All in 5 minutes. Each group assembles its prototype and acts it out for itself in 5 minutes. One group acts out its version in front of everyone in 3 to 5 minutes. A question follows: is a version good enough to be put into practice? Yes leads to putting it into practice. No leads back to the debrief for a new round.

Improv Prototyping

Improv Prototyping is a Liberating Structures meeting structure. A few volunteers act out a scene in front of the group. The scene comes from a chronic problem in their work. The other participants observe in small groups. Each group spots the pieces of the scene that worked, assembles them into a new version and has it played. The group repeats the loop until it has a version good enough to be put into practice. Henri Lipmanowicz and Keith McCandless describe the structure in The Surprising Power of Liberating Structures (2013). The book allows 20 minutes per round.

Goal

Improv Prototyping is a meeting structure in which a group acts out a work situation that causes problems and improves its response by playing it again.

The book intends it for chronic problems and frozen behaviour: a hygiene rule that nobody applies, a conversation that everyone dreads, a client the team does not know how to approach. Through play, the participants discover behaviours that solve the problem. The authors call the structure "a rehearsal for real life".

At Kelowna General Hospital (Canada), nurse Sherry Belanger had nursing students act out a scene in which a physician enters an isolation room without protection. Three weeks later, a student challenged a physician who was entering such a room without a gown or gloves. The physician did not stop. The student nevertheless stood up to him without being intimidated. She said that she might not have spoken up without the scene.

The structure produces a prototype: the sequence of gestures and lines that the group saw succeed on stage. In our view, the business analyst notes the gestures and lines that the group kept. These gestures and lines describe the target interaction between two roles and feed the description of the target process, the business rules or the training that goes with the go-live.

Prototyping builds a mock-up of a screen or a product and has users try it. In Improv Prototyping, the prototype is a scene that colleagues act out.

You'll find the other structures in the repertoire under Liberating Structures.

Usage

When to use it

  • Known rule that nobody applies: act out the moment where the rule gets lost instead of repeating it once more.
  • Colleagues already solve the problem: the book suggests learning from peers whose behaviour succeeds. They act out the first scene.
  • Speaking up to someone more senior: the book cites young nurses who learn to stand up for safety in front of a physician.
  • Difficult conversation: the book cites sales, a manager's meeting with team members, end of life and the unruly classroom.
  • Training with no effect on practice: according to the book, hospital trainers have replaced courses with the structure.
  • Collaboration across departments or disciplines: the book suggests it to get different functions and disciplines working together.
  • Target process that changes an interaction: in our view, act out the exchange at the counter or on the phone before writing the requirements.
  • Preparing a go-live: in our view, rehearse with the users the situations in which the new process gives them trouble.
  • After a Discovery & Action Dialogue: the barriers that the group named supply the scenes.
  • Distributed team: according to the site, the structure works online without major adjustment.

When not to use it

  • Problem with no behaviour to act out: an outage or a wrong data value cannot be staged. Look for the cause with root cause analysis.
  • A person in the room is at fault: the scene accuses that person in front of their colleagues. Handle the case with them outside the session.
  • Choice between known options: the structure invents behaviours without comparing options. Compare them in a decision matrix.

Description

The invitation

According to the book, the facilitator invites the participants to name a frustrating chronic problem in their work. The facilitator then invites them to experiment and invent better responses by acting out the situation and the possible solutions.

The three levels of knowledge

According to the book, the structure works on three levels of knowledge at the same time. The book adapts this model from a diagram that Alan Duncan (Mayo Clinic) designed in 2006 for the VHA Health Foundation.

LevelWhat it containsHow the group reaches itWhere in the round
ExplicitWhat the participants say they doAskThe description of the problem and of the scene
TacitWhat the participants do when someone watches themObserveThe scene as played and the debrief
LatentThe new ideas that the group develops togetherCreate togetherThe prototype assembled and played again
The three levels of knowledge according to the book. The last column is our reading of the steps.

An interview or a workshop reaches the first level. Observation reaches the second at the workstation. In Improv Prototyping, the whole group watches the same scene and debriefs it straight away.

The room and the roles

The book calls for an open space or a stage at the front or in the middle of the room. Props help if the scene calls for them. The participants sit in small clusters of chairs around the stage.

A few volunteers act out the first scene. The others observe and evaluate in small groups. They become players in turn when their group tries out its version. The site sets a minimum of nine participants, three or four players and groups of three or four observers.

For a complex scenario, the book suggests support roles: a stage manager, a creative director and a facilitator. The creative director gently steers the players back when the scene drifts. On the site, the creative director also specifies the details of the scene.

The steps according to the book

  1. The facilitator explains the steps (2 min).
  2. The facilitator describes the scenario to be played and the roles (3 min).
  3. The players act out the scene (3 to 5 min).
  4. Each group of observers debriefs the scene with 1-2-4-All (5 min). It spots the pieces of the scene that worked and those that failed. The book calls them chunks.
  5. Each group assembles the chunks that worked into a new prototype. Volunteers act it out for their own group only (5 min).
  6. A group that judges its prototype better goes on stage and acts it out in front of everyone (3 to 5 min).
  7. The participants run as many rounds as it takes to obtain one or more prototypes good enough to be put into practice.
playersobservers
The facilitator explains the steps and then describes the scenario and the roles before the first scene5 min
Volunteers act out the scene in front of everyone3 to 5 min
Each group debriefs with 1-2-4-All5 minchunks that workedchunks that failed
Each group assembles its prototype and acts it out for itself5 min
One group acts out its version in front of everyone3 to 5 min
Is a version good enough to be put into practice?
Nonew round
Yes
Put into practice
One round of Improv Prototyping with the book's timings. The explanation and the scenario description happen only once. The observers become players in their own group. The round repeats until a version is good enough to be put into practice. The book does not say what opens the next round. Our reading: the observers debrief the version played in front of everyone.

Steps 3 to 6 take 3 to 5 + 5 + 5 + 3 to 5 = 16 to 20 minutes. The book's 20 minutes per round is the upper bound. The explanation and the scenario description (5 min) come before the first scene.

In our view, the observers debrief the version played on stage without playing it again. A later round then takes 13 to 15 minutes. A session of three rounds lasts 5 + (16 to 20) + 2 × (13 to 15) = 47 to 55 minutes.

The timings according to the book and the site

ElementBook (2013)Authors' site
Stated duration20 min per roundAbout 20 min per round
Introduction2 min: the steps1 min: the invitation, the problem and the call for players
Setting up the scene3 min: the facilitator describes the scenario and the roles3 min: the players prepare their scene away from the group
Scene3 to 5 min5 min
Debrief with 1-2-4-All5 min in the groups of observers3 min in plenary
Prototype5 min: each group assembles and plays for itself5 min: each group assembles and picks its players
Further scenes3 to 5 min: one group plays in front of everyone3 to 5 min per scene: a few groups play in front of everyone
Minimum group sizeNot stated9 participants
GroupsSmall groups of observers3 to 4 players and groups of 3 to 4 observers
Support rolesStage manager, creative director and facilitatorHost, online tech host and creative director
Improv rules"One conversation at a time" on the book's slideAccept every offer ("yes, and"), make action-filled choices, one conversation at a time, listen and watch, work to the top of your intelligence
How the steps of Improv Prototyping differ between the two sources. Each column follows a single source.

Both sets of timings come from the authors. In our view, the facilitator applies the timings of a single source.

Writing the scene

According to the site, a concrete and well-bounded problem gives better results. The facilitator specifies the main roles, the place and the props. The book advises drawing the themes and the lines of each scene from a Discovery & Action Dialogue or a Simple Ethnography. Sherry Belanger's team drew scenes specific to each unit from its Discovery & Action Dialogues. According to Belanger, staff follow through poorly on a measure imposed from outside. The scene therefore comes from the people who face the problem.

In our view, a generic scene such as "an unhappy customer" makes people play clichés. A precise scene makes the situation recognisable from the first line: the patient in isolation, the physician in a hurry, the chart under his arm.

Debriefing the chunks

A chunk is a gesture or a line that produces a visible effect in the scene: the physician stops, the customer calms down, the employee goes quiet. According to the book, chunks work on their own or together. A group can therefore keep a line from the scene and add a gesture that it invents.

In our view, the observers judge what the character does. A group that comments on the players' talent has stopped looking for chunks. The facilitator brings it back to the book's question: what worked, what failed?

The site links the structure to the Liberating Structures principle "Learn by Failing Forward": a scene that fails supplies the chunks for the next round.

What makes Improv Prototyping fail

The book advises replaying a scene that leaves the room indifferent or sparks no new idea.

Hierarchy freezes the roles. The book suggests swapping roles to leave assumptions behind: the physician plays the nurse, the nurse plays the physician, the student plays the professor. In our view, a manager who plays their own role defends their practice instead of putting it to the test.

The book asks that everyone be included in the roles. In our view, the facilitator forces nobody onto the stage. The observer who debriefs and assembles a prototype takes full part.

The book links Improv Prototyping to a research project against multidrug-resistant bacteria in five Canadian hospitals. In the book, the project researcher Michael Gardam cites infection rate reductions "of 40 to 100 percent". The study published in 2011 tests positive deviance. It compares each site with its own starting point and has no control group. Three of the five sites see infections fall by 25%, 41% and 64%. One site stays flat. At the fifth, an outbreak of vancomycin-resistant enterococci (VRE) drives the rate up. The 100% holds only for one bacterium taken on its own: MRSA falls by 100% at two sites and VRE at two sites. In our view, an analyst who proposes the structure to a sponsor cites the Kelowna case as one unit's account. The analyst draws no figure from it.

Variations

The book suggests having the audience play the scene again. Each small group first stages its own improv. The groups then compete in front of the room. An "applause-o-meter" decides each face-off. The site keeps this variation.

Online, the site sends the players to prepare their scene in a breakout room. The observers debrief in writing in the chat. The groups assemble their prototype in their own room. According to the site, the structure scales up to a large group more easily online than in person.

Improv Prototyping in strings

SourceStringPurpose
Book (chapter 6)User Experience Fishbowl, then Simple Ethnography, then Improv PrototypingThe Fishbowl shows the limits of what the group knows. Simple Ethnography guides the observations. The observations supply the scenarios for the scenes.
Book (chapter 6)Nine Whys, then Improv Prototyping, then Design StoryBoardsClarify the purpose of the shared work. Bring out the difficulties and the solutions that this purpose entails. Assemble the pieces for the next steps.
Book (Discovery & Action Dialogue)Discovery & Action Dialogue, then Improv PrototypingDraw the scenarios for the scenes from the discoveries and the barriers
Book (Shift & Share)Shift & Share, then Improv PrototypingGenerate variations on the ideas presented
Book (Wicked Questions)Wicked Questions, then Improv PrototypingEvaluate and launch the session
Book (Helping Heuristics)Helping Heuristics with Improv PrototypingPractise giving and receiving help
Book (Improv Prototyping)Improv Prototyping with Design StoryBoards, Shift & Share and User Experience FishbowlSpread the innovations
SiteDiscovery & Action Dialogue, Simple Ethnography or User Experience Fishbowl, then Improv PrototypingDefine the theme of the scene
The strings in which the authors place Improv Prototyping and their purpose.

AI considerations

From the notes of a Discovery & Action Dialogue, a language model proposes several scenes: the place, the roles, the line that sets off the problem. The facilitator and two or three participants choose the one that the room will recognise. A scene that the model invents without these notes stays generic.

The tacit level comes from the group watching colleagues act: a hesitation, a glance at the patient, a step back. A chatbot that plays the physician opposite one participant removes the onlookers. In our view, it helps after the session: a participant rehearses the chosen version alone with it before playing it out in their own unit.

A model transcribes the photographed flipcharts and collects the chunks from the groups. The facilitator checks that each chunk stays separate, since the book assembles the prototype from chunks that work on their own.

Care scenes often describe recognisable patients. Health data are sensitive personal data within the meaning of the Federal Act on Data Protection (FADP, Art. 5 let. c). The facilitator removes the names and the details that identify a person from the notes before handing them to an external AI service. In our view, the facilitator does not film the session. A participant plays a conflict with a superior less freely in front of a camera.

Examples

This constructed case builds on the book's scene. A nursing student from a university of applied sciences (HES) cares for a patient in isolation in a hospital in French-speaking Switzerland. A physician enters with the patient's chart and without a gown. The table shows how one group sorts the chunks after the first scene and the prototype that the group draws from them.

Chunk from scene 1Effect in the sceneSorted as
The student carries on with the care without a wordThe physician walks up to the bedFails
She reminds the physician of the rule in front of the patientThe physician replies that he is in a hurryFails
She calls the physician by his nameThe physician turns towards herWorks
She points to the isolation trolley by the doorThe physician looks at the trolleyWorks
The group's prototypeOrigin
1. She calls the physician by his name.Scene 1
2. She invites him to step away from the bed.The group's idea
3. She takes a gown from the trolley and hands it to him.Scene 1 and the group's idea
Constructed case. How one group of observers sorts the chunks of the first scene and the prototype that the group draws from them.

The group invented the second step and placed it between the two chunks that worked. The book calls a new idea of this kind latent knowledge. Scene 2 of Sherry Belanger's account contains steps 2 and 3: the student invites the physician to step away from the patient and helps him into the gown.

Visualisations

A diagram shows the room from above and the loop of one round with the book's timings. Tables give the three levels of knowledge, the steps according to the two sources, the strings and how one group sorts the chunks of one scene.

Cost

PhaseLevelJustification
PreparationMediumChoose a chronic problem and write the scene with the people who face it, often after a Discovery & Action Dialogue. Find the players. Clear a space to act in.
ExecutionMedium5 minutes of introduction, 16 to 20 minutes for the first round, then 13 to 15 minutes per round if the observers debrief the version played without playing it again. Three rounds take 47 to 55 minutes.
DocumentationLowThe analyst notes the chunks kept and the final prototype.

Tooling

An open space becomes the stage. Chairs in small clusters surround it. A few props make the situation recognisable: a gown, a patient chart, a table that stands in for a counter. A timer that everyone can see keeps time for each step. Each group sorts its chunks on a flipchart.

In a remote session, Zoom or Microsoft Teams open the breakout rooms where the players prepare the scene and the groups assemble their prototype. A tech host manages the rooms and spotlights the players during the scene.

Sources

Henri Lipmanowicz and Keith McCandless designed Improv Prototyping. According to the book, the structure draws on improv artists and on Antanas Mockus. Mockus was mayor of Bogotá. The book and the site spell his first name "Antonas". The Harvard Gazette reports that he used theatrical displays to catch the residents' attention and then make them think. Mimes followed pedestrians who crossed against the rules and imitated their every move.

Impromptu Networking
All techniques
Influence Diagrams