Your Training Partner
Techniques Toolbox
An Impromptu Networking session for eight participants labelled A to H. The durations come from the authors' site. In the introduction (3 minutes), each person reflects alone. In round 1 (4 to 5 minutes), A talks with B. In round 2, A talks with D. In round 3, A talks with E. Each participant meets three different partners. In the sharing (3 minutes), the whole room comes together. A brace under the five steps marks the site version (about 20 to 25 minutes). A second brace under the three rounds alone marks the version in the 2013 book (stated as 20 minutes).

Impromptu Networking

Impromptu Networking is a meeting structure of three rounds of conversation in pairs. In each round, participants change partners and answer the same two questions: the challenge they bring and what they hope to get from the group and give to it. Henri Lipmanowicz and Keith McCandless designed it and describe it in The Surprising Power of Liberating Structures (2013). It is one of the 33 original Liberating Structures. The authors' site gives it 20 to 25 minutes with an introduction and a plenary.

Goal

Impromptu Networking is a structure for opening a session. Participants stand in pairs and talk for three rounds of 4 to 5 minutes. According to the book, it focuses the group's attention on the problems it wants to solve and sets up a way of working in which everyone contributes from the start.

The structure replaces the usual opening: the organiser's presentation or the round of introductions. In a round of introductions with thirty people, each participant speaks for one minute out of half an hour. In the book's version, each person speaks for 2 minutes per round, that is six minutes out of twenty. At any moment, half the room is speaking. According to the site, the structure involves everyone from the start and avoids long introductions.

It produces connections and a first inventory of the challenges in the room. Each participant has stated their challenge three times and has heard the challenges of three other people. In the site's version, a short plenary lets the whole room hear some of these ideas. The next structure then works from this inventory.

The business analyst uses it to open a workshop or a kick-off meeting that brings together stakeholders from several departments. You will find the full repertoire under Liberating Structures.

Usage

When to use it

  • Opening a requirements workshop: each stakeholder states their problem before the workshop turns to its subject.
  • Project kick-off: the project team and the business representatives talk to each other in the first twenty minutes.
  • Participants from different departments or functions: the authors ask for pairs across functions.
  • Large group or conference: the book sets no size limit and reports a session with seventy people.
  • Expectations to gather before deciding what comes next: the rounds and the plenary show which challenges the room shares and which ones differ.
  • End of a session: the site also suggests it for closing a meeting.
  • Distributed team: breakout rooms of two or three people replace the room where participants stand and move around.

When not to use it

  • Fewer than four participants: the site sets this minimum; open with a round of introductions.
  • Challenges that people do not confide to strangers (a restructuring, a personal situation): each person repeats theirs three times; use an individual interview instead.

Description

The elements of the structure

The authors describe every structure through five design elements. For Impromptu Networking, their site publishes a revised version. It differs from the 2013 book in group size, group configuration and steps.

ElementAuthors' siteBook (2013)
Structuring invitationAn invitation sentence, then the two questionsThe two questions
Space and materialsAn open space where participants stand in pairs and move around. Online, breakout rooms of two or three peopleAn open space without obstructions where participants stand and move around to find a partner. No materials
Participation distributionA facilitator and the participants. At least four participants. Everyone has an equal opportunity to contributeEveryone at once with the same speaking time. Everyone has an equal opportunity to contribute. No limit on group size
Group configurationAlone, then in pairs or trios with people from other groups or functionsIn pairs with strangers or with colleagues from other groups or functions
Steps and time allocation3-min introduction, three rounds of 4 to 5 min, 3-min plenary. Stated total: about 20 to 25 minThree rounds of 4 to 5 min. Each person answers for 2 min. Stated total: 20 min. No introduction or plenary
The design elements of Impromptu Networking according to the authors' site and according to their 2013 book.

The two questions

The book and the site ask the same two questions. The first is about a challenge: "What big challenge do you bring to this gathering?" The second is about the exchange: "What do you hope to get from and give to this group or community?" The authors ask for one question of each kind. They call the second a "give-and-take" question.

According to the book, the questions must be open-ended but not too broad. They invite participants to shape the direction of the work they will do together. The book suggests other challenge questions: "What problem are you trying to solve?", "What challenge lingers from our last meeting?" or "What hunch are you trying to confirm?" On the first day of a course, professors asked their students: "Why did you choose to attend this class? What do you want to learn from and offer to members of this class?" For a session on child welfare, Tim Jaasko-Fisher asked each person for three things: the leadership challenge they wanted to make progress on, what they hoped to get from the workshop and the insight they brought to the conversation.

A question that is too broad ("What do you think about change?") produces general opinions. A closed question runs out in one sentence and leaves the rest of the round empty. According to the book, participation starts at once provided the questions draw the participants in.

The steps according to the site

  1. Introduction (3 min): the facilitator states the invitation and asks the two questions. Everyone reflects on them in silence.
  2. Round 1 (4 to 5 min): each person looks for a partner from another group or another function. The two partners take turns answering both questions.
  3. Rounds 2 and 3 (4 to 5 min each): each person leaves their partner, finds a new one and answers both questions again.
  4. Sharing (3 min): the whole room comes together. A few people share what everyone should hear.
Introduction3 min
Round 14 to 5 min
Round 24 to 5 min
Round 34 to 5 min
Sharing3 min
Book: 20 min stated
Authors' site: about 20 to 25 min
An Impromptu Networking session for eight participants labelled A to H. The durations come from the authors' site. In the introduction (3 minutes), each person reflects alone. In round 1 (4 to 5 minutes), A talks with B. In round 2, A talks with D. In round 3, A talks with E. Each participant meets three different partners. In the sharing (3 minutes), the whole room comes together. A brace under the five steps marks the site version (about 20 to 25 minutes). A second brace under the three rounds alone marks the version in the 2013 book (stated as 20 minutes).

The steps add up to 18 to 21 minutes against the stated 20 to 25. In our view, the gap covers the partner changes, which take time when everyone is standing and moving around the room. In a trio, three people share the 4 to 5 minutes of the round.

The book's version

The 2013 book describes three rounds of 4 to 5 minutes with no introduction and no plenary. Each person answers for 2 minutes. The rounds add up to 12 to 15 minutes against the stated 20.

Without a plenary, the structure leaves only the connections and what each person has heard. The book recommends using Impromptu Networking before a meeting or a conference begins.

Why three rounds

The book and the site ask for three rounds and advise against one or two. The book lists these effects among the structure's purposes: a story deepens as it is told again and shy people warm up from one round to the next. By the end of the third round, each participant begins to notice what the three challenges they heard have in common.

The book gives the structure another purpose: to show that new connections are worth something even when they are made in a few minutes. For the business analyst, a person from another department met during the rounds becomes a contact to call later. The authors drew on June Holley, whom the book presents as a "network weaver".

Running the rounds

The book recommends a bell to announce each new round. It cites the tingsha: two small Tibetan cymbals joined by a cord. In the first round, the facilitator asks people to choose a stranger or someone from another department. Without this instruction, colleagues who arrived together stay together.

The site handles mishaps with humour. To someone who has talked too long, the facilitator says: "If you used too much time, fix it by talking less in the next round!" To two people who meet again in a later round: "Lucky you! You can dig deeper."

The book asks the facilitator to invite serious play. The site makes "Engage in Seriously Playful Curiosity" the principle of the structure. According to the book, the exercise is more fun outside the meeting room.

If the facilitator shares what was said, the book asks them to do so carefully and to preserve confidentiality.

Online

The site adapts the structure to video calls. The facilitator opens breakout rooms of three so that no participant ends up alone. Between rounds, the facilitator brings everyone back to the main room and then remixes the breakout rooms.

According to the site, the tools mix participants poorly from one round to the next, especially in a small group. The facilitator then assigns the rooms by hand so that everyone meets new people. These transitions take time: the site advises giving participants something to do while they wait.

Stringing it together with other structures

Impromptu Networking opens several of the strings that the authors propose.

SourceAfter Impromptu NetworkingWhat the next step produces
Chapter 6 of the bookGenerative Relationships, then 1-2-4-AllThe diagnosis of the interaction patterns that hold the group back, then the next steps
Chapter 7 of the book: twenty-five leaders1-2-4-AllThe themes common to the participants' expectations
Chapter 7 of the book: leadership retreat of thirty peopleCelebrity Interview of the new CEO, then Nine WhysThe big challenges that the CEO puts to the whole team, then the group's purpose
Book and site15% SolutionsA simple plan to follow up on the new connections
Book and siteSocial Network WebbingStronger network connections
The structures that the authors place after Impromptu Networking and what each one produces.

In the agenda for the twenty-five leaders, the authors cut Impromptu Networking to 15 minutes. The leaders do not all know one another. They answer two questions: "What is a challenge you would like our big idea to address? What can you give and get from a new community initiative?"

What makes Impromptu Networking fail

A room cluttered with tables stops people from moving around. Participants then talk to their neighbour and no longer change partners. The book asks for an open space without obstructions. The facilitator pushes the tables aside before the session or takes the group into an entrance hall.

A round dropped to save time takes away what the third round brings: the challenge restated one last time and what the three challenges each participant heard have in common. Instead, the book suggests speeding the structure up or slowing it down to fit the schedule.

A plenary that has every pair speak turns into the round of introductions that the structure replaced. It then overruns its three minutes.

The facilitator sometimes hears that the structure will not work with this audience or in this culture. The authors wanted to open a workshop for fifty Flemish cardiologists with Impromptu Networking. The cardiologists were standing with a drink before dinner. The authors were told that these specialists would fold their arms. According to the authors, the cardiologists loved the exercise and found it hard to stop talking and sit down for dinner.

The child welfare case

Tim Jaasko-Fisher worked at the University of Washington School of Law. He opened a one-hour session for seventy child welfare judges, lawyers, court clerks and social workers with Impromptu Networking. By his account, this opening showed the participants that they would do the work of the workshop themselves. He adds that it visibly raised the energy in the room.

AI considerations

A language model helps write the two questions. The facilitator gives it the purpose of the session and asks it for several pairs of questions: one about a challenge, one about what each person gives and receives. The facilitator discards the questions that invite a yes or a no and those that cover everything.

Online, the facilitator needs a room assignment in which nobody meets a partner twice and the functions mix. The model can write the spreadsheet formula or the script that computes it from the list of participants and their functions. The facilitator checks the result before the session. Before pasting the list into the model, the facilitator replaces the names with numbers: the list holds personal data under the Federal Act on Data Protection (FADP).

After the plenary, the model can group the challenges noted on the flipchart by theme to prepare the next structure. The book asks that what is shared stay confidential. The facilitator therefore removes names and identifying details before sending the notes to an external AI service.

The model does not replace the rounds. A questionnaire sent beforehand and summarised by a model yields the list of challenges without creating any connection. Yet the main purpose of the structure is for the participants to meet one another.

Examples

By default, Impromptu Networking leaves no document. When a plenary follows the rounds, the facilitator of a requirements workshop notes on a flipchart what the participants share in it. The flipchart has one column for the challenge. The give-and-take question takes two: the offer and the expectation.

DepartmentChallenge heard in the plenaryOfferExpectation
Tax assessmentSupporting documents arrive on paper and are scanned by handThe list of the most frequent documentsA single file format for documents
ITThe tax assessment software imports only the old XML formatA test environment from MarchThe rules for checking documents
Call centreA taxpayer blocked at login calls without being able to describe the errorThe most frequent questions of the last tax periodTo see a taxpayer's filing status
Legal departmentOnline filing must replace the signature on the paper returnThe requirements of the cantonal tax lawTo be consulted before the identification method is chosen
Constructed case. A cantonal tax administration is launching online filing of tax returns. Twenty-four staff from four departments open the workshop with Impromptu Networking. Questions: "What problem does your department want this project to solve?" and "What do you bring to this project and what do you expect from it?" The flipchart records the four contributions to the plenary.

The give-and-take question links the departments. IT expects the rules for checking documents. Tax assessment can write them from its list. The workshop starts from this link.

Visualisations

A diagram follows eight participants through a session. Each participant changes partner in every round and meets three people. The two published versions of the structure, its strings and the example flipchart fit into rows and columns.

Cost

PhaseLevelJustification
PreparationLowWrite the two questions, clear a space where the group can move around standing and provide a bell.
ExecutionLowAbout 20 to 25 minutes according to the site and 20 minutes according to the book. The book shows a 15-minute form.
DocumentationLowNone by default. A flipchart of the plenary and a photo of it if the session needs one.

Tooling

In the room, the structure needs a space free of tables and a bell or a sound signal. A timer that everyone can see helps the facilitator keep to the rounds. The two questions stay on display on a screen or a flipchart during the rounds. A second flipchart records the sharing.

Remotely, the facilitator uses a video call with breakout rooms (Zoom, Microsoft Teams). For a small group, the facilitator prepares the room assignment for each round in a spreadsheet.

Sources

Henri Lipmanowicz and Keith McCandless created Impromptu Networking. The book carries a Creative Commons BY-NC-SA 3.0 licence. The site publishes the structures under a BY-SA 4.0 licence.

  • Henri Lipmanowicz, Keith McCandless, The Surprising Power of Liberating Structures: Simple Rules to Unleash a Culture of Innovation, 2013, ISBN 978-0-615-89337-2: the description of Impromptu Networking with its timing, purposes, tips and variations (Field Guide, Part Four), the case of the Flemish cardiologists (Chapter 5), the strings (Chapters 6 and 7), the testimony of Tim Jaasko-Fisher (Part Three).
  • Impromptu Networking, Liberating Structures: the site version with its introduction, plenary and durations, the minimum of four participants, online facilitation and the facilitator's tips.
  • LS Menu, Liberating Structures: the 33 structures of the original repertoire.
Impact Mapping
All techniques
Improv Prototyping