Your Training Partner
Techniques Toolbox
Scope scale for How Might We questions. On the left, the point-of-view statement of a self-employed taxpayer filing her first tax return online. In the centre, the questions drawn from this statement sit between a too-narrow bound and a too-broad bound. The question that adds a PDF checklist sits on the narrow side: it contains its solution. The question that simplifies taxation for the self-employed sits on the broad side: it exceeds the team's remit. The other five occupy the "Right scope" band. An arrow leads from this band to the brainstorming session.

How Might We

The How Might We technique (HMW) turns a research insight into short questions that launch an ideation session. Each question starts with "How might we…" and names a need without naming a solution. It admits many answers and still gives the team boundaries. Min Basadur adapted the phrase at Procter & Gamble in the 1970s. The Stanford d.school and IDEO.org describe it as a design thinking method.

Goal

The Stanford d.school derives the question from a point-of-view statement. This sentence names a user, their need and the insight that explains the need. IDEO.org starts from the insights that the team has drawn from its interviews and observations. Both sources place the question between research and ideation.

The technique corrects the way an organisation states its problem. That statement is often negative: a drop-out rate, a complaint, a delay. Sometimes it names the solution: "we need an app". Basadur turns the negative problem into a positive question. IDEO.org asks that the question suggest no particular solution.

The team then decides which questions the ideation will address. The deliverable is a list of questions linked to the statement they come from. Each question carries the result of the scope test. This test checks that the question admits a variety of answers and gives the group a starting point. Each question the team keeps opens a brainstorming, SCAMPER or Crazy 8s session.

Problem shaping and reframing decides which problem the team solves. How Might We then writes the question that opens ideation on that problem. Some d.school angles reframe the statement, for example "question an assumption". Their reframing stays within a single question. The team has already agreed on the problem.

Usage

When to use it

  • User research complete: the personas, the empathy map or the interviews deliver insights to turn into questions.
  • Point-of-view statement written: break it into questions before the brainstorming session.
  • Request phrased as a solution: work back from "we need a chatbot" to the need it was meant to serve.
  • Problem phrased in the negative: a complaint or a drop-out rate becomes an open question.
  • Group that judges each idea as soon as it appears: the conditional "might" allows ideas that may fail.
  • Expert interviews in a design sprint: each participant writes what they hear as a question.

When not to use it

  • Problem not yet chosen or statement disputed: the question assumes an agreed problem; go through problem shaping and reframing first.
  • No research behind the statement: the questions reproduce the opinions in the room; run interviews or an observation first.

Description

What each word does

In the Harvard Business Review, Warren Berger quotes Tim Brown's explanation of each word. Brown led IDEO at the time. "How" assumes that a solution exists and gives the group confidence. "Might" allows ideas that may or may not work. "We" says that the group works together and builds on each other's ideas.

Berger also reports Basadur's argument. "Can" and "should" imply a judgement. With "might", the group defers that judgement and produces options more freely. "How can we" asks whether something is feasible. "How should we" asks what is right. "How might we" asks what would be possible. A team that writes "can" in place of "might" brings the judgement back into the question.

The scope of the question

The d.school wants a question broad enough to admit a wide range of solutions and narrow enough to give the group helpful boundaries. Its card uses ice cream as its example. "How might we create a cone to eat ice cream without dripping?" is too narrow: the question already contains the cone. "How might we redesign dessert?" is too broad: the group does not know where to start. "How might we redesign ice cream to be more portable?" has the right scope. The card notes that the right scope varies with the project and with how far the work has progressed.

IDEO.org checks scope with two successive tests. The first asks whether the question admits a variety of solutions. If it does not, the team broadens it. The second asks whether it has become too broad. A good question tells the group where to start and leaves room for wild ideas. The same source sets a third criterion: the question suggests no particular solution.

The too-broad bound also depends on what the team can change. A question that asks for a change to a law or to another service's offer falls outside its remit. The team narrows it to the part it controls.

Writing questions from several angles

One point-of-view statement yields several questions. The d.school's Bootcamp Bootleg card proposes ten angles and applies them to an airport example. The 2018 edition of the Design Thinking Bootleg keeps five.

AngleWhat the team looks for in the statement
Break POV into piecesThe parts of the statement that each carry a question: the user, the need, the insight.
Amp up the goodWhat is already favourable in the situation, to get more of it.
Remove the badWhat bothers the user, to eliminate it.
Explore the oppositeThe opposite of the situation described, to make it the goal.
Question an assumptionWhat the statement takes for granted, to do without it.
Go after adjectivesThe qualifiers in the statement, to reverse them.
Identify unexpected resourcesThe people or means present in the situation that nobody uses.
Create an analogy from need or contextAnother situation that answers the same need or the same context.
Play POV against the challengeThe team's challenge rewritten from what the user wants.
Change a status quoA situation accepted as normal, to change it.
The angles of the Bootcamp Bootleg How Might We card and what each one looks for in the point-of-view statement.

Some angles produce nothing on a given statement. Sorting comes afterwards.

Running the session

  1. Post the statement. The team starts from a point-of-view statement or a written insight. IDEO.org allows 60 minutes with the project team. The materials are sticky notes and pens.
  2. Break the statement down. The d.school divides the problem into pieces the team can act on. Each piece yields at least one question.
  3. Write the questions. Each participant puts "How might we" in front of a piece of the statement and writes one question per note. They then go through the angles one by one and write each question without judging it. One insight often yields several questions. IDEO.org takes that as a good sign. The d.school advises brainstorming the questions before brainstorming the solutions.
  4. Test each question. The group rereads the notes against the scope criteria: a variety of answers, a starting point, no solution named, a question within the team's remit. The team brings a too-narrow question back to the need its solution was meant to serve. It narrows a too-broad question to one piece of the statement.
  5. Select the questions for ideation. Neither the d.school nor IDEO.org sets a selection rule. In practice the team groups the questions by theme and ranks them by dot voting as in a design sprint. Each question the team keeps launches its own ideation session.

Origin of the phrase

Min Basadur tells the story of the phrase in an interview that his company publishes. In 1971 he attended the Creative Problem Solving Institute led by Sid Parnes and Alex Osborn. He then applied Parnes's method at Procter & Gamble, where he worked. There he found that competent people defined their problems badly. So he turned the negative problem into a positive question. From this he built an eight-step problem-solving process whose standard question became "how might we".

In 2012 Berger wrote that IDEO, Google and Facebook use the phrase. The d.school has codified it in a method card.

Pitfalls

The solution inside the question

Berger reports a Procter & Gamble case from the 1970s. A team is trying to beat Colgate-Palmolive's green-striped Irish Spring soap. Basadur judges the starting question wrong and has it rewritten.

QuestionWhat it namesAnswers it admits
"How can we make a better green-stripe bar?"A solution: the green stripeVariants of the Irish Spring stripe
"How might we create a more refreshing soap of our own?"A need: freshnessHundreds of ideas, including the seaside theme
The Coast case reported by Warren Berger. The starting question names a solution, the rewritten question names a need.

The team kept the seaside theme. That theme produced the blue-and-white-striped Coast soap.

The same trap appears when the sponsor has already chosen a solution: "How might we launch a mobile app?" The first test does not always catch the hidden solution: "launch a mobile app" admits hundreds of variants. So the team rereads each noun in the question and asks whether it designates a need or an object to build. For the app, the facilitator asks which need it answers and writes the question on that need.

The question that is too broad

"How might we improve the customer experience?" passes the first test and fails the second. The group does not know where to start. The ideas go in every direction. None of them can be compared with the others. To correct the question, the team keeps only one part of the point-of-view statement.

The question with no research behind it

The question is only as good as the insight it comes from. Without interviews or observation, it reproduces the room's assumptions about the user. The angles then multiply questions about a need that nobody has observed.

AI considerations

A language model applies the ten angles to a point-of-view statement and returns some thirty questions in a minute. It also goes through the angles that the group skips. The analyst then gives the model the questions and the scope criteria. The model spots a solution noun hidden in a question: an app, a list, a letter.

The model judges a question's breadth without knowing the team's remit. Its questions reuse common phrasings and drift away from the user's words. The analyst supplies the insights: left to itself, the model invents plausible ones that nobody has observed. The team itself chooses the questions it keeps.

Interview notes contain personal data within the meaning of the Federal Act on Data Protection (FADP). The analyst submits the anonymised point-of-view statement to an external service, never the raw notes.

Examples

The scope test sorts the questions that one point-of-view statement has produced. The team behind the online tax return portal of a French-speaking canton starts from this statement: "A self-employed taxpayer filing her first return online needs to know which documents to attach before she starts because she abandons the form whenever a document is missing."

OriginQuestionScope test
Break POV into piecesHow might we tell the taxpayer which documents to gather before the first page?Right scope
Break POV into piecesHow might we help the taxpayer resume her entry where she left off?Right scope
Question an assumptionHow might we allow the return to be filed before every document is gathered?Right scope
Create an analogy from need or contextHow might we make the first return as guided as opening a bank account online?Right scope
Identify unexpected resourcesHow might we make use of the fiduciary firm the taxpayer already works with?Right scope
Spontaneous phrasingHow might we add a PDF checklist to the portal's home page?Too narrow: the question contains its solution
Spontaneous phrasingHow might we simplify taxation for the self-employed?Too broad: tax law lies outside the team's remit
The questions drawn from the self-employed taxpayer's point-of-view statement: their origin and the result of the scope test.

The two questions that fail came spontaneously. Neither comes from an angle on the card.

Visualisations

A scale shows the scope rule. A question sits between the too-narrow bound and the too-broad bound. Only the questions in the "Right scope" band go on to ideation.

Cost

PhaseLevelRationale
PreparationLowThe research has already been done. The facilitator posts the statement and hands out the notes.
ExecutionLowIDEO.org allows 60 minutes with the project team.
DocumentationLowA list of questions with their statement and the result of the scope test.

Tools

Sticky notes and a wall are enough. Each note carries one question and goes under the statement it comes from. In a remote session, a digital whiteboard (Miro, Mural, FigJam) does the same job. After the session, a spreadsheet keeps the list with one column for the origin and one for the scope test.

Sources

Hoshin Kanri
All techniques
Human in the Loop