Honey and Mumford's learning styles
Honey and Mumford's learning styles describe four preferred ways of learning from experience: Activist, Reflector, Theorist and Pragmatist. Each style matches one stage of a learning cycle: having an experience, reviewing it, concluding from it and planning the next steps. In 1982 Peter Honey and Alan Mumford published the Learning Styles Questionnaire (LSQ), which measures these preferences. The resulting profile is the starting point for a personal development plan or for the choice of activities in a training course.
Goal
The technique uses a questionnaire to measure how a person prefers to learn from experience. The trainer or the manager then chooses the learning activities on the basis of that result. Honey and Mumford define a learning style as "a description of the attitudes and behaviour which determine an individual's preferred way of learning".
The authors designed the questionnaire for managers who learn at work without asking themselves how. It helps them build on their strengths as learners or become all-round learners. Their stated aim is a person who is competent at all four stages of the cycle.
The technique supports two decisions. The first concerns one person: which style to strengthen and through which activities. The second concerns a group: which activities to offer so that everyone learns. The deliverable is the person's profile: four totals plotted on a cross and compared with the published norms. The profile comes with the selected activities and with a learning log for the style to strengthen.
Usage
When to use it
- Personal development plan: identify the style to strengthen and choose the activities that exercise it.
- A manager who organises the team's learning: check that the team gets more than the activities of the manager's own style.
- Training the users of a new solution: in our view, plan one activity per stage of the cycle in every session.
- The start of a coaching or mentoring relationship: open the conversation on how the person learns at work.
- Lessons-learned reviews that produce no lesson: keep a learning log to review the experience and draw conclusions from it.
When not to use it
- Recruitment, appraisal or promotion: the authors reserve the questionnaire for development. Use a competency framework.
- Training content still to be defined: the profile says how a person prefers to learn. What they need to learn comes from task analysis.
Description
The cycle and the styles
The model adapts David Kolb's experiential learning cycle. Each style names the preference for one stage: the Activist has the experience, the Reflector reviews it, the Theorist concludes from it, the Pragmatist plans the next steps. Each style has its own scale. Mumford rejects Kolb's structure of two opposed axes: one person can score high on both Activist and Reflector.
| Style | Learns best | Learns least | Associated activities |
|---|---|---|---|
| Activist | In a new situation, a short and immediate task, a problem solved as a team | By listening, reading alone, repeating the same exercise | Action learning, business game, role play, job rotation |
| Reflector | With time to observe, gather data and prepare | In the limelight, under time pressure, without data | Learning review, observing a role play, reading, lecture |
| Theorist | With a model, a system or a concept whose assumptions they can question | In an ambiguous, emotionally charged or unstructured situation | Exercise with a right answer, lecture, self-directed study, critical analysis of a case |
| Pragmatist | When the link with a problem in their job is visible and they can try it out at once | From a theory with no application or practice | Project work, problem-solving workshop, discussion of the organisation's real problems |
In the authors' view, no style has a decisive advantage over the others. Each style has strengths. The situation decides which of them count. A person changes their preferences when they exercise a little-used style or when they move to an organisation that learns differently. Honey and Mumford place the style among other factors: past learning experiences, the opportunities on offer, the trainer's influence and the culture and climate of learning.
The questionnaire
The 2000 edition of the LSQ has 80 statements. Each style gets 20 of them. They describe common behaviour at work. None of them asks the person how they learn. The person ticks each statement they tend to agree with and crosses out the others. This takes 10 to 15 minutes.
Each tick scores one point. Each style therefore receives a total from 0 to 20. The trainer plots the four totals on the four arms of a cross to draw the profile.
The trainer compares each total with a norm. The authors publish general norms based on 3'500 people. Norms by occupation, by gender and by country complement them.
The authors call a preference strong when its total falls within the top 30% of scores in the norm. Of 300 managers selected at random, 35% had a single strong preference, 24% had two, 20% had three, 2% had all four and 19% had none. Only one profile in three therefore comes down to a single style.
Running the process
- Announce the purpose
The questionnaire serves the development of the person or the team. The authors exclude it from appraisal and selection. They make honest answers depend on this announcement: a person who knows that the result will not be used to judge them has less reason to present a false picture of themselves. - Administer the questionnaire
Each person fills in a copy of the 2000 edition alone and marks each of the 80 statements. - Score and plot
The trainer or the person counts the ticks with the publisher's scoring key and draws the cross. - Read the profile against the norms
The trainer reads each total against the norm for the person's occupation or country to identify their strong preferences. The strongest preference is the one whose total sits highest. The style with the lowest total is the least used. - Give feedback in an interview
The profile opens a conversation about situations in which the person learned something. The trainer checks each preference against a real example. The authors expect the trainer to know how to interpret the questionnaire and how to advise the person on what it implies. - Choose the activities
For one person, select activities that serve their preferences and at least one activity from the stage they neglect. For a group, take every session through the four stages of the cycle. This group rule is our addition. - Strengthen a little-used style
The 1992 manual proposes the learning log. After an experience, the person notes what happened, what they take from it and what they will do differently. The three headings exercise reviewing, concluding and planning. In our view, a little-used Activist style is better served by an activity associated with that style, for example a role play.
Training the users of a new solution
Honey and Mumford observe that managers encourage learning in line with their own style. In our view, the trainer who designs the user training for a new solution is exposed to the same bias. A trainer with a Theorist profile tends to fill the session with lectures and right-answer exercises. The participants who prefer experience or application learn least in such a session.
The group's profile sets the length of each activity and the materials. It does not split the participants into separate sessions by style. Such a split would work against the authors' aim of a person competent at all four stages.
What makes the process fail
Reducing the person to a label
The authors present the labels as a convenient simplification and a starting point for discussion. Yet only one profile in three shows a single strong preference. A label announced in a team meeting locks the person into a role that the profile does not describe. In the feedback interview the trainer talks about the preferences and the situations in which they come into play.
Assigning people by profile
In our view, the exclusion that the authors set for selection also applies to assignment. A manager who gives the drafting to the Reflector and the steering to the Pragmatist relies on what the person said about their habits on a given day.
Handing out results without an interview
A profile sent by email skips the check against a real example. It becomes the label that the interview was meant to prevent. When no interview is possible, the trainer builds the session on the four stages of the cycle without administering the questionnaire.
Rewriting the questionnaire
An organisation that writes its own statements or has a tool generate them gets totals with no norm to compare them against. Nobody can then say whether a preference is strong. The 80 statements and the scoring key belong to the publisher.
Treating the style as the only factor
Of the other factors that Honey and Mumford list, the trainer can influence the opportunities on offer and the learning climate. The trainer's plan includes practice time after the session, access to the test environment and support from the line manager.
AI considerations
A conversational assistant prepares a session plan. From the objectives and the group's profile it proposes activities, durations and materials for each stage of the cycle. It drafts the headings of a learning log in the vocabulary of the participant's trade. It writes the instructions for an exercise on fictitious cases. After the training it groups the anonymised log entries and picks out the difficulties that recur.
The feedback on a profile remains a conversation between people. It deals with situations that only the person has lived through. A language model asked for "the Honey and Mumford questionnaire" invents a list without norms or copies a protected text. A tool that infers a person's style from their emails or from their activity data on the learning platform produces a profile that the person never gave. Profiles and logs are personal data. The Federal Act on Data Protection (FADP) applies to a private employer. A cantonal body falls under the cantonal data protection act. A team that wants to feed profiles or logs into an external AI service decides where the data go and to which provider before anyone fills in the questionnaire. The team informs the participants.
Examples
A cantonal OASI compensation office replaces its contribution management software. Twelve case officers attend a half-day training session. They completed the LSQ two weeks earlier. The concept illustrated: one session takes the group through the four stages of the cycle. The group's profile sets the adjustments.
| Stage of the cycle | Style called on (participants whose strongest preference it is) | Activity | Duration | Adjustment drawn from the profile |
|---|---|---|---|---|
| Having an experience | Activist (2) | Simulation: each case officer enters three fictitious cases in the test environment without instructions. | 60 min | The 4 Reflectors receive the description of the three cases the day before. |
| Reviewing the experience | Reflector (4) | Learning review: each person notes what blocked them. The group then pools the blockers on the board. | 40 min | Individual notes before the round table: nobody is called on to speak first. |
| Concluding from the experience | Theorist (3) | Lecture on the life cycle of a contribution case and on the validation rules of the software. Exercise with a right answer: match six data-entry errors to the rule that each one breaks. | 40 min | Lecture limited to 15 minutes for the 2 Activists. The diagram of a case's statuses fits on one page that everyone receives. |
| Planning the next steps | Pragmatist (3) | Workshop on real problems: each case officer picks two cases from their pile for the week and plans how to process them with a colleague. | 50 min | The first real case is processed before the session ends. |
Each case officer counts once under the style whose total sits highest in the norm used.
Visualisations
The cycle shows that a style is the preference for one stage. The cross shows that a profile is read from all four totals at once.
Cost
| Dimension | Level | Justification |
|---|---|---|
| Preparation | Low | Obtain the copies and the publisher's scoring key, announce the development purpose, schedule the interviews. |
| Execution | Medium | The questionnaire takes 10 to 15 minutes. Each person has a feedback interview with someone who knows how to interpret the profile. |
| Documentation | Low | One profile and a few actions per person. For a group, the spread of preferences and the session plan. |
Tooling
Peter Honey Publications published the 80-item questionnaire and the Learning Styles Helper's Guide in 2000. The guide contains the norms and the activities associated with each style. A spreadsheet totals the scores of a group and keeps track of the spread of preferences. The learning log fits in a notebook, a shared document or the personal space on the learning platform. In the session a cycle drawn in advance on a whiteboard guides the sequence.
Sources
- Honey, P. and Mumford, A. (2000), The Learning Styles Helper's Guide, Peter Honey Publications, ISBN 1 902899 10 5: the guide to the 2000 edition, with the norms, the uses that the authors intend and the activities associated with each style.
- Honey, P. and Mumford, A. (2000), Learning Styles Questionnaire, 80-item version, Peter Honey Publications, ISBN 1 902899 07 5: the questionnaire of 80 statements and its scoring key.
- Honey, P. and Mumford, A. (1992), The Manual of Learning Styles, revised edition (first edition 1982), Peter Honey Publications: the definition of a learning style and the learning log.
- Coffield, F., Moseley, D., Hall, E. and Ecclestone, K. (2004), Learning styles and pedagogy in post-16 learning: a systematic and critical review, Learning and Skills Research Centre, §6.2, pp. 72-77: the origin of the questionnaire, the cycle, the measurement, the norms and the uses that the authors intend, with page-referenced quotations from their works.

