Your Training Partner
Techniques Toolbox
A Helping Heuristics cycle. A trio brings together a client, a coach and an observer. The coach changes the helping pattern every round. In the Quiet Presence round, the coach listens. In the Guided Discovery round, the coach asks questions. In the Loving Provocation round, the coach gives advice. Blocking becomes possible in this round. In the fourth round, coach and client accept each other's offers. The book calls this pattern Process Mindfulness. The authors' site calls it Generative Shaping. In every round the observer notes the accepted and blocked offers. A 5-minute debrief follows the four 2-minute rounds.

Helping Heuristics

Helping Heuristics is a meeting structure in which participants practise asking for, offering and receiving help in groups of three. In each trio, the client presents a difficulty they care about. The coach responds over four rounds of two minutes. The coach changes the helping pattern every round: they listen, then question, then advise. In the last round, coach and client build on each other's ideas. The observer notes the offers that client and coach accept or block. Henri Lipmanowicz and Keith McCandless designed it and describe it in The Surprising Power of Liberating Structures (2013). The book times it at 15 minutes.

Goal

Helping Heuristics is a facilitation structure in which three participants practise asking for, offering and receiving help on a difficulty that one of them brings.

According to the book, a heuristic is a shortcut that helps people identify what matters in a new situation. The short exchanges of the structure bring out simple rules that make help more useful. Participants see their own habits in helping and in asking for help. They then try other ways of doing it.

According to the book, the structure reduces the common errors of the person who helps and of the person who asks for help. The book names them in two lists of behaviours to avoid. The site links the structure to the Liberating Structures principle "Practice Self-Discovery Within a Group".

The structure produces no decision. Each participant leaves with an observation about the way they help. The sources ask for no written record.

You'll find the other structures in the repertoire under Liberating Structures.

Usage

When to use it

  • Wise Crowds, What I Need From You or Options Place falls short: participants make the structure fail through behaviours to avoid when they help or ask for help.
  • Helping professions: nurses, coaches and teachers renew their relational skills and learn new ones.
  • Interprofessional coordination: the book offers it to any group that wants to coordinate different professions better.
  • Analysts who run interviews: in our view, the analyst practises listening and questioning before advising.
  • Liberating Structures facilitators: the book invites them to study the helping behaviours that many structures share.
  • Frustrated helper: a person worn out by trying to help a colleague widens their range of responses.

When not to use it

  • Client who expects a solution to their problem: the 2-minute rounds are for practice. They are too short to solve the client's problem. Troika Consulting gives the client a round of 7 to 11 minutes in which two peers advise them for 4 to 5 minutes.

Description

The invitation

The book and the site open on the same idea: every human interaction is an offer that the other person accepts or blocks. Improv actors learn to accept every offer. A person who accepts an offer picks it up and uses it. A person who blocks it ignores it, interrupts it or refuses it.

According to the book, the facilitator asks the participants to practise a helping pattern, react to it or observe it. The facilitator then invites them to reflect on their habits and to change the way they ask for, offer and receive help. The site calls heuristics mental shortcuts. In the site's version, the facilitator uses the introduction to display a chart of the helping patterns with the coach's prompt for each one.

The room and the trios

The book accepts any number of participants and has them stand with no table between them. In each trio, the client and the coach face each other while the third participant observes. The whole group meets again for the debrief.

The site lets the trios stand or sit. It keeps the room free of tables and sets the minimum at three participants. It recommends a mix of profiles in each trio.

The roles

The role says who speaks. The helping pattern says how the coach responds.

The client presents a difficulty they care about. The coach responds in the pattern of the round. The observer follows the exchange. The site asks the observer to note how the other two accept or block each other's ideas. The site adds a fourth role: the facilitator who announces each round.

According to the book, the roles can stay the same or change from one round to the next. Its tips recommend changing them every round. The site keeps the same roles for all four rounds. After a first cycle, it lets each trio choose its roles.

With fixed roles, only one participant per trio practises as coach.

The helping patterns

The two sources give the first three patterns the same names and name the fourth differently. The book describes what the coach does. The site gives the coach a prompt.

The trioClientCoachObserver
Introduction2 min
Round 1Quiet Presence
The coachListens
OffersAll accepted
Duration2 min
Round 2Guided Discovery
The coachAsks questions
OffersAll accepted
Duration2 min
Round 3Loving Provocation
The coachAdvises
OffersAccepted or blocked
Duration2 min
Round 4Process Mindfulness (book)Generative Shaping (site)
The coachBuilds with the client
OffersAll accepted
Duration2 min
Observer: notes the accepted or blocked offers
Debrief5 min
A Helping Heuristics cycle with the book's timings. The coach changes helping pattern every round. Blocking becomes possible in the third round. The observer notes the accepted and blocked offers across all four rounds.
Round and patternBook's Field GuideAuthors' siteGoal according to the book's slide
1. Quiet PresenceThe coach accepts all offers and listens with compassion. The book refers to "Heard, Seen, Respected".The coach listens with compassion and asks only "What else?"Build trust. Reduce status differences. Listen with empathy.
2. Guided DiscoveryThe coach accepts all offers and guides the inquiry towards shared discoveries. The book refers to Appreciative Interviews.The coach asks the client for a story in which they made progress or were stopped. The coach asks what influenced it.Guide the inquiry towards shared discoveries.
3. Loving ProvocationThe coach slips in advice when they see something that the client does not see. The coach accepts or blocks as needed. The book refers to Troika Consulting.The coach offers: "Would it be possible to try…?" The client accepts or blocks the suggestion.Slip in advice and suggestions to move forward.
4. Process Mindfulness (book)
Generative Shaping (site)
Coach and client accept all of each other's offers. They work at the top of their intelligence and watch new ideas multiply.Coach and client accept all of each other's offers. They build on each other's ideas with "Yes, and…" and "If… then…".See the dynamics of help and of the relationship more clearly.
The Helping Heuristics patterns by source. The goal of each pattern comes from a slide in the book.

Both sources reserve advice and blocking for the third round. In the book, the coach accepts or blocks. On the site, the client accepts or blocks the coach's suggestion.

The steps according to the book

  1. The facilitator announces the four rounds of improvised exchanges and the debrief. Each trio names a client, a coach and an observer. 2 min.
  2. The four rounds follow one another: Quiet Presence, Guided Discovery, Loving Provocation, Process Mindfulness. The coach responds in the pattern of the round. 2 min per round.
  3. Clients, coaches and observers debrief the effect of each pattern as they experienced it. 5 min.
  4. Depending on the debrief, the group repeats all the rounds or some of them so that everyone practises several patterns.

Neither the book nor the site says whether the client keeps the same difficulty from one round to the next. In our view, one difficulty across all four rounds makes the patterns comparable for the observer.

Timing by source

StepBook's Field GuideAuthors' site
Stated duration15 minAbout 15 min face to face, 18 to 20 min online
Stated duration of the rounds and the debriefNot stated13 to 14 min
Introduction2 min3 min including forming the trios
Round 12 min1 to 2 min, 3 to 4 min online
Rounds 2, 3 and 42 min each1 to 2 min each
Debrief5 min5 min in trios
Plenary sharingNone1 min
Calculated total15 min13 to 17 min face to face, 15 to 19 min online excluding the plenary check-ins after rounds 1 and 2
Helping Heuristics timings by source. Each column follows one source only. The totals are our calculation.

The book's introduction states rounds of 1 to 2 minutes. Its steps give 2 minutes per round and add up to the stated 15 minutes.

In its introduction, the site states a total of 13 to 14 minutes for the four rounds and the debrief. By our calculation, these two steps last 9 to 13 minutes.

The debrief

According to the book, the whole group debriefs (steps 3 and 4).

The site holds the debrief in trios. The client and the coach speak for one minute each. In three minutes, the observer goes through the patterns one by one and reports the acceptances and blocks they noted. Everyone then returns to plenary for one minute. A few participants share a lesson that everyone should hear.

Online

The site describes the online version. The trios work in breakout rooms. The facilitator announces each round with a message broadcast to all the rooms. The first round lasts 3 to 4 minutes. The facilitator then calls everyone back to plenary to check that the trios have understood. If the trios are on track, the facilitator sends them back for the last three rounds. If not, the facilitator calls them back a second time after round 2.

Behaviours to avoid

The site does not reproduce the book's lists. The description of Wise Crowds sends the reader to them for the complete list.

On the helper's side, the book lists:

  • offering a solution too early;
  • giving advice the other person does not need;
  • pressing the other person to apply the advice;
  • moving to the next steps too quickly;
  • holding back too much so as not to overhelp.

On the side of the person asking for help, the book lists:

  • mistrusting the helper;
  • keeping quiet about the real problem;
  • accepting help without taking ownership of it;
  • looking for approval rather than help;
  • resenting not getting enough help.

The authors' tips

Both sources ask for a climate of trust and mutual discovery. The book also asks that questions be put with humility. The site adds play. It suggests that the facilitator tell the group about a helping habit of their own that they cannot see and that everyone else sees.

Both sources direct attention to the patterns that help the client find their own solution. The site gives the observer this task. Both sources also ask for attention to status differences, the setting, body language, demeanour and subtle signals. The site narrows the subtle signals to signals of blocking.

According to the book, the first cycle of four rounds can prepare deeper work on a single pattern. After this cycle, each trio chooses the patterns it wants to work on.

What makes Helping Heuristics fail

In our view, a coach who gives advice from the first round confuses round 1 with round 3. The observer can no longer compare listening with advice. The site's prompts prevent this drift: in round 1, the coach asks only "What else?" The facilitator repeats the round's prompt before each round starts.

An observer who judges the content of the advice pulls the debrief back to the client's difficulty. In our view, the facilitator repeats the site's instruction before the first round: note the acceptances and the blocks.

In our view, status differences weigh on every offer in a trio that brings together a manager and one of their direct reports. The facilitator avoids such trios or asks the trio to name the gap in the debrief.

Variations

The book suggests that each participant draw up their own profile: their default patterns and the ones they still need to work on. The site suggests that participants identify their default pattern and practise others. It cites a group whose default pattern is Generative Shaping and that takes the time to practise others.

The book suggests starting with two "fun" patterns. In the neutral pattern, the coach gives no response (the site speaks of a poker face). In the blocking pattern, the coach ignores or interrupts the client. The site files these two among the extreme patterns.

Helping Heuristics in strings

The book suggests building the progression of helping patterns into other structures based on give-and-take: Troika Consulting, Wise Crowds, What I Need From You, Improv Prototyping and Simple Ethnography. The site keeps the first three.

In the book, the description of Troika Consulting suggests stringing that structure together with Helping Heuristics, "Heard, Seen, Respected" and Nine Whys. 15% Solutions cites Helping Heuristics among the structures that fit with it. "Heard, Seen, Respected" lists it among the structures that help mend a relationship.

AI considerations

During the rounds, no language model takes a role. The structure exists so that participants practise the helping patterns on one another. The observer reads status, body language and signals of blocking in the room.

Before the session, a model can prepare cards of the helping patterns in the group's languages. A bilingual team gets the prompts in French and German. The facilitator checks that each translated prompt keeps its pattern: the French or German version of "Would it be possible to try…?" remains a suggestion that the client can block.

After the session, a model can group the observers' notes by helping pattern. The difficulties presented often name identifiable colleagues. These notes then contain personal data within the meaning of the Federal Act on Data Protection (FADP, Art. 5 let. a). The facilitator removes the names and job titles that identify a person before handing the notes to an external AI service.

Examples

The observer's sheet shows what the debrief compares: the offers that each pattern gets accepted or blocked.

Round and patternThe coachOffer acceptedOffer blocked
The client's difficulty: the heads of department do not read the specification before the validation meeting.
1. Quiet Presence"What else?"The client adds that the specification runs to 40 pages and arrives the day before the meeting.None
2. Guided Discovery"Tell me about a time when a review worked."The client describes the March meeting: she had read three use cases aloud there.None
3. Loving Provocation"Would it be possible to send three use cases instead of the 40 pages?"NoneThree use cases instead of the 40 pages. The client: "The project manager insists on the full document."
4. Generative Shaping"Yes, and what if the full document went out as an appendix to the three use cases?"The client: "If the three use cases open the meeting, then the heads of department read them on the spot."None
Note for the debrief: the client blocked the only direct advice. She accepted every question and built on the offer of round 4.
Constructed case. A business analyst in a municipality brings the same difficulty to all four rounds. The coach's lines follow the authors' site. The observer notes the accepted and blocked offers on a sheet that the sources do not provide.

In round 4, the coach accepts as an offer the objection that the client raised in round 3. The block in round 3 becomes the material of round 4.

Visualisations

A diagram shows a cycle of four rounds: each person's role, the coach's pattern and the round in which blocking becomes possible. The patterns by source, the timings and the observer's sheet fit in rows and columns.

Cost

PhaseLevelJustification
PreparationLowDisplay the invitation and the helping patterns with their prompts. Clear a space with no tables.
ExecutionLow15 minutes according to the book. About 15 minutes face to face and 18 to 20 minutes online according to the site. All the trios work at the same time.
DocumentationLowThe sources ask for no record. In our view, one observation sheet per trio is enough for the debrief.

Tooling

The trios stand face to face in a space with no tables. A displayed or printed card gives the helping patterns and the coach's prompt for each round. A bell or a displayed timer announces the rounds. The observer notes on a sheet what they see.

Online, Zoom or Microsoft Teams split the participants into breakout rooms of three and broadcast the announcement of each round to all the rooms.

Sources

Henri Lipmanowicz and Keith McCandless designed Helping Heuristics. According to the book, the structure is inspired by the author and professor Edgar Schein. The book refers to his work Helping. The site refers to Schein for a close study of the helping patterns. The book is published under a Creative Commons BY-NC-SA 3.0 licence. The structure's page on the site is published under a BY-SA 4.0 licence.

  • Henri Lipmanowicz, Keith McCandless, The Surprising Power of Liberating Structures: Simple Rules to Unleash a Culture of Innovation, 2013, ISBN 978-0-615-89337-2: the description of Helping Heuristics with its invitation, its steps, its purposes, its tips, its variations, its examples and its attribution (Field Guide, part four); the "Facilitation Tips" slide that gives the goal of each pattern; the cross-references from Troika Consulting, Wise Crowds, 15% Solutions and "Heard, Seen, Respected".
  • Helping Heuristics, Liberating Structures: the site's version with its invitation, its roles, its prompts, its durations, its debrief, its online format, its variations and the principle it belongs to.
  • Edgar H. Schein, Helping: How to Offer, Give, and Receive Help, Berrett-Koehler, 2009: the work that the book cites as a source of inspiration.
Heijunka
All techniques
Histogram