Your Training Partner
Techniques Toolbox
The sequence of Heard, Seen, Respected with the Field Guide timings. The facilitator presents the purpose to the whole group (3 minutes). Participants sit in pairs on chairs facing each other with no table. Each person in turn tells a 7-minute story while the other listens without advising or judging (15 minutes). Each pair then says what they felt while telling and while listening (5 minutes). Two pairs form a group of four that looks for the patterns the stories share (5 minutes). The whole group says how to use HSR in response to these patterns (5 minutes).

Heard, Seen, Respected

Heard, Seen, Respected (HSR) is a meeting structure in which two participants take turns telling each other about a time they did not feel heard, seen or respected. The listener keeps quiet and only prompts the storyteller to go on. Groups of four then look for the patterns the stories share. The whole group finally asks where and how to practise this listening. Henri Lipmanowicz and Keith McCandless designed it and describe it in The Surprising Power of Liberating Structures (2013). The book gives it 35 minutes. The authors' site gives it about 30 minutes.

Goal

Heard, Seen, Respected trains a group to listen to a colleague without advising or judging.

According to the book, the structure shows how common it is not to feel heard, seen or respected. It also shows how common it is to make others feel the same way. The book gives it further purposes for the group: sharpening listening and empathy, seeing what listening alone achieves and relying more on one another in a confusing or new situation. It offers "catharsis and healing" after strain in a relationship. It also aims to help managers see when listening is more effective than trying to solve a problem.

The site links the structure to the Liberating Structures principle "Build Trust as You Go".

Each group of four names patterns. In the plenary, the group says where and how to practise this listening. The structure settles nothing and neither source asks for a written record.

You'll find the other structures in the repertoire under Liberating Structures.

Usage

When to use it

  • Meetings where people listen poorly to each other: the book suggests HSR for regular meetings so that members listen to each other better.
  • Transition with an uncertain future: after a merger or a market upheaval, the book recommends empathetic listening while questions about the future remain unanswered.
  • Loss suffered by a team: the book and the site see HSR as a place to voice grief or despair.
  • Group with strained relationships: the site suggests HSR to work on how people interact.
  • Reporting relationship: the book suggests HSR between a manager and their direct reports. In our view, the two pair up only if both choose to.
  • Manager who wants to solve everything: the book aims to teach them to see when listening works better than a solution.
  • Analyst who runs interviews: in our view, the listener practises prompting a story without steering it.
  • Remote team: the site describes an online format with breakout rooms of two.

When not to use it

  • Open conflict that needs an outcome: HSR settles nothing. A trained mediator or a decision meeting fits better.
  • Group where a story can be used against its teller: an announced restructuring or an internal investigation under way. Start with 1-2-4-All on a work question.

Description

The invitation

The book invites each participant to tell a partner about a time when they did not feel heard, seen or respected.

The site writes the invitation in the first person so that the facilitator can read it aloud. It includes the purpose of the exercise and adds that the exercise helps people put themselves in someone else's shoes.

The room, the roles and the groups

The book asks for a room without tables. Partners sit face to face on two chairs with only a few centimetres between their knees. Each person spends the same time as storyteller and as listener. Two 7-minute stories leave one minute to switch roles within the 15 minutes of the step.

The site keeps the pairs of chairs without tables and asks for an introductory text on display. It names the roles: the facilitator, the storytellers and the listeners. Online, a tech host manages the breakout rooms. The site sets the minimum at two participants.

The steps according to the book

The Field Guide (part four of the book) times each step.

  1. The facilitator introduces the purpose of HSR: to practise listening without trying to fix anything or judge. 3 min.
  2. In each pair, each person in turn tells of a time they were not heard, seen or respected. Each story lasts 7 minutes. 15 min.
  3. The partners tell each other what they experienced: "What did it feel like to tell my story; what did it feel like to listen to your story?" 5 min.
  4. The participants move into groups of four. They share their reflections using the 1-2-4 format of 1-2-4-All and ask: "What patterns are revealed in the stories? What importance do you assign to the pattern?" 5 min.
  5. The whole group asks: "How could HSR be used to address challenges revealed by the patterns? What other Liberating Structures could be used?" 5 min.
Introduction3 min
Stories15 min7 min each
TellsListens without advising
Listens without advisingTells
Reflection in pairs5 min
Patterns in groups of four5 min
Plenary5 min
The sequence of Heard, Seen, Respected with the Field Guide timings. In each pair, the participants take turns to tell and to listen. By our calculation, the steps add up to 33 minutes. The book states 35 minutes.

By our calculation, the book's steps add up to 33 minutes. Its heading states 35 minutes.

The three published versions

The book also contains a slide titled "HSR Steps". It keeps the 7 minutes per story. It then has groups of four to eight people reflect with What, So What, Now What?

ItemThe book's Field GuideThe book's slideThe authors' site
Stated duration35 minNoneAbout 30 min
Introduction3 min: the purpose of the exerciseNone1 min: the invitation
Choosing the storyNo time setNo time set2 min of reflection alone
Stories in pairs7 min each, 15 min for the step7 min each5 min each, 10 min for the step
The listener's questionsQuestions such as "What else?" or "What happened next?"If needed, questions such as "What else?", "Go on" or "Tell me more""What happened next?" only. Silence if the storyteller finishes early
Reflection in pairs5 minNone7 min
Patterns5 min in fours using 1-2-4Groups of 4 to 8 with What, So What, Now What?5 min in fours
Plenary5 min: how to use HSR and which other structuresNone5 min: where deep listening would be most useful
Calculated total33 minCannot be calculated30 min
Inspiration citedThe Seeds of Compassion practitioners and consultant Mark JonesNoneThe Dalai Lama
Heard, Seen, Respected by source. Each column follows a single source. The totals are our calculation.

The site's steps add up to the 30 minutes it states. The book and the site put the same questions to the group of four. In our view, a first session should follow the book's sequence. It should take from the site the two minutes for choosing a story and the text displayed for storytellers and listeners. It would then last the 35 minutes that the book states.

The listener's rule

The site asks the listener for quiet presence: they listen and do not respond. The book limits interruptions to prompting questions such as "What else?" or "What happened next?"

According to the book, the listener notices when they judge what is right or wrong and when an idea for helping comes to them. They then let the judgement and the idea go.

In our view, the permitted questions prompt the story without steering it. "Why?" asks the storyteller to justify themselves. "What happened next?" leaves the storyteller to choose what comes next.

Choosing and protecting the story

According to the book, the facilitator says in the introduction that the first story that comes to mind is often the best. The facilitator adds that anyone may set aside their most painful story. The site gives each person two minutes alone to choose a story they can tell safely.

According to the book, the listener asks the storyteller which parts of the story the listener may share. The site asks everyone to keep the stories confidential. It asks the storyteller to describe the situation without blaming others.

Online

The site describes the online version. The pairs work in breakout rooms. The tech host prepares the rooms of four during the stories. If merging the rooms causes problems, the group skips the reflection in fours. The site nevertheless recommends the full 1-2-4-All cycle. It also offers 1-3-All in its place.

What makes HSR fail

The pitfalls that follow are our judgement.

A listener who advises or reassures turns the story into a problem to solve. The storyteller stops telling and responds to the advice. The facilitator prevents this drift by displaying the permitted questions and repeating them before the first story.

A story repeated outside the room destroys the trust that HSR sets out to build. The group of four and the plenary therefore talk about patterns and never about the content of a story. The storyteller decides what leaves the pair.

A group that skips steps 4 and 5 of the book leaves each experience inside its pair. It names no pattern.

An employee who tells a story in front of their manager chooses a harmless one. The facilitator therefore forms the pairs outside the reporting line. The book nevertheless suggests HSR to improve a reporting relationship. That use requires the manager and the employee to have chosen to pair up.

The book suggests HSR after a loss and for "catharsis and healing". The facilitator leads a listening exercise between colleagues. If a story brings suffering or harassment to light, the facilitator refers the person after the session to the company's person of trust or to a specialist.

Variation

The book suggests replacing "respected" with "loved" if the facilitator feels brave. It means love in the sense of agape: seeking the highest good in others without expecting personal gain. The site reserves this variation for groups where trust is high.

HSR in strings

The book suggests stringing HSR together with other structures that help mend a relationship: Troika Consulting, Helping Heuristics, Generative Relationships STAR, Appreciative Interviews and Conversation Café. The site keeps Helping Heuristics, Generative Relationships STAR and Appreciative Interviews.

In the book, the first round of Helping Heuristics refers to HSR: in it, the coach listens with compassion (Quiet Presence). A team that scores low on the "Tuning" item of Generative Relationships STAR can follow up with HSR.

AI considerations

During the stories, no language model takes the listener's role. HSR has colleagues practise listening to one another. A model that listens in their place deprives them of the exercise.

Before the session, a model can translate the invitation and the introductory text for a bilingual group. The facilitator checks that the permitted questions stay open. A German version renders "What happened next?" as "Wie ging es weiter?" A "Warum?" would change the rule.

After the session, a large group can hand a model the patterns that the groups of four noted. With sixty participants and fifteen groups of four, the model groups similar patterns to prepare the next step. The facilitator compares each grouping with the groups' sheets.

The stories stay out of every AI service. They may touch on health or the intimate sphere. The Federal Act on Data Protection governs companies and the federal administration. It classes this information as sensitive personal data (Art. 5 let. c no. 2 FADP). A cantonal administration applies the law of its canton. The sheets of the groups of four carry only patterns without names. A pattern appears on them only with the storytellers' consent.

Examples

The sheet of a group of four shows what step 4 produces: patterns detached from the stories.

PatternStories where it recursImportance according to the group of four
"The decision was made before the meeting where we were consulted."3 of 4High: according to the group, this pattern discourages people from speaking up in meetings.
"Nobody followed up on the warning I had given."2 of 4High: according to the group, a warning with no follow-up exposes the office to a risk.
"People introduced me by my former department rather than by my role."2 of 4Medium: the group sees it as an effect of the merger.
For the plenary: hold an HSR between the heads of the two former departments.
Constructed case. A group of four meets in a cantonal IT office two months after two departments merged. The questions are the book's. Neither source asks for a sheet.

Each pattern fits in one sentence that several storytellers could have spoken. Each storyteller agreed that their pattern could appear on the sheet.

Visualisations

A diagram shows the sequence according to the Field Guide: the timings, the size of the groups and the listener's place. The published versions and the sheet of a group of four fit into rows and columns.

Cost

PhaseLevelJustification
PreparationLowDisplay the invitation and the permitted questions. Set out the chairs in pairs in a room without tables.
ExecutionMedium35 minutes according to the book and about 30 according to the site. In our view, the facilitator must be able to deal with strong emotion and stop a listener who gives advice.
DocumentationLowNeither source asks for a record. In our view, one sheet of patterns per group of four is enough.

Tooling

The pairs sit on two chairs facing each other in a room without tables. A poster or a slide gives the invitation, the permitted questions and the confidentiality rule. A bell or a displayed timer announces the change of storyteller. Each group of four notes its patterns on a sheet or a flip chart.

Remotely, Zoom or Microsoft Teams split the participants into rooms of two, then of four.

Sources

Henri Lipmanowicz and Keith McCandless designed Heard, Seen, Respected. The book cites Seeds of Compassion practitioners and consultant Mark Jones as its inspiration. The site cites the Dalai Lama. Facilitator Chris Corrigan reports that the Dalai Lama challenged Mark Jones to build a compassion practice on the idea that everyone needs to be seen, heard and loved. Jones named it "hizzle" after the acronym HSL. According to Corrigan, the authors of Liberating Structures took up this practice and modified it. The book is published under a Creative Commons BY-NC-SA 3.0 licence. The site publishes the structure's page under a BY-SA 4.0 licence.

  • Henri Lipmanowicz, Keith McCandless, The Surprising Power of Liberating Structures: Simple Rules to Unleash a Culture of Innovation, 2013, ISBN 978-0-615-89337-2: the description of Heard, Seen, Respected with its invitation, its steps, its purposes, its tips, its variation, its strings, its examples and its attribution (Field Guide, part four); the "HSR Steps" slide; the cross-references from Helping Heuristics, Troika Consulting, Wise Crowds and Generative Relationships STAR.
  • Heard, Seen, Respected, Liberating Structures: the site's version with its invitation, its roles, its timings, its introductory text, its online format, its variation, its strings, its attribution and the "Build Trust as You Go" principle.
  • Chris Corrigan, Heard, Seen, Loved: the account that attributes to Mark Jones the practice that inspired HSR.
Growth-share matrix
All techniques
Heijunka