Grief Walking
Grief Walking is a meeting structure from Liberating Structures in which a group supports a person after a loss or during a transition. Each participant works alone and completes four sentence starters about a loss they have lived through. One or two volunteers become walkers. The guide runs the session and walks beside the walker. The walker moves from one subgroup to the next and reads one sentence at each station. After each sentence, at most two participants from the station may join the walker in silence and walk with them to the next station. The walker and their accompanists first say what they experienced. Then the whole group shares. The Liberating Structures site states about 35 minutes per cycle and sets a minimum of twelve participants.
Goal
Grief Walking helps participants offer or receive social support after a loss or during a difficult transition.
The Liberating Structures page on Grief Walking states that it is neither therapy nor an attempt to fix what is broken. Participants offer each other empathy and care. The site links Grief Walking to its third principle: "Build Trust as You Go".
The session produces no document. The written sentences stay private except those that the walker reads. At the end, the group names situations where it could use the structure again.
In a change project, the business analyst meets teams that lose a tool, a workplace or colleagues. In our view, the analyst hands the structure to a guide who can deal with strong emotions. You will find the other structures in the repertoire under Liberating Structures.
Usage
When to use it
- Team in a reorganisation: the structure helps the team work through the reorganisation.
- Loss experienced by caregivers or managers: the structure helps them face the loss together.
- Decommissioning a system: in our view, the team that built the old system says what it loses before the migration.
- Large group: each subgroup of fifteen to twenty people gets its own guide.
- Remote team: the session runs online, but non-verbal cues get lost there.
When not to use it
- Acute distress in a participant: the structure is not therapy. Refer the person to a doctor, a psychologist or the company's confidential counsellor.
- Fewer than twelve participants: the page sets this minimum. Have people listen in pairs with Heard, Seen, Respected.
- A loss that people cannot voice in front of colleagues: layoffs under way or an internal investigation. Have each person write alone with Spiral Journal, whose prompts the site adapts to a loss.
Description
The elements of the structure
The site describes each structure by its design elements: the structuring invitation, the space and materials, the distribution of participation, the group configuration and the steps with their timing. The structuring invitation asks the group to create a space where each person shares experiences of loss and supports the others.
The room offers four separate areas: the stations. If possible, a private room nearby becomes the recovery room. Each participant receives paper or a notebook and something to write with.
The roles are the guide, one or two walkers and the accompanists. The guide runs the session and walks beside the walker. Online, a technical host is added to these roles. Every participant may become a walker or an accompanist. The page sets a minimum of twelve participants. Participants work alone, then in subgroups, then as a whole group.
The sentence starters
The page gives the four sentence starters in English. The guide displays them in the group's language.
| No. | Sentence | What it asks participants to write |
|---|---|---|
| 1 | The loss happened | That the loss happened. The starter affirms it. |
| 2 | What is difficult | What makes the loss difficult. |
| 3 | What will remain | What the participant will keep in memory. |
| 4 | What may become possible | What could become possible now that the loss is written down. |
The fourth sentence leaves its ending open. The page uses the phrase "it may be possible to". In our view, a translation that promises an outcome ("now I can") drops this caution. The participant writes what may become possible.
The sequence
- Introduction (3 min): the guide shares the invitation and describes the sequence. The guide says that the structure neither heals nor repairs anything. Answers stay private until their author shares them. The guide explains how to reach the recovery room.
- Sentences (5 min): each person reflects alone on a loss or a transition. Each completes the four sentence starters on display.
- Call for volunteers (1 min): the guide asks for one or two walkers.
- Instructions (5 min): the first walker comes to the front of the room. The guide explains the walk.
- Walk (8 to 10 min): participants form four subgroups within earshot around the room. The walker visits each station and reads a sentence there. The guide stays beside the walker.
- Sharing (7 min): the walker and their accompanists stay together and look back on the walk. The guide asks the accompanists what made them join the walk and what they noticed. The guide then asks the walker how the walk felt. The whole group then shares its reflections.
- Other uses (3 min): each person considers situations where they could use the structure.
- 3 minIntroductionWhole group
- 5 minSentencesAlone
- 1 minVolunteersWhole group
- 5 minInstructionsWhole group
- 8 to 10 minWalkFour subgroups
- 7 minSharingWalker and accompanists, then whole group
- 3 minOther usesWhole group
- 32 to 34 min by our count
- The page states about 35 min
By our count, the steps add up to 32 to 34 minutes. The page's subtitle states about 35 minutes per cycle. On our reading, a cycle covers one walker. With a second walker, the walk and the sharing repeat. The session then lasts 47 to 51 minutes: 32 to 34 minutes for the first cycle and 15 to 17 minutes for the second walker.
The walk
The walker arrives at the first station with the guide. The walker reads a sentence. Everyone pauses. A participant moved by the sentence then goes with the walker and the guide to the next station. Each station sends at most two accompanists so that the group around the walker stays small.
According to the page, the walker reads one sentence at each station: four stations for four sentences. The other participants support the walker in silence. If nobody joins, the walker moves on with the guide. In our view, the silence of the station is support too.
An accompanist may rest a hand gently on the walker's shoulder if the walker agrees. In our view, the guide asks for this consent before the walk. A walker who is moved finds it hard to refuse a gesture halfway through reading.
The page speaks of a "first walker". On our reading, the second volunteer walks the route after the first.
The recovery room
The recovery room receives a participant overwhelmed by emotion. The guide prepares for intense emotions.
The guide does not leave the walker. In our view, a second person therefore stands ready to take someone to the recovery room.
Preparing the group and the venue
The page recommends inviting each person to choose a loss they feel ready to talk about. It advises a place where people move easily, where voices carry and where the light is good. It names a place of worship or an outdoor space with even ground.
In our view, a company is more likely to choose a large bright room or a park. In a team going through a reorganisation, the guide speaks of loss or transition rather than grief. Each person then chooses whether to write about the reorganisation or about another loss.
Online
The page adapts the facilitation to video conferencing.
| Element | In the room | Online |
|---|---|---|
| Writing the sentences | Each person writes alone | Each person writes alone with camera and microphone off |
| Stations | Four subgroups around the room | The walker stays in plenary |
| Joining the walker | Walk with the walker to the next station | Turn on camera and microphone and tell the walker that you are walking with them |
| Gesture of support | A hand on the shoulder if the walker agrees | A gesture to the camera, a word out loud or in the chat |
| Between two sentences | Everyone pauses | The accompanists turn off camera and microphone |
| Guide | Beside the walker | Narrates more to show their presence |
| Recovery room | A private room nearby | A breakout room |
| Roles | Guide, walkers and accompanists | A technical host spotlights the guide, the walker and the accompanists |
Facial expressions, posture, small gestures and tone of voice matter in Grief Walking. Online, these signals are easily lost.
Large group
With a large group, the first session takes place in the main room. The group then splits into subgroups of fifteen to twenty people. Each subgroup gets a facilitator as its guide. This facilitator repeats the instructions and the steps.
What makes Grief Walking fail
The pitfalls that follow are our judgement.
An accompanist who comforts or advises out loud turns the walk into a conversation. The walker answers instead of reading. During the instructions, the guide reminds everyone that support stays silent until the sharing.
A manager who designates the walker turns support into exposure. The page asks for volunteers. Nobody has to walk or accompany.
The executive who decided on the reorganisation sometimes stands at a station. The walker then weighs every word in their presence. The guide talks with this executive before the session. If the executive takes part, they listen without explaining or justifying the decision.
During the sharing, a group that discusses the loss itself drifts towards solutions. The page's questions are about what each person experienced during the walk. The guide sticks to them.
A sentence repeated outside the room destroys the trust that the structure sets out to build. What the walker read leaves the room only if the walker chooses to pass it on.
A sentence can bring up distress that goes beyond the scope of the session. While the walk continues, the second person takes the participant to the recovery room. The guide speaks with the participant after the session.
Grief Walking in a string
Liberating Structures combine into strings. After Grief Walking, the group moves on to a quiet moment or a short activity involving movement. It can also continue with Critical Uncertainties to face difficult situations.
Origin
Fisher Qua and Keith McCandless prototyped Grief Walking in the Seattle LS User Group. The page recommends further reading on grief by Stephen Jenkinson and Joanna Macy.
AI considerations
Before the session, a language model translates the invitation and the four sentence starters for a bilingual group. The guide checks that the fourth sentence keeps its hedge ("may") in each language.
No model writes a participant's sentences. An ending proposed by a model replaces the participant's words with stock phrases.
The sentences stay on paper and out of any AI service. They often touch on health or the intimate sphere. The Federal Act on Data Protection applies to companies and to the federal administration. It classes this information as sensitive personal data (FADP, Art. 5 let. c no. 2). A cantonal administration applies the law of its canton. Online, the technical host therefore turns off the transcript and the meeting assistant (Copilot in Teams, Zoom AI Companion). Otherwise the walker's sentences end up in a stored transcript and in a summary.
Examples
In this constructed case, an IT team decommissions the case management application that it has maintained for fifteen years. Sixteen people take part in addition to the guide and the person who stands ready for the recovery room. The first walker is a developer from the team.
| Station | Sentence | Ending written by the walker | Join the walker | Around the walker on leaving |
|---|---|---|---|---|
| 1 (4 people) | The loss happened | "…the application I have maintained for fifteen years shuts down on 30 June." | 2 | The guide and 2 accompanists |
| 2 (4 people) | What is difficult | "…I know every calculation rule and nobody will ask me about them any more." | 1 | The guide and 3 accompanists |
| 3 (4 people) | What will remain | "…the night three of us fixed the year-end closing." | 2 | The guide and 5 accompanists |
| 4 (3 people) | What may become possible | "…pass these rules on to the team that is configuring the new software package." | 1 | The guide and 6 accompanists |
The six accompanists stay silent throughout the walk. They speak during the sharing, when the guide asks them what made them join the walk.
Visualisations
A diagram shows the room from above during the walk: the four stations, the walker's route and the recovery room. A second diagram places the steps on a time axis with their durations. The four sentences, the online facilitation and the example walk fit in tables.
Cost
| Phase | Level | Justification |
|---|---|---|
| Preparation | Medium | Find a venue with four stations within earshot and a recovery room. Translate and display the sentence starters. Plan a second person for the recovery room. |
| Execution | Medium | About 35 minutes per cycle with at least twelve participants. On our reading, a cycle covers one walker. With a second walker, the session lasts 47 to 51 minutes. In our view, the guide must be able to deal with intense emotions. |
| Documentation | Low | The sentences stay private. The page does not call for a record. At most, the guide notes the other uses named in the last step. |
Tooling
In the room, each participant writes on a sheet or in a notebook. A poster or a screen shows the four sentence starters. Four groups of chairs or floor markings mark out the stations. A timer helps the guide keep to the timings. A closed room next door is the recovery room.
Remotely, a video-conferencing tool with breakout rooms (Zoom, Microsoft Teams) hosts the session. Spotlighting shows the guide, the walker and the accompanists. A breakout room becomes the recovery room. The technical host turns off the transcript and the meeting assistant.
The page points to a folder of materials and to a slide that summarises the elements of the structure.
Sources
The Liberating Structures site publishes the structure under a Creative Commons BY-SA 4.0 licence.
- Grief Walking, Liberating Structures: the full description of the structure, its variants and its attribution.
- Federal Act on Data Protection (FADP), SR 235.1, Art. 5 let. c no. 2: data on health and the intimate sphere, which the Act classes as sensitive personal data.

