Gallery Walk
The Gallery Walk is a workshop format in which participants move between posters hung on the walls as in a gallery. Each person reads the content at their own pace. They then discuss it with another participant or note what matters to them. Two published forms carry this name. In the Liberating Structures form, the group rereads its own results and discusses them in pairs in front of the posters. In the design thinking form, stakeholders read the data from field research and note what matters for the design.
Goal
The Gallery Walk has a group read content displayed on the walls: the results it has just produced or the data from field research.
According to the Liberating Structures page, a workshop produces flipcharts, slides and sticky notes. Eventually these results fall off the walls or vanish from the whiteboard before anyone has reread them. The page names a worse case: the facilitator summarises them at their own pace and keeps what they find relevant. In both cases the participants have little chance to go back over what they produced. The Gallery Walk has them reread these results at their own pace.
In the Harvard Business Review, Jeanne Liedtka describes another use. The project team displays the field data that it judges most important. Stakeholders read the data and note what matters for the design. According to Liedtka, the project team is then less likely to see only what it wants to see in the data because the people interviewed become real to those who walk through the gallery.
The deliverable depends on the form. The Liberating Structures form produces conversations in pairs and no document. The design thinking form produces notes that small teams group by theme. From these clusters, the group draws the insights that feed the design criteria.
You will find the other structures under Liberating Structures.
Usage
When to use it
- After interviews or observations: have the stakeholders read the field data before the team groups it in an affinity map. Liedtka places the format at this point.
- Stakeholders who were not in the field: let them meet the interviewees through their photos and quotations.
- End of a workshop day: reread the results on the walls in the order in which the group produced them.
- After work in subgroups: in our view, the room reads all the results instead of listening to one spokesperson per subgroup.
- Before a presentation: display the slides to prepare the group or to collect its concerns. The page describes this use.
- From 8 to more than 99 participants: the page covers this whole range.
- Individual reflection: the page describes a solo variant in which one person walks through their results.
- Remote team: the page describes an online version with pairs formed at random.
When not to use it
- Nothing to display: the format has people read content that already exists. Produce the material first through interviews, an observation or a 1-2-4-All.
- A choice to settle: the Gallery Walk has people read and react without ranking the options. Compare them in a decision matrix.
Description
The forms published under this name
Both forms start with the walk through the gallery. They differ in what hangs on the walls, in who visits and in what the group draws from it.
| Point | Liberating Structures form | Design thinking form |
|---|---|---|
| Source | liberatingstructures.de page | Article by Jeanne Liedtka in the Harvard Business Review (2018) |
| Content displayed | The results that the group produced: flipcharts, slides, notes | The field data that the project team judges most important. The team writes them on large posters |
| Visitors | The group that produced the results | Stakeholders whom the project team invites |
| During the walk | Each person rereads the posters. The participants then talk in pairs in front of the poster that each question points to | Each person writes down on sticky notes the data that they consider essential to the design |
| After the walk | No step in this form. The format prepares the next structure or takes up the results of the previous one | Small teams group the notes by theme and draw insights from them |
| Result | Conversations in pairs | Clusters of notes and insights |
| Duration | 6 to 25 min stated. The steps add up to 7 to 40 min | Not stated |
| Group size | 8 to more than 99 participants. Solo variant | Not stated |
| Online | Pairs formed at random | Not covered |
In teaching, the same name refers to a third format. Teams of students rotate between posters that each carry a question. At each poster, the team writes its answers for three to five minutes and then moves on to the next one. At the end, each team presents a summary of the answers to one question.
The Liberating Structures form
The quotations from the liberatingstructures.de page are translated from German. The page's invitation asks the group to stroll through shared information and ideas and look at them more closely. Each person processes the content at their own pace, spots what attracts them and what raises questions, uncovers what remains unclear and understands the information presented better. The page also gives the format the names Walk About and Walk Around.
If the group did not produce its results on the walls, the facilitator hangs them there before the walk. The page advises hanging them in the order in which the group produced them. The facilitator can also design the workshop so that the group produces its results on the walls in clockwise order. Finally, the facilitator can ask the group to hang the day's results itself at the start of the walk.
- Free walk. The participants walk through the gallery, note where the posters hang and reread their content. 3 to 15 min.
- Questions. The facilitator asks one question at a time. Each question sends the participants to a poster, where they discuss it in pairs. Example from the page: "Go to the poster that inspired you most today. Why? Talk about it with another person in front of the poster." 2 to 5 questions of 2 to 5 min each.
The page states a typical duration of 6 to 25 minutes. Its own steps add up to 7 to 40 minutes. The minimum is 3 minutes of walking plus two two-minute questions. The maximum is 15 minutes of walking plus five five-minute questions. In our view, a facilitator who wants to stay within the stated 25 minutes limits the walk to 10 minutes and asks three five-minute questions.
For the free walk, the page advises giving the group a short prompt to guide the walk: "Go through the results again. Stop at the ones that still speak to you or that surprised you." The prompt can also prepare what follows: "What is the one thing I want to take back into my daily life?"
The page suggests these questions:
- What information surprised you? Why?
- What information gives you new ideas? Which ones?
- What information moves you to act? Why?
- What information can help us move forward? Why?
- What information must we put into practice? Why? How?
- What information triggers the strongest resistance in you? Why?
- What information seems mysterious to you and yet attractive? Why?
According to the page, each participant focuses on what seems relevant to them. This is almost never the same thing for everyone.
Online, the facilitator finds it harder to send each pair to a poster. The page advises forming pairs at random. Each participant tells the other about the poster they chose. Each person hears a view on a second poster.
In the solo variant, one person walks through the gallery. The person asks their own questions and reflects in front of the poster that answers each one.
The page also suggests sharing the slides of a presentation in advance. The questions then become "Which aspect of which slide speaks to you?" and "Which aspect do you find puzzling?"
According to the page, many facilitators have adopted the Gallery Walk. The page adds that it could be classed among the punctuations, since it serves mainly to prepare the next structure or to deepen the results of the previous one.
The design thinking form
Liedtka places the Gallery Walk in the discovery phase of a design thinking project. This phase moves through immersion in user experiences, sense making and alignment. The Gallery Walk belongs to sense making. According to Liedtka, the enthusiasm that ethnographic methods arouse often fades when non-designers are overwhelmed by the mass of qualitative data. The Gallery Walk gives them a procedure for making sense of that data.
- The project team selects the most important field data and writes it on large posters. A poster often presents one interviewee with their photo and with quotations that capture their point of view.
- The team hangs the posters around a room.
- Stakeholders tour the gallery. Each of them writes down on sticky notes the data that they consider essential to the design.
- The stakeholders form small teams. They share their notes, combine them and sort them by theme.
- The group draws insights from these clusters.
Liedtka calls step 4 a "carefully orchestrated process". In our view, the facilitator runs this grouping with an affinity map.
According to Liedtka, the gallery also gives the participants a common database. They interact, reach shared insights together and challenge one another's individual takeaways. She sees this as a second guard against biased interpretation.
Alignment follows sense making. Workshops in this stage set the design criteria, that is the features that an ideal innovation should have.
Preparing the posters
In our view, a poster carries a single interviewee or a single observation. A visitor reads it from two metres away. It holds a title, three to five verbatim quotations and the facts that tell the visitor who the person is. A paraphrased quotation already carries the team's interpretation. A poster covered in text makes the visitors read a report. When the material is a report, the team first extracts the data through document analysis and then displays it.
The photo of an interviewee is personal data within the meaning of the Federal Act on Data Protection (FADP, Art. 5 let. a). As long as the person can be identified, their statements are personal data too. The team displays a photo only with the person's consent. Without that consent, the poster describes the person by role and age: "Insured woman, 58". The team also removes the names and the details that would identify the person from the quotations.
In our view, the facilitator numbers the posters. Each visitor copies that number onto their note. When a note is disputed during grouping, the team traces it back to the original data.
What makes a Gallery Walk fail
In our view, a Gallery Walk fails when the facilitator mixes the two forms. A sponsor who expects a synthesis does not get one from the Liberating Structures form. A design thinking form without grouping leaves notes that nobody uses. The facilitator announces which form they are running and what it produces.
In our view, when the project team selects the data to display, it reintroduces the bias that the format should remove. A team that displays only the quotations that fit its hypotheses shows the stakeholders what it wants to see. So the team also displays the quotations that contradict its hypotheses.
According to Liedtka, the mass of data overwhelms non-designers. A gallery that displays all the data recreates that mass. The team displays the most important data and keeps the rest in its field notes.
In our view, stakeholders often note a solution rather than a data point. Liedtka has them note the data essential to the design. A note such as "Refund within five days" chooses the solution before alignment. In the instruction, the facilitator reminds them that each note records what the interviewee experiences or says.
In our view, a note stuck on the poster steers the visitors who come after. In a room where hierarchy carries weight, a manager's note becomes the way everyone reads the poster. The visitors keep their notes with them until they work in small teams. Liedtka has the teams share the notes at that point.
Neighbouring techniques
The team download comes from the tradition of the d.school and IDEO. It sits at the same point in the project. The team that did the fieldwork displays its notes, photos and quotations. It then talks the other members through them. In a Gallery Walk, nobody presents: the visitors read.
In Shift & Share, a presenter holds each station and small groups come to listen.
The affinity map starts where the design thinking form produces its notes. It groups the notes by similarity and names the themes. The Liberating Structures form has no grouping step.
AI considerations
Neither Liedtka's article nor the Liberating Structures page mentions AI.
Before the walk, a language model can extract candidate quotations for the posters from interview transcripts. A model often summarises in its own words. It can also produce a quotation that the person never said. According to Liedtka, the project team chooses the data to display. A model can also search the transcripts for the quotations that contradict the team's hypotheses. The team checks every quotation against the transcript before displaying it.
Transcripts are personal data within the meaning of the FADP (Art. 5 let. a). The FADP applies to private persons and to the federal administration. A cantonal administration applies the law of its canton. Before passing a transcript to an external AI service, the team removes the names and the details that would identify the person.
After the walk, a model can transcribe the photos of handwritten notes into a list. The team checks the list against the photos because a model misreads hurried handwriting. A model can also propose groupings by theme. Liedtka leaves this sorting to small teams of stakeholders, who challenge one another's readings as they sort. A model that returns finished groupings removes that challenge.
For the Liberating Structures form, a model can adapt the page's questions to the day's session. The facilitator checks that each question sends the participants to a single poster.
Examples
Liedtka calls the visitors' notes "observations". A note therefore records a data point from the poster and leaves the solution to the later stages of the project.
| On poster 3 | Note that records the data point | Note that chooses a solution |
|---|---|---|
| "I tried the app once. I never knew whether my invoice had arrived." | 3: does not know whether her invoice arrived | 3: send an acknowledgement of receipt by SMS |
| "I sometimes wait six weeks. Until then, I'm CHF 600 out of pocket." | 3: CHF 600 out of pocket for six weeks | 3: refund within five days |
| Sends her invoices by post | 3: sends her invoices by post | 3: scan the mail when it arrives |
| "My daughter helps me with everything that goes through the Natel." | 3: her daughter helps her with everything done on a mobile phone | 3: give relatives access |
During grouping, the first two notes in the second column form one theme: waiting without confirmation and the money paid out of pocket. The next two form another: paper and help from a relative. The notes in the third column each fix an answer before the group has named these themes.
Visualisations
A diagram shows the two forms: the walk, then either the pairs in front of the posters or the notes grouped by theme. A table compares the two forms source by source. Another diagram shows what a poster carries. A second table shows the notes that a poster prompts.
Cost
| Phase | Level | Justification |
|---|---|---|
| Preparation | Medium | Liberating Structures form: hang the existing results. Design thinking form: select the data and make the posters. The article puts no figure on this effort. |
| Execution | Low | Liberating Structures form: the page states 6 to 25 minutes, its steps add up to 7 to 40. Design thinking form: the article gives no duration. The "Low" level therefore rests on the Liberating Structures form alone. |
| Documentation | Low | The Liberating Structures form leaves no record. The design thinking form leaves notes and clusters to photograph and transcribe. |
Tooling
An in-person session needs bare walls, A1 or A0 posters and adhesive tape. The design thinking form also needs sticky notes and markers. Mobile pinboards replace the walls in a room with glass walls. A timer on display paces the questions. A mobile phone is enough to photograph the posters and the notes at the end of the session.
Remotely, an online whiteboard such as Miro or Mural holds the gallery. Zoom or Microsoft Teams split the participants into breakout rooms of two.
Sources
Jeanne Liedtka presents the Gallery Walk as a design thinking exercise. The Liberating Structures form rests on a page of the German-language site liberatingstructures.de, which Holisticon AG sponsors and translates.
- Jeanne Liedtka, "Why Design Thinking Works", Harvard Business Review, September-October 2018: the place of the Gallery Walk in the discovery phase, its steps and the guard against bias.
- Gallery Walk, liberatingstructures.de: the invitation, the steps and their durations, the group size, the tips, the questions, the online version and the variants.
- Carsten Sahling, "Was heißt eigentlich dieses 33+?", liberatingstructures.de, 2022: the definition of the structures "in development".
- Mark Francek, Gallery Walk, SERC, Carleton College, 2005: the classroom form.
- Federal Act on Data Protection (FADP), SR 235.1, Art. 5 let. a: the definition of personal data.

