Techniques Toolbox
A horizontal time axis runs from "Today" on the left to "In 15 to 30 years" on the right. A thin grey arrow runs from left to right and carries the word "Forecasting". On the right, two elders sit by a fire. A thick arrow starts there and runs back to the left. It carries the word "Backcasting". Four numbered markers refer to the youths' questions. Markers 1 and 2 sit at "Today": the hard times and the hope. Marker 3 sits close by: the first small steps. Marker 4 covers the middle of the axis: the strength to go on and the unexpected help.

Future~Present

Future~Present is a Liberating Structures meeting structure. A group imagines that it lives fifteen to thirty years from now and has reached its goals. In each small group, two participants play the elders who remember the old days. The others play the youths. Around an imaginary campfire, the youths ask the elders how this future became possible. In plenary, the group then records the first steps, the support and the patterns that the elders named. Keith McCandless and Fisher Qua developed the structure. Their site gives it about 25 minutes.

Goal

Future~Present is a meeting structure in which a group moves into a successful future and tells how it got there. In this story, the group finds opportunities to act today by building on its first small wins.

The structure's page on the Liberating Structures site calls this way of working "backcasting" and contrasts it with forecasting. The title of the page states the purpose: notice the tactics in the present that shape a more attractive future. It links the structure to the ninth Liberating Structures principle: "Engage in Seriously Playful Curiosity".

In plenary, the facilitator records the ideas and highlights: the changes, support and patterns that the elders credit with the group's success.

For the business analyst, the record supplies first steps to propose, stakeholders to involve and patterns of work to keep. You will find the other structures in the repertoire under Liberating Structures.

Usage

When to use it

  • End of a strategic planning session: the group leaves with ways to invest in its future.
  • Launch of an initiative: the group names what must happen in the first weeks.
  • A group stuck in a rut: the story of a successful future moves the conversation from obstacles to first steps.
  • After Ecocycle Planning: the group imagines the lasting effect of the changes that move its activities out of the scarcity or rigidity trap.
  • Distributed team: according to the page, the structure works online with no major adjustment.

When not to use it

  • No shared goal: the elders have no shared success to tell. Clarify the goal first with Nine Whys.
  • Several futures to compare: the structure tells one successful future. Cross two uncertainties with Critical Uncertainties.

Description

The elements of the structure

The authors describe every structure through five design elements. The page gives them for Future~Present.

ElementFuture~Present
Structuring invitationThe facilitator invites the group to picture itself fifteen to thirty years from now. The group has worked hard and achieved great things. The facilitator describes a few of them. The younger generation no longer knows today's problems. Elders and youths gather around a campfire to learn what made this future possible
Space and materialsRoom for seated or standing groups of four or five people. An optional handout with the interview questions
Participation distributionA facilitator, the elders and the youths. Online, a tech host. At least four participants. Everyone is invited and has the same opportunity to contribute
Group configurationSmall groups, then the whole group
Steps and time allocationThree steps. About 25 min stated
The design elements of Future~Present.

Telling the story from the future

A forecast starts from today. It extends the trends and runs into the obstacles that the group knows. Future~Present places the group at the finish. The elders take the goal as reached and only have to explain the path. Their story therefore runs back toward the present: today's problems, the first small steps and the people who helped.

A vision statement describes the end state. The youths' questions concern the path that leads there.

The elders look from the future back to today. The first two questions concern the current situation. The third concerns the first small steps. The fourth covers the path travelled afterwards.ForecastingTodayIn 15 to 30 yearsThe hard timesThe turmoiland the hopeThe strength to go onand the unexpected helpThe first small steps1234BackcastingThe elders The elders look from the future back to today. The first two questions concern the current situation. The third concerns the first small steps. The fourth covers the path travelled afterwards.ForecastingTodayIn 15 to 30 years1234BackcastingThe elders
  1. 1The hard times
  2. 2The turmoil and the hope
  3. 3The first small steps
  4. 4The strength to go on and the unexpected help
The elders look from the future back to today. The first two questions concern the current situation. The third concerns the first small steps. The fourth covers the path travelled afterwards.

The roles around the fire

The participants form groups of four or five. In each group, two people play the elders. The others play the youths. The youths interview the elders with the questions from the page. They lean forward and look the elders in the eye. Their gestures show that they are listening. The elders also listen to each other. They improvise by the "yes, and…" rule: each one picks up what the other has just said and extends it.

According to the page, participants do not always grasp the relation between the roles. In our view, the facilitator states it in one sentence: the elders walked the path and the youths were born after the hard times. The elders volunteer. A manager is better cast as a youth.

A group of five around the fire. Two people play the elders and three play the youths. The youths ask the questions. The two elders improvise. Each one picks up what the other has just said.yes, and…QuestionsElderYouth
A group of five around the fire. Two people play the elders and three play the youths. The youths ask the questions. The two elders improvise. Each one picks up what the other has just said.

The youths' questions

The youths ask the questions in this order:

  1. The hard times: everything seemed stuck. Which problems looked insurmountable? The facilitator adds context from the group's own setting to the question.
  2. The turmoil: how did you feel? What gave you hope in the midst of discouragement?
  3. The first small steps: what first small steps did you take? How did you speed up? How did you build and then keep the momentum?
  4. The strength to go on: where did you find it? Who turned up unexpectedly and made you believe that more was possible?

In our view, the order of the questions matters. The first two make the elders describe the group's present as a past they overcame. The last two make them name the acts and the people that the plenary then records.

The steps

  1. Introduction (4 min): the facilitator states the invitation and displays the interview questions.
  2. Campfire storytelling (10 min): each group of four or five appoints two elders. The youths ask the questions. The elders improvise their answers.
  3. Collecting the highlights (10 min): the whole group names the changes, support systems and patterns behind the elders' success. The facilitator records the ideas and highlights.

The steps add up to 24 minutes for the 25 or so that the page states. The diagram on the page gives the introduction 5 minutes. In our view, the facilitator announces the next question about every two and a half minutes. Otherwise the groups run out of time for the last two.

  1. About 25 min stated
  2. 4 minIntroductionWhole group
  3. 10 minCampfire storytellingGroups of four or five
  4. Questions1234
  5. 10 minCollecting the highlightsWhole group
The three steps of Future~Present according to the page. They add up to 24 minutes for the 25 or so that the page states. The split of the storytelling between the four questions is our reading.

The record in plenary

In our view, the facilitator in the room asks each group for one highlight per round. The facilitator writes it on the flipchart. Online, the page suggests Chatterfall: everyone types their answer in the chat and sends it only at the facilitator's signal.

In our view, the business analyst files each highlight under one of the page's three words: change, support or pattern. The analyst adds the follow-up that the highlight calls for in the project: a first step to propose, a stakeholder to contact, a requirement or an indicator to work out. The stories are invented. A line in the record commits the group once the group has chosen it, for example with 15% Solutions.

Online

The page hands the breakout rooms of four or five to a tech host. In our view, the host displays the questions in each room, since the participants no longer see the shared screen.

Stringing it with other structures

StructureWhat it brings according to the page
Nine WhysClarify the purpose
15% SolutionsClarify the next steps
Ecocycle PlanningFind what moves the activities out of the scarcity or rigidity trap
The structures that the page suggests stringing with Future~Present and what each one brings.

In our view, Nine Whys comes before Future~Present: the clarified purpose becomes the future that the elders describe as reached. 15% Solutions comes after: each person picks from the record what they can do now with their own means.

What makes Future~Present fail

An invitation without specific achievements leaves the elders telling a vague future. The invitation on the page asks the facilitator to describe a few achievements. According to its tips, specific goals that the group has already reached help it imagine the future.

A game played without seriousness turns into a joke. A game played without lightness turns into a planning speech. The page asks participants to play seriously with the questions and answers.

Elders who tell the success as a single block with no steps yield no first step. In our view, the youths prompt them: "What was the very first thing you did?"

A plenary in which each group retells its stories uses up the ten minutes set aside for the record.

AI considerations

To prepare the invitation, the facilitator gives a language model the group's goals and the achievements already reached. The model suggests a few specific future achievements. The facilitator keeps those that the group will recognise as its own. The model also suggests the context to add to the first question.

The model translates the invitation and the questions for a bilingual group. A native speaker checks that the tone of the game carries over into the other language.

After the session, the model sorts the Chatterfall answers into changes, support and patterns. The business analyst checks each classification against the text of the chat. The chat carries the participants' names: these are personal data under the Federal Act on Data Protection (FADP). The facilitator replaces the names before handing the text to an external AI service.

In our view, the model does not write the elders' stories. A generated story says nothing about what the group believes possible.

Examples

The residents' registration office of a town in the canton of Vaud closes its strategic planning with Future~Present. Its twenty staff form four groups of five. The invitation places the group in 2050. In that year, every resident completes their formalities online or at the counter as they choose. The office no longer uses paper files. A new arrival registers in five minutes. The business analyst keeps the record.

No.Highlight cited by the eldersTypeFollow-up proposed in the project
1"We started with a single online form: the notification of departure."ChangeFirst step to put to 15% Solutions
2"The counter staff tested each form before it went online."PatternRequirement: user acceptance testing (UAT) by the counter staff
3"The canton lent us its specialist in the residents' register."SupportStakeholder to contact: the cantonal office that keeps the cantonal register of persons
4"Every month, we posted at the counter the number of formalities completed online."PatternIndicator to define with the head of the office
5"Residents over seventy showed us where they got stuck."SupportObservation workshop with older residents
Constructed case. The plenary record at the residents' registration office of a town in Vaud. The type uses the page's three words. The follow-up is the business analyst's proposal.

Visualisations

One diagram places the elders' view on a time axis, from the future back to the present. A second shows a group around the fire with its elders and youths. A third breaks the session down into its three steps. The design elements, the strings and the example's record fit in rows and columns.

Cost

PhaseLevelJustification
PreparationLowWrite the invitation with a few specific achievements, adapt the first question and display the questions.
ExecutionLowThe page states about 25 minutes in the room and online.
DocumentationLowA flipchart of the record or the Chatterfall thread to sort.

Tooling

In the room, a screen or a flipchart displays the invitation and the questions. The page offers an optional handout with the interview questions. A timer helps the facilitator keep to the ten minutes of storytelling. A flipchart takes the record.

Remotely, a video call with breakout rooms (Zoom, Microsoft Teams) carries the stories. Its chat carries the record through Chatterfall. The facilitator saves the chat at the end of the session.

Sources

The page on the Liberating Structures site attributes Future~Present to Keith McCandless and Fisher Qua. The site publishes the structure under a Creative Commons BY-SA 4.0 licence.

  • Future~Present, Liberating Structures: the purpose, the invitation, the design elements, the three steps and their timings, the interview questions, the tips, the uses, running it online, the strings and the attribution.