Folding Spectrogram
Folding Spectrogram is a meeting structure from Liberating Structures. The facilitator reads a statement and names two extreme positions. The participants stand on a line drawn between these ends. They look at where the others stand. A few people from different points on the line explain why they stand there. In person, when positions diverge, the group folds the line at its middle: each person faces someone from the other half and the pair talks for three minutes. The group then repeats the exercise on three to five more statements. The site sets a minimum of ten participants. It gives about 15 to 20 minutes. Added up, its steps give 38 to 64 minutes for four to six statements.
Goal
Folding Spectrogram is a meeting structure in which the participants show their position on a statement by standing on a line.
According to the Liberating Structures site, the line makes the similarities and differences between viewpoints visible. It makes the participants curious about where the others stand. It brings out the issues that will weigh on the group's decision. The site sees it as a way to avoid surprises and traps when the group decides. It links the structure to its principle "Practice Self-Discovery Within a Group".
The session produces a picture of the group's positions for each statement and the reasons a few participants give for them. The page's subtitle places it "on the Way to Deciding".
The business analyst uses it in a workshop where stakeholders from several departments must choose between two options. Within a few minutes the analyst sees whether the group splits into two camps, clusters or spreads out. You will find the other structures of the repertoire under Liberating Structures.
Usage
When to use it
- A group divided into camps: according to the site, a quick round shows what brings people together and what separates them.
- A drifting face-to-face discussion: moving on the line brings the group back to each person's position.
- A choice between competing requirements: stakeholders from several departments show where they stand between two options.
- A requirement contested after a review: see who contests it and why before reopening the discussion.
- An online meeting: without the fold, each person places a dot on a shared line.
When not to use it
- Fewer than ten participants: the line stays too short to show a distribution. Have people think alone, in pairs and then in fours with 1-2-4-All.
- Positions that are risky to show in front of management: each person takes a place in full view. Collect the positions with an anonymous survey.
- Known positions with only the choice left: the line teaches nothing new. Have the group choose with dot voting or a decision matrix.
Description
The elements of the structure
The site describes each structure through five design elements. The structuring invitation of Folding Spectrogram reads: "Let's do a quick activity that will get us thinking and connecting around how we respond to an issue we're facing."
The room is large enough for the whole group to stand on a single line. A large group needs a microphone. The facilitator prepares statements. The roles are the facilitator and the participants. Online, a technical host assists the facilitator. The page sets a minimum of ten participants. Everyone receives the same invitation and the same opportunity to take part. The participants work alone, then as a whole group.
Writing the statements
The page asks for statements that get to the heart of the challenge and allow more than a yes or a no. Each end names a position that someone in the room could hold.
| Weak statement | Defect | Replacement statement | Left end | Right end |
|---|---|---|---|---|
| "Do we need a portal?" | A yes-or-no answer. | "The portal replaces the paper form." | From go-live | Never for small employers |
| "The portal rejects incomplete declarations and calculates contributions live." | Two statements in one. Each person answers the half they prefer. The line mixes two questions. | "The portal rejects an incomplete declaration." | The portal blocks submission | The case officer completes it later |
| "Digital transformation is a priority." | A principle that nobody contests. It commits the group to no decision. | "The office opens the portal before the January annual payroll declaration." | Open in January and fix afterwards | Test for a year first |
The facilitator starts with the statements that are easy to answer and moves on to the harder or more ambiguous ones. The first statement teaches the group the mechanics. The following ones carry the question of the workshop.
The steps
- Introduction (1 min): the facilitator reads the invitation and names the issue that the group will work on.
- Setup (2 to 4 min): everyone gathers at the line marked on the floor. The facilitator explains that each end carries an extreme position and that the middle takes the positions in between. The facilitator can start with a practice statement such as "Chocolate is essential in my life". The facilitator names the ends and each person imagines where they would stand.
- Respond to the statement (2 min): the facilitator reads a statement. Each person goes to their place on the line.
- Look around (2 min): the participants observe where the others stand.
- Share (4 min): a few people from different points on the line explain their position to the whole group.
- Fold (face-to-face only, 4 to 8 min): when positions diverge widely and the group needs to understand them better, the participants fold the line in half. Each person faces someone with another position. The pairs talk for three minutes. In a large group, the line can fold a second time. The pairs then form groups of four for three more minutes.
- More statements (24 to 40 min): the group repeats the steps for three to five more statements.
- Debrief (3 min): everyone returns to the plenary. A few people say what they have learned and what it changes for the next steps.
For three to five statements, 24 to 40 minutes give eight minutes per statement without the fold: the response, the look around and the share.
The page gives about 15 to 20 minutes in its subtitle. For a single statement followed by the debrief, its steps give 14 minutes without the fold and 24 minutes at most with it. Four statements without a fold take at least 38 minutes. Six statements with a fold on the first take at most 64 minutes. The facilitator therefore reserves 25 minutes for one statement and 65 minutes for four to six.
The fold
The group folds the line at its middle to form pairs. The facilitator marks this middle. The right half turns round and walks along the left half. The first person then faces the last. The second faces the second-to-last. According to the page, each person ends up in front of someone who sees the question differently. The facilitator can give the pairs a prompt such as "Tell the other person what made you choose your place". This prompt does not come from the page.
The fold pairs people by their rank in the line, whatever the distance between their positions. The pairs formed near the fold join neighbouring positions. When most participants stand on the same side, the fold also pairs people from the same camp. According to the page, the group folds when positions diverge widely and the group needs to understand them more deeply. The facilitator looks at the line before folding. If it leans to one side, the plenary share is enough.
With an odd number of people, the person at the fold has no partner. The facilitator asks that person to join the neighbouring pair.
Making the line speak
During the look around, nobody speaks. Each person sees where their colleagues, their manager and the other departments stand. For the share, the facilitator picks people at both ends, in the middle and in the isolated groups. The facilitator also asks a person who stands alone. That person often gives a reason that nobody has stated yet.
The facilitator asks "What brings you here?" and does not comment on where people stand. The Aspiration wiki adds a variant. During the share, the facilitator invites everyone to move when an argument convinces them. The facilitator then asks those who moved what convinced them.
The group can repeat the structure to go further. The debrief matters more as the statements grow more complex. The facilitator then protects the three minutes of the final debrief even when the session runs over.
Online
According to the page, online participants lose the physical movement and miss how the others react to the question. Online, the facilitator skips the fold.
| Element | In person | Online |
|---|---|---|
| Setup | A line on the floor in an open space | A horizontal line with named ends in a visual collaboration space |
| Respond to the statement | Each person goes to their place | Each person places a dot or a sticky note where they would stand |
| Look around | Each person observes where the others stand | Each person writes in the chat what they observe |
| Share | Aloud, with a microphone in a large group | Aloud or in the chat |
| Fold | Pairs, then groups of four | Skipped |
| Roles | The facilitator | The facilitator and a technical host |
What makes Folding Spectrogram fail
A statement that calls for yes or no empties the middle of the line. The group lines up in two blocks and the share repeats two arguments. The facilitator rewrites the statement with two named ends.
Ends that nobody has named leave each person to read the line their own way. Two people side by side can then mean opposite things. The facilitator names the ends aloud and displays them.
A participant often stands near their manager. The line then shows the hierarchy. The manager takes a place last or abstains on the statements that touch their area.
A group that reads the line as a vote believes it has decided. At the debrief, the facilitator reminds the group that the line shows positions. The decision comes later, with another structure or in the body that owns it.
Rounds that run too long tire a group that stays on its feet. It listens less to the following statements. The page prefers short rounds.
Folding Spectrogram in a string
Liberating Structures combine into strings. According to the page, the group works through the tensions and difficulties spotted on the line with Critical Uncertainties or Wicked Questions. These two structures examine risks and opportunities. If the original challenge appears in a new light, the group continues with Agreement-Certainty Matrix to understand the decisions ahead.
A large group that wants to hear two camps in depth can also continue with a Fishbowl. A few people from each end talk in the centre while the others listen.
Origin
According to the site, variations of the structure have been in use for many years. Nancy White and other Liberating Structures practitioners adapted it.
Aspiration's facilitation wiki describes a related exercise under the name spectrogram. Its line runs from "Strongly Agree" to "Strongly Disagree".
AI considerations
Before the session, a language model proposes statements from the topic of the workshop. The facilitator asks it for two named ends for each statement. The facilitator has it flag the statements that combine two statements or call for a yes or a no. The page advises starting with the easy statements. The model therefore ranks them from the easiest to the most ambiguous. The facilitator keeps those that touch the group's question.
The facilitator does not ask the model to predict where people will stand. A model that predicts that IT will stand on one side and the case officers on the other sorts people by their function. Each person chooses their place and the group discovers its distribution for itself.
After an online session, the whiteboard keeps the dots and the chat keeps the share. The model counts the dots per zone of the line. It groups the chat comments by position for the business analyst's summary. The analyst checks each line of the summary against the screenshot of the whiteboard.
The positions and the comments carry the participants' names. They are personal data within the meaning of art. 5 let. a of the Federal Act on Data Protection (FADP, SR 235.1). The analyst removes the names before passing the summary to an external AI service.
Examples
The analyst chooses the follow-up from the shape of each line. A cantonal AHV/AVS compensation office is preparing a portal where employers declare salaries. After an easy practice statement, sixteen people from contributions, IT and the legal department respond to three statements. The figure shows the line for each statement.
| Statement | Distribution | What the share brings out | Follow-up |
|---|---|---|---|
| The portal replaces the paper form. | Two camps of six people | The case officers think of the small employers who have no fiduciary. IT counts the cost of two channels. | Fold, then Wicked Questions: "How is it that we want to make the portal mandatory and at the same time accept paper from small employers?" |
| The portal rejects an incomplete declaration. | Nine people out of sixteen in the middle | The people in the middle propose a rejection after a first reminder. | Candidate requirement: the portal sends one reminder, then rejects. The analyst submits it to the project committee. |
| The office opens the portal before the January annual payroll declaration. | Spread out with no camp | Each person names a different uncertainty: data migration, employer training and the January workload. | Critical Uncertainties on the go-live date |
The group folded the line at the first statement only. At the third, people were spread out along the line, but each person doubted the date for a different reason. The group had no disagreement to understand. The analyst moved on to Critical Uncertainties.
Visualisations
One diagram shows the line before and after the fold. A second links the steps and the loop of statements with their timings. A third shows the line for each statement of the example. Tables present the statements, the online version and the follow-ups.
Cost
| Phase | Level | Justification |
|---|---|---|
| Preparation | Low | Write four to six statements, name their ends and test them. Clear a space for a long line. |
| Execution | Medium | The page gives about 15 to 20 minutes. Its steps add up to 38 to 64 minutes for four to six statements. At least ten people spend that time on it. |
| Documentation | Low | One photo of the line per statement and the notes from the share. Online, a screenshot of the whiteboard and the chat. |
Tooling
In person, adhesive tape marks the line on the floor. Two posters carry the ends. A third carries the current statement. A large group needs a microphone. The facilitator keeps the rounds short with a timer. A mobile phone photographs the line at each statement. The facilitator announces the photo and takes it from behind the participants. The facilitator can also record only the number of people per zone.
Remotely, the facilitator draws one horizontal line per statement on an online whiteboard (Miro, Mural). The participants place their dots on it. They share aloud or in the chat of the video call (Zoom, Microsoft Teams).
An anonymous scale poll (Mentimeter, Microsoft Forms) shows the distribution. It suits a group where the hierarchy weighs on where people stand. The share then loses its anchor: nobody knows who stands where.
Sources
The Liberating Structures site publishes the structure under a Creative Commons BY-SA 4.0 licence.
- Folding Spectrogram, Liberating Structures: the structure with its purposes, its invitation, its design elements, its steps and their timings, the fold, the online version, its tips, its uses, its strings and its attribution.
- Facilitation:Spectrogram, Aspiration Facilitation Wiki: the facilitators' spectrogram, its opinion line and the question put to each person about their place.
- Federal Act on Data Protection (FADP), SR 235.1, art. 5 let. a: the definition of personal data, which named positions contain.

