The Eight Wastes
The eight wastes are categories for spotting the work in a process that adds cost without adding value. Japanese calls this work muda. Taiichi Ohno developed the Toyota Production System. In it he distinguishes seven wastes: overproduction, waiting, transport, overprocessing, inventory, unnecessary movement and defects. In The Toyota Way (2004), Jeffrey Liker adds an eighth waste: underused skills. The team observes the work on site and files each finding under a category. From this it builds a quantified waste log, which shows where to act first.
Goal
The eight wastes form an observation checklist. Each category names a form of work that the customer does not pay for: producing too early, waiting, moving things, redoing. The team that observes a process checks each category in turn.
Without a checklist, a team sees the wastes it already knows. It misses the everyday ones: the pile of files that everyone walks around. Ohno writes: "The preliminary step toward application of the Toyota production system is to identify wastes completely."
The checklist prepares a decision: which wastes to tackle and in what order. The deliverable is the waste log. For each finding it gives the step, what was seen, the category, a measure, the type (1 or 2) and a first hypothesis about the cause.
Usage
When to use it
- Lead time or cost drifting with no visible cause: log on site what consumes the time between steps.
- During a gemba walk: tell the manager and the team what to look for at each step.
- With value stream mapping: name the wastes between the steps of the current-state map.
- Before a kaizen event: choose the waste that the team will tackle.
- Office or service process: log the files that wait, the handoffs between departments and the data entered twice.
- A team willing to show what does not work: the observer logs only what people let the observer see.
When not to use it
- Known waste with an unknown cause: look for the cause with a fishbone diagram or the five whys.
Description
What Ohno calls waste
Ohno defines waste by cost: "In production, 'waste' refers to all elements of production that only increase cost without adding value." His examples are excess people, inventory and equipment. The Lean Enterprise Institute (LEI) extends the definition beyond the factory: any activity that consumes resources without creating value for the customer.
Ohno counts as work only the work that is needed. The rest is waste. From this he draws an equation that holds for one worker and for a whole line alike:
Present capacity = work + waste
His example: a line of 10 workers makes 100 pieces a day. Ohno observes overproduction, workers waiting and unnecessary movement depending on the time of day. After improvement, 8 workers make the 100 pieces. The 10 workers could therefore make 125. Ohno notes that this capacity already existed and that waste absorbed it. He does not turn it into 125 pieces: that would be overproduction. The line makes the 100 pieces in demand with 8 workers. Management redeploys the other two.
The equation separates activity from work. Ohno says so in his glossary: "Regardless of how much workers move, it does not mean work has been done." In an office, a person who goes from one department to another looks productive. The log counts every trip that does not move the file forward.
The categories
| Waste | Ohno's terms (English edition) | On the shop floor | In the office |
|---|---|---|---|
| Overproduction | waste of overproduction | Parts made before they are ordered | Report that nobody reads; copies printed "just in case" |
| Waiting | waste of time on hand (waiting) | Operator watching an automatic machine; part waiting for the next station | File waiting for a signature; employee waiting for an answer |
| Transport | waste in transportation | Work in process taken to the store, then brought back to the line | File passed from one department to another; data exported from one system and imported into another |
| Overprocessing | waste of processing itself | Machining finer than the required tolerance | Second approval that the internal rules do not require; data entered twice |
| Inventory | waste of stock on hand (inventory) | Material, work in process and finished goods beyond need | Pile of files to process; requests stuck in the ticketing tool |
| Unnecessary movement | waste of movement | Bending, looking for a tool, walking to the bin | Looking for a document; fetching a binder from the end of the corridor |
| Defects | waste of making defective products | Scrap, rework, sorting | Data entry error; incomplete file sent back; rejected payment |
| Underused skills | Not in Ohno's list (Liker, 2004) | Operator whose improvement idea nobody asks for | Specialist assigned to data entry; suggestion left unanswered |
Transport and unnecessary movement differ in what moves. In transport, the object of the work moves: the part, the file, the data. In unnecessary movement, the person moves or makes a gesture that does not advance the work.
Ohno writes for production. Liker writes that the seven categories also apply to product development, order taking and the office. In the office, the team finds inventory in the queue and transport in the handoff between departments or between systems.
Overproduction hides the other wastes
Producing more than demand or ahead of demand creates inventory that nobody asked for. Ohno describes the mechanism. A worker with nothing to do works ahead on the next job instead of waiting. The waiting disappears from view. Inventory builds up between two stations and has to be moved, then stacked. "If these movements are regarded as 'work,' soon we will be unable to tell waste from work."
Ohno calls this waste of overproduction "our worst enemy" because "it helps hide other wastes." In the office, the same mechanism produces the report prepared before anyone asks for it or the batch of files processed ahead to fill the afternoon.
Inventory generates other wastes
Overproduction creates inventory. In another passage, Ohno describes what that inventory produces in turn. He distinguishes primary waste from secondary waste. He writes: "The greatest waste of all is excess inventory." Then he follows the chain. Too much inventory requires a warehouse and people to carry the goods there. Someone must also protect the goods from rust, repair those that get damaged and count the stock. Finally comes a computer to manage the inventory. "The vicious cycle of waste generating waste hides everywhere in production."
In the office, a queue of 200 requests brings a tracking sheet, a prioritisation meeting and reminders from customers.
The eighth waste: underused skills
Ohno's list has seven categories. So does Toyota's. In The Toyota Way, Liker presents the seven wastes that Toyota identified, then writes: "There is an eighth waste, which I have included." He names it unused employee creativity. He defines it as the loss of time, ideas, skills, improvements and learning opportunities when the organisation does not involve its employees or does not listen to them.
The LEI writes that the eighth category came later as lean spread. The category also goes by the names "non-utilized talent" and "underutilized people".
Ohno's nearest passage is about redeploying people. Union members suspected his system of being a means of laying off workers. Ohno replies: "But that is not the idea." Management must identify excess manpower and put it to effective use. "Eliminating wasteful and meaningless jobs enhances the value of work for workers."
Logging waste on site
Lean practice calls the walk on which people observe waste a waste walk. Our sequence draws on lean practice and on the walk that Kathy Ballou-Nelson describes for healthcare settings.
- Choose a process and its scope. The team names what the process delivers to the customer, for example "a supplier invoice paid on its due date". The scope says where the observation begins and where it ends.
- Prepare the log sheet. The sheet gives the eight categories with a one-line definition each. Its columns: the step, what is seen, the category, the measure, the type and the presumed cause.
- Form a small mixed team. Three or four people from different departments are enough. One of them does the work under observation. An outside eye sees what habit hides from the people in the department.
- Observe the real work. The team goes where the work is done. It watches what happens rather than the written procedure. It notes where, how often and how long. In an automated flow, the system logs replace observation for waits and queues. The team files what they show under the same categories.
- File each finding under a category. A finding that fits two categories gets both. The team moves on to the next finding without debate: the choice between two categories does not change the action.
- Separate the two types. According to the LEI, type 1 creates no value but cannot be avoided with current technology and equipment; the LEI cites weld inspection. Type 2 can be removed at once. The log keeps both. Prioritisation handles type 2 first.
- Ask the people at the workstation why. The team looks for a cause in the process, never for a culprit.
- Sort by size and by ease. The team keeps the findings that cost the most and are the easiest to remove. For the findings at the top of the list, it looks for the root cause with a fishbone diagram or the five whys.
- Give each action an owner and a due date. The team repeats the walk after the due date and compares the measures.
The limit: mura and muri
Ohno names two concepts beside waste: mura (unevenness) and muri (overburden). Insufficient standardisation produces all three. Each ends in defective products. The eight wastes cover only muda. James Womack argues that in many organisations uneven workload and overburden are the root causes of muda. A team that removes a wait without levelling a workload that varies threefold will see the wait return at the next peak. The log says where time is lost; it does not always say why.
Pitfalls
Logging without measuring. The team can neither sort nor check progress on "Lots of waiting at sign-off". It can on "3 working days median before the budget holder's sign-off".
Looking for a culprit. A log that names people teaches the team to hide its waste. If management presents the exercise as a headcount reduction, the team shows a staged process. Ohno takes workers off a line to redeploy them. He rejects layoffs.
Removing inventory without touching what produces it. A pile cleared in a week of overtime builds up again if the upstream step still produces ahead.
Ignoring the eighth category. A team that leaves out underused skills does not log the ideas that the people at the workstation have already put forward.
Boundaries with neighbouring techniques
The gemba walk takes the manager to the place where the work is done. The eight wastes tell the manager what to look for at each step.
Value stream mapping draws the flow from end to end and measures the wait times between steps. The waste log names what fills those wait times.
The spaghetti diagram traces the path of people and objects on a floor plan. It measures two of the eight wastes: transport and unnecessary movement.
The fishbone diagram and the five whys start from an identified waste and look for its cause. A kaizen event then tackles the chosen waste.
AI considerations
Before the walk, an assistant prepares the log sheet. From a description of the process, it drafts the one-line definition of each category and an office example drawn from that process. Its examples can stay generic and describe situations that the team has not seen. The team keeps only what it then observes on site.
After the walk, an assistant files the notes under the categories. It transcribes the voice notes, proposes a category for each finding and flags those that fit two. The team confirms each classification. It checks that each measure comes from its notes: an assistant that completes an unfinished note invents a figure.
From one walk to the next, the assistant compares the logs and flags the wastes that recur without action.
The notes describe the work of employees. The team puts no names in them. It sends nothing to an AI service that the employer has not approved.
Examples
This waste log follows a supplier invoice in an SME in the canton of Vaud, from receipt to payment. The team observed 70 invoices over one week.
| Step | What is seen | Waste | Measure | Type | Presumed cause |
|---|---|---|---|---|---|
| 1. Receipt | The warehouse in Crissier signs the paper invoices, then sends them by internal mail to accounting in Renens | Transport | 1 working day in transit | 1 | The plant has no access to the ERP: the storekeeper confirms receipt on the paper invoice |
| 2. Data entry | Each invoice printed in three copies: accounting, purchasing, requester | Overproduction | 3 copies per invoice; purchasing and the requesters say they do not read them | 2 | Habit from before the ERP |
| 2. Data entry | Invoices entered every Thursday | Inventory | 52 invoices in the pile on Wednesday evening | 2 | Batch entry to "save time" |
| 3. Matching | The accountant fetches the purchase order from the purchasing binder | Unnecessary movement | 11 round trips in one morning | 2 | Purchase orders filed on paper only |
| 3. Matching | The accountant proposed reading the QR-bills with a scanner instead of retyping the IBAN | Underused skills (Liker, 2004) | Proposal made 6 months ago and still unanswered | 2 | No channel for staff ideas |
| 4. Sign-off | Two sign-offs on every invoice | Overprocessing | 58 of 70 invoices below the CHF 5'000 threshold set by the internal rules | 2 | Threshold in the rules not well known |
| 4. Sign-off | Invoices waiting for the budget holder's sign-off | Waiting | 3 working days median; 5 at most | 2 | The budget holder signs off on paper every Friday |
| 5. Payment | Payments rejected by the bank | Defects | 3 rejections out of 70 payments | 2 | IBAN retyped by hand from the QR-bill |
Each row carries a measure and none carries a name. The transport row is type 1: as long as the plant has no access to the ERP, the storekeeper confirms receipt on the paper invoice. The log keeps this row. The accountant's proposal would remove the defect in the last row.
Visualisations
The hidden-capacity diagram takes up Ohno's example: waste absorbs 25 of the 125 pieces that the 10 workers could make. The diagram of the eight categories separates Ohno's seven wastes from the eighth, which Liker added. It shows what overproduction hides and what inventory generates. The categories table gives a shop-floor example and an office example for each category. The waste log shows the deliverable.
Cost
| Dimension | Level | Rationale |
|---|---|---|
| Preparation | Low | Choice of the process and its scope, a one-page log sheet, a team of three or four people. |
| Execution | Medium | Depending on the cycle length, half a day to a few days of observation on site; measuring waits means following several files. |
| Documentation | Low | A log of one or two pages and an action list tracked up to the next walk. |
Tooling
A printed log sheet and a pencil are enough. A stopwatch measures a wait or a cycle time. The team traces movements on a floor plan when transport or unnecessary movement dominates.
In a spreadsheet, the team sorts the findings by category, by size and by type. For a digital process, a process mining tool measures waits and queues from the system logs. It tells the team where files wait longest. It does not see the movements, the printed copies or the suggestion left in a drawer. The team tracks the actions on a board near the workstations or in its task tool.
Sources
The first seven wastes come from the Toyota Production System; the eighth comes from Western lean practice.
- Ohno, Taiichi (1988), Toyota Production System: Beyond Large-Scale Production, Productivity Press; original Japanese edition, Diamond, 1978: the definition of waste, the capacity equation, the 125-piece example, the list of the seven wastes, overproduction as the waste that hides the others, the secondary waste that arises from excess inventory, the reply to the unions, the insufficient standardisation that produces mura and muri and the difference between moving and working. The quotations are from the English edition.
- Liker, Jeffrey K. (2004), The Toyota Way, McGraw-Hill, chapter 3: the seven categories applied to the office and the eighth waste, which Liker presents as his addition.
- Toyota Motor Corporation, Toyota Production System: the complete elimination of waste.
- Lean Enterprise Institute, Waste (Muda), Lean Lexicon: the definition of waste in relation to the customer and the two types of muda.
- Lean Enterprise Institute, 7 Wastes, Lean Lexicon: the definition of the seven wastes.
- Womack, James P., Mura, Muri, Muda?, Lean Enterprise Institute: uneven workload and overburden as root causes of muda.
- Lean Enterprise Institute, The Eight Wastes of Lean: Ohno's seven wastes and the later appearance of the eighth.
- Ballou-Nelson, Kathy (2025), Conducting a Waste Walk, University of Colorado Anschutz Medical Campus: the steps of a waste walk in a healthcare setting.