Drawing Together
Drawing Together is a meeting structure in which each participant tells the story of a challenge in a drawing with no words. They have only five symbols: the circle, the rectangle, the triangle, the spiral and the star person. Each person draws two drafts of their story alone. Another participant then interprets the drawing while its author stays silent. Henri Lipmanowicz and Keith McCandless designed it and describe it in The Surprising Power of Liberating Structures (2013). The book times it at 40 minutes. The authors' site states about 50.
Goal
Drawing Together lets a group say through drawing what its members find hard to put into words: feelings, attitudes and patterns.
According to Lipmanowicz and McCandless, drawing gives access to this hidden knowledge. It helps a tired group that has reached the limits of logical thinking. The book sees it as a counterweight to a culture that relies too much on what people say and write. According to the authors, the playful tone of drawing signals to the group that new answers are expected.
According to the Field Guide (part four of the book), the structure also draws on a group's explicit, tacit and latent knowledge. It helps the group understand a vision or a complex situation together and brings its members closer. The site links it to the Liberating Structures principle "Emphasize Possibilities: Believe Before You See".
The structure produces one drawing per participant and the readings that the others make of it. The book advises photographing or filming the participants while they draw. Both sources advise returning to the drawings when the group meets again.
In our view, the business analyst turns to it when a project stalls on what stakeholders leave unsaid: the fear of a change, the weight of a legacy system or the tension between two departments. The drawings raise these subjects. An interview or a workshop then deals with them. You will find the other structures under Liberating Structures.
Usage
When to use it
- Long meeting short of ideas: drawing changes the pace and gets ideas flowing again.
- Opposing views that block the group: drawing moves the exchange away from arguments and eases the tension.
- Complex project with relationships that are hard to see: drawing brings out links that nobody has named.
- Vision to make concrete: a vision statement takes shape. The book has visual people in mind in particular.
- Participants who say little in meetings: the book sees drawing as a channel for ideas that would not come out otherwise.
- Visual facilitation of a meeting or a conference: one person draws the conversation as it unfolds.
- Individual work: a participant makes their tacit way of approaching a problem visible.
- Opening a string that leads to action: the book follows the drawing with 1-2-4-All, 15% Solutions and then Troika Consulting.
- Distributed team: the site provides for a paper drawing shown to the camera or a shared whiteboard.
When not to use it
- Precise requirements to gather: five symbols carry no business rule, no data and no acceptance criterion. In our view, an interview or a requirements workshop gathers them.
- Session with no time to make room for an emotion: the book warns that drawing can touch people deeply. In our view, a verbal structure such as 1-2-4-All exposes participants less.
Description
The invitation
The book invites each participant to tell the story of a personal challenge or of one the whole group shares. They use the five symbols and no words. The site opens with a question: who needs words when they have symbols? It then invites participants to tell the story of a transition or a challenge they are going through.
The five symbols
The book gives one word per symbol. The site expands each meaning into a short phrase.
Both sources give the star person an equivalent: the equal-armed cross. The site's symbols handout draws the star person as a five-pointed star with a head, two arms and two legs. According to the book, these five easy-to-draw symbols have a universal meaning.
The book credits David Sibbet (The Grove) and Angeles Arrien as the inspiration for the structure. It refers to Arrien's book Signs of Life. The site cites only Arrien. It presents her as a cultural anthropologist and refers to the same book for further reading.
The room and the materials
Each person draws on paper with markers. Provide flipcharts or an open wall lined with paper. Water-based markers and soft pastels add colour. Provide a chair and a table per participant. Hand out a sheet that shows the five symbols.
The site names the roles: the facilitator, the artists and the viewers. Each participant is artist and viewer in turn. The site sets the minimum at two participants. The book has everyone draw at the same time.
The steps
- Invitation: the facilitator reads the invitation (site only).
- Introducing the symbols: the facilitator draws the five symbols one by one and states the meaning of each.
- Practice: each person practises drawing the five symbols.
- First draft: each person combines the symbols alone into a story without a single word. The book speaks of the "journey" of someone working on a challenge or an innovation.
- Second draft: each person reworks their story. They play with the size, placement and colour of the symbols to make it more telling.
- Interpretation: another participant interprets the drawing aloud. The artist stays silent.
- Change of partners: participants change partners twice and repeat the reading (site only).
- Plenary: the whole group looks for what the drawings show.
The book gives the reading to another person or to a group of one to four people. The site forms pairs. After the two readings, each partner says what they meant their drawing to convey. With two changes of partner, each artist meets three viewers.
Timings: the authors' site
For the plenary, the book puts the question "Together, what do the drawings reveal?" to the group. It recommends 1-2-4-All when the group is large. The site asks a few participants to show their drawing. The group then looks for common themes.
Timing by source
| Step | The book's Field Guide | The authors' site |
|---|---|---|
| Stated duration | 40 min | About 50 min |
| Invitation | No step | 1 min |
| Introducing the symbols | 5 min | 5 min |
| Practice | 5 min | 3 min |
| First draft | 10 min | 10 min |
| Second draft | 10 min | 10 min |
| Interpretation | 5 min by one person or a group of one to four people | 5 min in pairs |
| Change of partners | No step | Two readings of 5 min |
| Plenary | 5 min | 5 min |
| Steps total | 40 min | 49 min |
Reading a drawing
Both sources give the viewer the meaning of the five symbols and keep the artist silent.
In our view, the viewer first names what is drawn: which symbols, what size, where they sit, what is inside the circle and what stays outside. They then tell the story that the drawing suggests to them. They ask no questions and wait for the artist's turn. A symbol that is enlarged, isolated or placed outside the circle says something the artist may not have put into words. The gap between the reading and the intention shows what the artist drew without saying it.
Running the session
The book asks the facilitator to remind participants that only the story counts. Participants do not need drawing skills. A childlike drawing looks playful and captures the imagination of others. The book also asks the facilitator not to coach participants too much on drawing better. The site asks the facilitator to discourage perfectionism.
In our view, a project invitation names the subject and lets each person choose their challenge: "Use the five symbols to tell the story of a challenge you face in the migration of the member administration software." An invitation that already names the challenge ("the delays in migration testing") dictates the story.
The book advises drawing or showing a sample story to help the group get started. The drawings often hold surprises. The facilitator helps participants accept what comes out of them. The site specifies that this applies to emotions too.
Online, the site offers two options. Participants draw on paper with a thick marker and show their drawing to the camera. They turn off background effects that would blur the drawing. The other option is a shared whiteboard with the five shapes already in place. According to the site, it works poorly on small screens. Where possible, the facilitator draws the symbols in front of the camera.
In our view, the analyst goes back over the readings after the plenary. Each reading that names a dependency, a fear or a conflict becomes an interview question or an entry in the risk register.
What makes Drawing Together fail
An artist who comments on their drawing during the reading replaces the interpretation with their own explanation. Both the book and the site require the artist to stay silent.
Participants who write words next to the symbols pull the exercise back into the verbal register it was meant to leave. Both sources allow words in one variation only: the person who draws a meeting in progress may add words. The book's condition is "if you must".
The book warns that drawing can have a strong therapeutic effect. It asks the facilitator to be prepared for emotional reactions. In our view, the facilitator leaves time open after the reading so that a person who has been moved can say so or step away.
The book reserves size, placement and colour for the second draft. In our view, a group that skips it loses the material for the reading.
Variations
Both sources suggest that one person draws the conversation of a meeting with the symbols. The site also suggests displaying all the drawings as a gallery to show at a glance what each person is going through.
The book adds other variations. A group can start small on a single A4 sheet (the book names the US letter format). Participants can draw on tablets. The Hero's Journey can give the stories their template. So can a progression: from the status quo to the call to novelty, then to discovery, validation, early adoption and spread.
Drawing Together in strings
Chapter 6 of the book opens a string with Drawing Together. The drawing creates shared images of a common problem. With 1-2-4-All, the group interprets the drawings and sorts the solutions and first steps that emerge. Each person then names what they can do right away: their 15% Solution. In Troika Consulting, their peers help them expand it. Allow an hour to an hour and a half for a string of this kind.
The same chapter places Drawing Together between Purpose-To-Practice and Integrated~Autonomy. There the drawing sparks ideas for working in an integrated and autonomous way across distant sites. The site suggests stringing the structure together with Future~Present, Spiral Journal and Nine Whys to deepen self-discovery.
AI considerations
The sources say nothing about AI. In our view, it helps prepare the session and keep a record of it. It has no place during the drawing or the reading.
A language model helps the facilitator adapt the invitation to the project. The facilitator gives it the context and asks it for several wordings. They keep the one that names the subject without naming the challenge.
An image generator would replace the participant's hand with ready-made images. The structure rests on a drawing that participants make themselves in a few minutes. A multimodal model that interprets a photographed drawing produces a plausible reading from the meaning of the five symbols. Yet it knows nothing of the project, the people or what the artist left unsaid. The structure still works on a colleague's reading.
After the session, the facilitator can ask a model to list the symbols and placements that recur across the photographed drawings. The group takes up this list at the next session and corrects it. A photo or a video that shows the participants contains personal data within the meaning of the Federal Act on Data Protection (FADP, Art. 5 let. a). The facilitator asks for the participants' consent before filming. They crop the photos to the drawings and remove names before handing them to an external AI service.
Examples
The deliverable is a drawing and its reading. In this constructed case, a business analyst at a pension fund tells the story of the migration of the member administration software. Her second draft enlarges, isolates and moves the symbols of the first.
| Element of the second draft | First viewer's reading | Artist's intention |
|---|---|---|
| Large rectangle on the left under three star persons | "The old system carries the whole team." | The calculation rules of the old software, which only three colleagues know. |
| Circle around the rectangle and the three star persons | "The team forms a closed whole." | The team that maintains the old software. |
| Tight spiral that fills the central half of the sheet | "Change takes up all the space and goes round in circles." | The migration tests restarted with every release. |
| Small triangle at the top right | "The goal is small and far away." | The go-live date set by the board of trustees. |
| Small star person alone outside the circle between the spiral and the triangle | "Someone outside the team leads the migration to the goal alone." | Herself. |
The analyst had placed herself outside the circle because she does not belong to the team. Her viewer read the star person outside the circle as someone who leads the migration alone. She had told nobody this. The exchange that follows the reading starts from this last element.
After the session, the analyst records in the risk register the dependency on the three colleagues who know the calculation rules. The lone star person gives her the first question for a follow-up interview.
Visualisations
One diagram presents the five symbols and their meaning according to both sources. A second shows the interpretation and the changes of partner. A third shows the two drafts of the constructed case. The timing of the two sources and the reading of the drawing fit in rows and columns.
Cost
| Phase | Level | Justification |
|---|---|---|
| Preparation | Low | Paper and markers for each person, a sheet of the five symbols, a wall or tables. |
| Execution | Medium | The book counts 40 minutes. The site states about 50. The facilitator must be able to handle an emotional reaction. |
| Documentation | Low | Photograph the drawings. |
Tooling
In the room, paper, markers and a mobile phone to photograph the drawings are enough.
Remotely, Zoom or Microsoft Teams split participants into pairs in breakout rooms. With a paper drawing shown to the camera, the exchange stays between the two partners. A collaborative whiteboard (Miro, Mural) suits a gallery that must gather all the drawings in one place. Tablets suit a group that wants to keep the drawings to compare them later.
Sources
The book is published under a Creative Commons BY-NC-SA 3.0 licence. The structure's page on the site is published under a BY-SA 4.0 licence.
- Henri Lipmanowicz, Keith McCandless, The Surprising Power of Liberating Structures: Simple Rules to Unleash a Culture of Innovation, 2013, ISBN 978-0-615-89337-2: the description of Drawing Together with its invitation, its symbols, its steps, its purposes, its tips, its variations, its uses and its inspirations (Field Guide, part four); the strings (chapter 6).
- Drawing Together, Liberating Structures: the site's version with its invitation, the expanded meaning of the symbols, its roles, its durations, the changes of partner, online facilitation, the gallery and the suggested string.

