Your Training Partner
Techniques Toolbox
DMAIC or DMADV. A question asks whether the process exists and whether fixing the causes can reach the target. Yes leads to the DMAIC row. No leads to the DMADV row. A shared band joins Define, Measure and Analyse in both rows. DMAIC continues with Improve and Control. DMADV continues with Design and Verify. From Verify, one arrow returns to Design when a CTQ misses its target. A second arrow returns to Analyse when the concept fails.

DMADV

DMADV is the Six Sigma approach that designs a new product, service or process. The acronym lists its five phases: Define, Measure, Analyse, Design, Verify. It belongs to Design for Six Sigma (DFSS). DMAIC improves a process that exists. DMADV starts from customer needs when no process exists or when improvement can no longer meet the requirements. Measure translates these needs into quantified targets. Verify checks the design against these targets before it goes into service.

Goal

The glossary of the American Society for Quality (ASQ) defines DMADV as a five-phase Six Sigma design method. The ASQ is the American professional body for quality. The method applies when existing processes cannot be improved enough to meet customer requirements and a new design becomes necessary.

The approach settles one question: which design meets the quantified targets drawn from customer needs before it goes into service? It protects the project against choosing a solution in advance. The team generates the concepts in Analyse and details the design only in Design.

The project delivers a verified design and its documentation: the charter, the needs translated into targets, the chosen concept and the rejected ones, the detailed design, the verification table and the control plan that the process owner takes over.

DMADV is one of the DFSS roadmaps. The ASQ Green Belt body of knowledge also cites IDOV (Identify, Design, Optimize, Verify). The Black Belt body of knowledge cites DMADOV, which inserts an Optimize phase before the last one. The draft standard ISO/DIS 8023 describes Design for Six Sigma as an approach to innovate, to redesign existing processes, products and services or to develop new ones.

Usage

When to use it

  • New product, service or process: no process provides a baseline. The design starts from customer needs.
  • Improvement at its limit: a DMAIC has removed the causes. The gap to the customer requirement remains.
  • Process to redesign from scratch: a change of channel, regulation or technology makes the current architecture obsolete.
  • Defect that is costly once in service: the defect reaches customers and forces rework.
  • Customers reachable before design: interviews, surveys and observation provide the needs that Measure translates into targets.
  • Development project with milestones: the phase reviews align with the milestones of the schedule.
  • Cross-functional team available: operations, IT, legal and finance design together from Define onwards.

When not to use it

  • Existing process that fixing the causes can bring to target: use DMAIC.
  • Need still unknown: no target can be set. Explore first through prototyping.
  • Small change to try out: five phases cost more than the gain. Test the change with one turn of the PDCA cycle.

Description

The ASQ Green Belt and Black Belt bodies of knowledge name the five phases.

Choosing between DMAIC and DMADV

The ASQ glossary provides the criterion. A process you do not have yet cannot be improved.

Questions asked in order make this criterion operational.

  1. Does the process exist? No: DMADV.
  2. Does it produce data on the characteristic the customer judges? No: the DMAIC Measure phase can collect them. The process remains a candidate for DMAIC.
  3. Can fixing the causes reach the target? Yes: DMAIC. No, because the design limits performance: DMADV.

The third question is sometimes settled during a DMAIC. A processing time set by three successive approvals cannot fall below the sum of their lead times, whatever causes the delays. The Analyse review then stops the DMAIC and opens a DMADV with the Measure baseline as its reference.

DMAIC or DMADVOne question chooses the roadmap
DMAIC or DMADVDMAIC or DMADV. A question asks whether the process exists and whether fixing the causes can reach the target. Yes leads to the DMAIC row. No leads to the DMADV row. A shared band joins Define, Measure and Analyse in both rows. DMAIC continues with Improve and Control. DMADV continues with Design and Verify. From Verify, one arrow returns to Design when a CTQ misses its target. A second arrow returns to Analyse when the concept fails.Shared namesDoes the process existand can fixing thecauses reach the target?YesNoDMAICDMADVDefineMeasureAnalyseImproveControlDefineMeasureAnalyseDesignVerifyCTQ off targetconcept fails

Does the process exist and can fixing the causes reach the target?

  • Yes: DMAIC
    1. Define
    2. Measure
    3. Analyse
    4. Improve
    5. Control
  • No: DMADV
    1. Define
    2. Measure
    3. Analyse
    4. Design
    5. Verify
  • Shared names: Define, Measure, Analyse
  • Verify → Design: CTQ off target
  • Verify → Analyse: concept fails
The two roadmaps share the names of their first three phases. An off-target CTQ sends the project back from Verify to Design. A failed concept sends it back to Analyse.
PhaseIn DMAICIn DMADV
DefineA quantified gap on an existing processA need, a scope and the reason why improvement is not enough
MeasureThe baseline of the current processCustomer needs translated into CTQs, with target, limits and measurement method
AnalyseCauses verified by dataConcepts compared on the CTQs, one concept chosen
4th phaseImprove: change the process and steer the changeDesign: set every element of the design
5th phaseControl: hold the gainVerify: prove that the design meets its targets, then hand it over
The first three phases carry the same names in both approaches. What they work on differs.

Define: state the need and the scope

The team writes the project charter. It names the product or process to design, the target customers, the scope, the business objective, the team and the schedule. The sponsor signs it.

A DMADV charter also names the reason that rules out improvement: the absence of a process or the design limit that a DMAIC ran into. Without this line, the Define review cannot check the choice of approach.

From Define onwards, the team brings in the functions that will operate the design. The draft standard ISO/DIS 8023 describes how cross-functional teams implement DFSS. A design that operations discover only in Verify goes back to Design.

Measure: translate the needs into targets

No process provides a baseline. Measure therefore measures the needs. The team collects the voice of the customer through interviews, surveys, focus groups and observation. It translates each need into a critical-to-quality characteristic (CTQ). A CTQ is a measurable quantity with a target and specification limits.

The ASQ Green Belt body of knowledge cites QFD, the CTQ tree and the Kano model among the tools that translate customer requirements into product characteristics or performance measures. Quality function deployment (QFD) relates the needs to the technical characteristics in a matrix and weights the latter.

For each CTQ, the team sets how Verify will measure it: the definition, the population and the collection method. This method must be reliable. The ASQ Green Belt body of knowledge places measurement system analysis (MSA) in its Measure section. For an abandonment rate, the team defines what counts as a started form and which system counts it. Benchmarking against a comparable organisation anchors the target in a performance that someone already achieves.

Analyse: compare concepts

In a DMADV, the team generates several concepts in Analyse. A concept describes the solution in broad strokes: the steps, the share of the work given to the system and the channel through which the customer enters. The team evaluates at least two of them on the weighted CTQs with a decision matrix. TRIZ helps resolve a contradiction between two CTQs, when improving one degrades the other.

For each concept, the team estimates the expected performance on each CTQ by analogy with a similar process, by calculation or by simulation. A first design FMEA flags the failures inherent in the concept. Both ASQ bodies of knowledge distinguish the design FMEA, which looks for how the concept can miss a CTQ, from the process FMEA, which looks for how the execution of the designed process can fail.

The Analyse review chooses one concept and records why it rejects the others. A team that reaches Analyse with a single concept has chosen before comparing.

Design: set every element

To detail the design, the team names the elements that produce each CTQ and the value each element must take. In a service process, these are the steps, the decision rules, the fields of a form, the internal lead times and the staffing levels.

From needs to design elementsOnline application for a supplementary insurance policy
From needs to design elementsCTQ tree on three levels from top to bottom: customer need, CTQ and design element. The phase band on the left groups the two upper levels under Measure and the lower level under Design. The need "Know quickly whether I am covered" leads to the CTQ "90% of applications decided within two working days". Two elements follow from it: "Automatic acceptance when the questionnaire declares no medical history" and "Review by the medical service for the other applications". The need "Apply in one go" leads to two CTQs. The CTQ "At least 90% of applications complete on first submission" leads to the element "Mandatory fields and consistency check before submission". The CTQ "At most 25% abandonment among started forms" leads to the element "Health questionnaire: number of questions".MeasureDesignCustomer needCTQDesign elementKnow quickly whetherI am coveredApply in one go90% of applications decided withintwo working daysAt least 90% ofapplications completeon first submissionAt most 25%abandonment amongstarted formsAutomatic acceptancewhen thequestionnairedeclares no medicalhistoryReview by the medicalservice for the otherapplicationsMandatory fields andconsistency checkbefore submissionHealth questionnaire:number of questions

Measure: Customer need and CTQ. Design: Design element.

  • Customer need: Know quickly whether I am covered
    • CTQ: 90% of applications decided within two working days
      • Design element: Automatic acceptance when the questionnaire declares no medical history
      • Design element: Review by the medical service for the other applications
  • Customer need: Apply in one go
    • CTQ: At least 90% of applications complete on first submission
      • Design element: Mandatory fields and consistency check before submission
    • CTQ: At most 25% abandonment among started forms
      • Design element: Health questionnaire: number of questions
Each design element traces back to a CTQ. Each CTQ traces back to a customer need.

When several parameters act together on a CTQ, a design of experiments measures the effect of each one and of their combinations in a limited number of runs. The ASQ Black Belt body of knowledge places robust design, tolerancing and statistical tolerancing within DFSS. A robust design keeps its CTQs within their limits despite what it does not control: the quality of incoming data, the workload and the experience of staff. Tolerancing sets the allowed deviation on each parameter so that the CTQ stays within its limits. Statistical tolerancing combines these deviations according to their distributions rather than by summing the worst cases.

The same body of knowledge cites design for X (DFX), which groups the cost, manufacturing, test and maintenance constraints that the design respects. The team treats them as requirements on a par with the CTQs.

A prototype tests the design before Verify: a form mock-up tried with a few customers or a simulation of queues at peak hours. A process FMEA then examines how the designed process can fail. Finally, the team prepares the control plan for the future process. For each CTQ and each critical parameter, the plan sets the measurement, its frequency, the limit and the planned reaction.

Aligula, Kok and Sim describe a product development project run on DMADV at an optoelectronics firm in Malaysia. In that project, a CAD simulation identifies the CTQ parameters. An FMEA predicts the defects. A design of experiments tunes the parameters in Minitab. A quality control strategy holds the result.

Verify: prove that the targets are met

According to the ASQ Green Belt body of knowledge, verification and validation compare the results with the stated objectives. Verification checks that the design meets its specifications. Validation checks that it meets the customers' need in real use. The Green Belt body of knowledge expands the V as "verify". The Black Belt body of knowledge writes it as "validate".

The team runs a pilot on a customer segment, a region or a small batch for a fixed period. It measures each CTQ there with the definition and the method set in Measure. The verification table carries the target, the result and the verdict for each CTQ.

Capability compares the spread of a CTQ with its specification limits. For a CTQ expressed as a proportion, the rate measured in the pilot and its confidence interval play that role. The team sizes the pilot so that this interval stays on the right side of the target. A result whose interval crosses the target gets no verdict.

An off-target CTQ sends the project back to Design when the concept holds and a parameter must change. When no setting reaches the target, the concept fails and the project returns to Analyse.

At the end of the phase, the team puts the design into service and hands it over to the process owner. The owner takes over the control plan prepared in Design. The process then becomes an existing process: any later gap falls under DMAIC.

Phase reviews

A review closes each phase as in DMAIC. The sponsor, the project lead and the future process owner examine the deliverable against the exit criteria. The review decides to move on, to complete the phase or to stop the project. The reviews align with the development milestones: a late review delays the launch.

PhaseQuestionDeliverable approved at reviewUsual tools
DefineWhat must be designed and for whom? Why is improvement not enough?Signed charter: need, scope, business objective, team, scheduleProject charter, stakeholder analysis
MeasureWhich quantified targets translate the customers' needs?List of CTQs with target, limits and measurement methodVoice of the customer, CTQ tree, Kano model, QFD, benchmarking
AnalyseWhich concept can meet these targets?Chosen concept, rejected concepts and the reasonsDecision matrix, TRIZ, simulation, design FMEA
DesignWhat value for each element?Detailed design, control plan preparedDesign of experiments, tolerancing, prototype, process FMEA
VerifyDoes the design meet its targets in real use?Verification table, handover to the process ownerPilot, capability, control plan
Each phase answers a question and closes with a deliverable that its review approves.

The mistakes that sink a DMADV

A team sometimes chooses DMADV to avoid measuring the existing process. It judges the current process bad and wants to start from scratch. Without a baseline, nobody knows whether the new design does better. When a process exists, Measure records its performance even if the project replaces it.

CTQs that the organisation writes on the customers' behalf set targets that nobody asked for. A CTQ traces back to a need that a customer expressed. The CTQ tree keeps that trace.

A target without a measurement method leaves Verify without a verdict. The team then picks the measure that passes after the event.

A Verify reduced to a technical test verifies without validating. The system meets its specifications while customers abandon the form. The pilot measures the CTQs with real customers.

A handover without an owner leaves a new process without a control plan. Its CTQs drift as soon as the project team disbands.

AI considerations

A language model groups hundreds of open answers from a survey by need and proposes a CTQ for each. The team checks the groupings on a sample. The team itself sets the target and its limits from what the customers said.

An assistant proposes concepts in Analyse and spots contradictions between CTQs. These concepts widen the comparison. The model knows nothing of the constraints of the system in place or of the applicable law, which the team checks concept by concept.

It pre-fills a design FMEA with candidate failures. It writes the code of a simulation or of a design of experiments in R or Python. The analyst checks the assumptions of the simulation and the columns that the code reads.

A model cannot estimate the expected performance of a concept on each CTQ. Asked about a design it has not seen, it returns plausible figures. An invented forecast distorts the choice of concept. A health questionnaire carries sensitive personal data within the meaning of Art. 5 let. c FADP. These data go to an external AI service only under a processor contract that complies with Art. 9 FADP. Most of these services process data outside Switzerland. Their disclosure abroad then falls under Art. 16 FADP.

Examples

A health insurer in French-speaking Switzerland designs the online application for a new supplementary hospital insurance policy, for which no process existed. Its verification table sets each CTQ beside its result.

CTQTarget set in MeasureDesign elementVerificationResultVerdict
1. Fast decision90% of applications decided within two working daysAutomatic acceptance when the questionnaire declares no medical history, review by the medical service otherwiseFour-week pilot, 412 applications submitted94% (387 of 412)Target met
2. Complete application on first submissionAt least 90% of applications complete on first submissionMandatory fields, consistency check before submissionSame pilot96% (396 of 412)Target met
3. Form completedAt most 25% abandonment among started formsHealth questionnaire with 14 questionsSame pilot, 597 forms started31% (185 of 597)Off target: back to Design
3. Second verificationSame targetQuestionnaire cut to 9 questions. The 5 questions removed changed no acceptance decisionFour weeks, 600 forms started21% (126 of 600)Target met. Re-measured over these four weeks, CTQs 1 and 2 stay within their target
4. Correct premiumNo deviation from the approved tariffCalculation taken from the rating engine in production120 test cases and the 412 pilot premiums0 deviations in 532Target met
Verification table for the online application. Three CTQs meet their target in the first pilot. Form abandonment misses it and sends the project back to Design, then meets it at the second verification.

Each row follows one CTQ from phase to phase. Measure sets the target and the measurement method. Design sets the design element. The Verify pilot supplies the result. The abandonment row sends the project back to Design rather than to Analyse: the concept holds and one parameter changes.

Visualisations

The choice between DMAIC and DMADV is a diagram. A question sits at the top. Two roadmaps share the names of their first three phases, then split. Two return loops leave Verify. A table would lose the branch and the loops. The path from needs to design elements is a tree and also takes a diagram. The phase correspondence, the questions and tools per phase and the verification table read row by row and stay tables.

Cost

DimensionLevelJustification
PreparationMediumA charter to get signed, a cross-functional team to assemble and customers to interview before any design.
ExecutionHighSeveral months aligned with development. At least two concepts to evaluate, prototypes and a pilot to run.
DocumentationHighEach CTQ is traced from Measure to Verify: need, target, design element, result. The control plan passes to the process owner.

Tooling

A spreadsheet holds the CTQ list, the decision matrix and the verification table. On a medium-sized project it also carries the QFD house of quality.

Statistical software becomes necessary for the design of experiments, statistical tolerancing and the capability calculation in the pilot. Minitab and JMP are the standard tools in the profession. R and Python do the same work with code that the team reviews. A Monte Carlo simulation propagates the variation of the parameters through to the CTQ.

A process modelling tool describes the concepts, then the detailed design of a service process. A mock-up tool produces the screen prototypes that customers test in Design.

Sources

Disney Method
All techniques
DMAIC