Your Training Partner
Techniques Toolbox
A Discovery & Action Dialogue with the book's durations. The opening lasts 5 minutes: the facilitator and the recorder sit with a group of 5 to 15 people. The facilitator states the purpose and invites a round of introductions. The seven questions last 15 to 60 minutes. A "Discover" bracket groups questions 1 to 4. An "Act" bracket groups questions 5 to 7. Question 4 looks for a person or a group who already solves the problem. The recap lasts 5 minutes: the recorder reads back the discoveries, the action ideas and the people to involve. A dashed arrow leads from the people to involve to the next dialogue. The brackets and this arrow are our reading.

Discovery & Action Dialogue (DAD)

Discovery & Action Dialogue (DAD) is a meeting structure from Liberating Structures. A small group looks within its own ranks for the practices that already solve a chronic problem. The facilitator asks seven questions in a fixed order: from the signs of the problem to the actions, the volunteers and the people to involve. A recorder notes the discoveries and the action ideas. Henri Lipmanowicz and Keith McCandless describe the structure in The Surprising Power of Liberating Structures (2013). It is one of the 33 structures in the original repertoire. The book gives it 25 to 70 minutes.

Goal

Discovery & Action Dialogue is a facilitation structure in which a group discovers the practices that some of its members already use successfully against a shared problem. The group turns them into actions that volunteers take on.

The book calls these practices positive deviant behaviours. According to the authors, the group discovers these practices by itself and invents new ones in a setting where it feels safe. Each participant freely chooses which practices to adopt or try and which problems to tackle. According to the authors, resistance to change then disappears and the front line takes ownership of the solutions.

At the end of the session, the recorder recaps the discoveries, the action ideas and the people to involve. In our view, the recorder's notes give a business analyst the problem as the front line experiences it (questions 1 and 3) and the practices that already solve it (questions 2 and 4).

In Appreciative Interviews, people recount past successes and draw out the conditions for success. DAD starts from a named problem and looks for who already solves it. You'll find the other structures in the repertoire under Liberating Structures.

Usage

When to use it

  • Chronic problem that some people already solve: the group finds these practices among its members instead of importing them.
  • Imposed new practice that does not stick: according to the authors, a change lasts when the people who do the work found it themselves.
  • Problem that cuts across several functions: the book brings cross-functional groups together against patient falls or medication errors.
  • Data collection across several sites: the book uses DAD as an ethnographic data-collection tool.
  • Problem present in several units: according to the book, a series of DADs tackles it unit by unit.
  • One-on-one conversation: the book suggests following the same questions with two people.
  • Distributed team: the book has people answer in the chat. The authors' site says the structure works online without major adjustment.

When not to use it

  • Problem that nobody solves yet: in our view, question 4 finds nothing. In that case, brainstorming looks for new ideas.
  • Session meant to assign tasks: the book forbids the facilitator to hand out tasks. In our view, a RACI matrix fits better.

Description

Positive deviance

DAD brings positive deviance into a meeting. In every community, some people find better solutions than their peers although they have the same resources and face similar or worse difficulties. According to a note in the book, the community discovers their behaviours itself and then prepares an action plan so that everyone adopts them. The book describes positive deviance as community-driven and asset-based.

The Positive Deviance Collaborative traces the idea back to nutrition research in the 1960s. Marian Zeitlin and her colleagues refined it in 1990 in a book on child nutrition. In the early 1990s, Jerry and Monique Sternin applied it in Vietnam against child malnutrition for the NGO Save the Children.

The book attributes DAD to Henri Lipmanowicz and Keith McCandless. They designed it with a group of coaches who wanted to eliminate the transmission of methicillin-resistant Staphylococcus aureus (MRSA) in hospitals. Jerry and Monique Sternin were part of this group. According to the book, their work on positive deviance inspired the structure.

The invitation and the questions

The book starts from a chronic problem that the group shares and that some people already solve. Questions 1, 2 and 4 call it "problem X". In our view, the facilitator words X before the session in the unit's own language, since the questions repeat it word for word. Question 1 asks for the signs of the problem. The facilitator therefore keeps to one problem that the front line can observe. In the book, Diane Magrane rewrites the questions around patients' spiritual needs.

The Field Guide is the fourth part of the book and describes each structure. According to the Field Guide, the facilitator invites people to uncover tacit or latent solutions to a shared challenge. These solutions are hidden among the members of their working group, unit or community. Anyone who wants to solve the problem joins a small group. There, the facilitator asks the questions of the invitation one by one and in order:

  1. How do you know when problem X is present?
  2. How do you contribute effectively to solving problem X?
  3. What prevents you from doing this or taking these actions all the time?
  4. Do you know anybody who is able to frequently solve problem X and overcome barriers? What behaviors or practices made their success possible?
  5. Do you have any ideas?
  6. What needs to be done to make it happen? Any volunteers?
  7. Who else needs to be involved?

The book calls these questions progressive. Question 1 makes the problem observable through its signs. Question 2 asks each person what they already do successfully. Question 3 has the group name the barriers. Question 4 then looks for the positive deviants: the people who overcome these barriers. Questions 5 to 7 move from the discoveries to ideas, actions and the people to involve.

According to the Field Guide, question 2 often has two parts: what the person does for themselves and what they do for others. The book gives two examples: "What do you do to protect yourself from infections and what do you do to prevent infection transmissions?" "What do you do to keep your students engaged and what do you [do] to keep yourself energized and enthusiastic?"

The group, the place and the roles

According to the Field Guide, DAD takes place in the unit or department concerned. The group of 5 to 15 people stands or sits around a table. The book sees the diversity of roles and experience as an asset. The facilitator invites anyone who is around. Everyone has an equal opportunity to contribute.

The facilitator asks the questions and guides the conversation. A colleague of the facilitator is the recorder. The recorder notes the discoveries and the action ideas as they emerge.

The sequence

Opening5 min
FFacilitatorRRecorder
Group of 5 to 15 people
Purpose and round of introductions
Questions15 to 60 min
1Signs of the problem
2What I already do
3Barriers
4Who already succeeds?
5Ideas
6Actions and volunteers
7Who else to involve?
Discover
Act
Recap5 min
Discoveries
Action ideas
People to involve Next dialogue
One DAD with the book's durations. The group moves from the opening to the questions, then to the recorder's recap. Question 4 looks for who already solves the problem. The grouping into "Discover" and "Act" and the arrow to the next dialogue are our reading.

According to the Field Guide, only the question step varies in length: 15 to 60 minutes.

Step and durationFacilitatorRecorder
Opening (5 min)States the purpose of the initiative and of the DAD. Invites everyone to introduce themselves briefly in turn.–
Questions (15 to 60 min)Asks the whole group the questions one by one and in order. Gives everyone the opportunity to answer each question.Notes the discoveries and the action ideas as they emerge.
Recap (5 min)Asks the recorder to recap.Reads back the discoveries, the action ideas and the people to involve.
Calculated total25 to 70 min
The steps of a DAD according to the Field Guide: what the facilitator and the recorder do. The total is our calculation.

The book often uses DAD in series. Its examples cite a sequence of local dialogues around a chronic problem. In the book, question 7 and the recap name the people to involve. The authors' site turns this into a final 3-minute step: who to invite to the next dialogue.

The Field Guide stops at the recap. In our view, a business analyst then works through the recorder's notes question by question. Question 1 gives the analyst the observable signs of the problem. Question 3 gives them the barriers that the unit meets. Question 4 gives them the practices that they document before proposing a target process. Question 6 gives them actions and the names of their volunteers. Across a series of DADs, the practices that recur from one unit to the next show what can be shared and what stays local.

The book and the site

The authors' site describes another version. Several groups of 5 to 7 people work in parallel. Each group has a host and a scribe. The groups then meet in plenary. A facilitator who takes the group size from one version and the durations from the other builds a session that neither version describes.

ElementThe book's Field Guide (2013)Authors' site
Stated duration25 to 70 minAbout 35 to 80 min
InvitationUncover tacit or latent solutions to a shared challengeUncover the behaviours and practices that some members of the group already use against the shared challenge
GroupsOne group of 5 to 15 peopleGroups of 5 to 7 people, then the whole group. Minimum two participants.
RolesA facilitator and a recorderA host for the session. In each group, a host who asks the questions without answering them and a scribe who takes notes and may answer.
Order of the questionsThe order of the invitationThe host may depart from it.
Question 5"Do you have any ideas?""Do you have any new ideas for solving problem X?"
Question 6"What needs to be done to make it happen? Any volunteers?""What needs to be done to make it happen? Who volunteers to take these steps?"
Steps and durationsOpening 5 min
Questions 15 to 60 min
Recap 5 min
Introduction 1 min
Forming the groups 3 min
Presenting the questions 5 min
Answering the questions 15 to 60 min (equal time per question)
Highlights in plenary 5 min
Who to invite to the next dialogue 3 min
Total of the steps25 to 70 min32 to 77 min
OnlineEveryone answers in the chat. The facilitator then has the strongest stories, behaviours and actions voiced in front of the whole group.The structure works online without major adjustment.
Discovery & Action Dialogue according to the 2013 book and according to the authors' site. Each column follows a single source. The totals are our calculation.

The steps on the authors' site add up to three minutes less than the duration that the site states.

Running the dialogue

The facilitator creates an informal climate. They open with introductions and sometimes with an anecdote. To reduce the obstacles to participation, they hold the session where the participants work. As they enter the department, they invite the people they meet to join on the spot. They keep eye contact and sit with the group, never higher up or apart.

The facilitator talks much less than the participants. They encourage the participants to tell stories and to look in them for opportunities to act. Their questions call for detailed descriptions. The Field Guide asks them to draw out the stories that lead from a small change in behaviour to a change in values or in the allocation of resources.

When facilitators catch themselves judging a contribution, they count to ten and let the judgement go before they speak. They avoid remarks like "that's a good idea" and leave the participants to make their own assessments. They show curiosity about every contribution without answering the questions. The Field Guide sums up this stance: study at the feet of the people who do the work.

According to the Field Guide, this way of facilitating takes practice. The facilitator asks the recorder for frank feedback on the facilitation.

The traps

In our view, a facilitator who answers the questions or judges the answers replaces the group's practices with their own. The participants then wait for the right answer instead of describing what they do.

The Field Guide forbids the facilitator to give or take assignments. The actions of question 6 rest on volunteers. In our view, a manager who designates people to carry out the actions during the session takes this free choice away from the participants.

A recorder who writes only at the end loses ideas. According to the Field Guide, big ideas may emerge when they are least expected.

In our view, a group that jumps to ideas proposes solutions before it has described the problem as it experiences it. Questions 1 to 3 describe the problem and its barriers. Question 4 looks for who overcomes them.

Variations

The Field Guide suggests replacing the first three questions with questions taken from Creative Destruction (TRIZ in the book). The group then looks for what makes the problem worse and spots these practices in its own work.

QuestionBasic versionTRIZ variation
1How do you know when problem X is present?What can you do to make sure that problem X becomes much worse?
2How do you contribute effectively to solving problem X?Is there anything you are doing that in any way, shape, or form looks like any of the practices you just listed?
3What prevents you from doing this or taking these actions all the time?What is preventing you from stopping these practices?
The first three DAD questions and their TRIZ variation in the Field Guide.

In another variation from the Field Guide, the discoveries and the barriers supply the scripts for Improv Prototyping scenes. In a Canadian hospital, nurse Sherry Belanger's team used the material from its DADs for Improv Prototyping scenes specific to each unit. With a remote group, each person answers each question in the chat. The facilitator then picks the strongest stories, behaviours and actions and has them voiced in front of the whole group.

DAD in strings

Chapter 6 of the book proposes two strings that open with a series of DADs. In the first, the DADs bring hidden solutions to chronic problems into view. They invite peers to adapt the successful behaviours in their own settings. 1-2-4-All then reviews individual and group successes to bring out higher-level solutions. Design StoryBoard sketches the coordination across groups or units.

The second string spreads an innovation. After the DADs, each person decides with 1-2-4-All how to adapt the successful behaviours to their own context. Panarchy looks for ways to extend the success to other levels of the organisation. Design StoryBoard sketches the paths of coordination.

AI considerations

Neither the book nor the site mentions AI. In our view, AI helps the facilitator and the recorder before and after the dialogue. The answers remain the group's.

Before the session, the facilitator uses a language model to adapt the seven questions to a specific problem. They then have someone from the front line review the questions. Only that person knows whether the department describes the problem in those terms.

During the session, question 4 looks for local practices that nobody has written down yet. An assistant consulted in the room would propose generic good practices from elsewhere.

After the session, the recorder can give their notes to a model that sorts them into discoveries, action ideas and people to involve. Across a series of DADs, the model spots the practices that recur from one unit to the next. The recorder checks every line against their notes. An action attributed by mistake commits a person who did not volunteer.

The participants talk about their colleagues, their clients or their patients. Their names are personal data within the meaning of the Federal Act on Data Protection (FADP, Art. 5 let. a). Anything that concerns a patient's health is sensitive personal data (let. c no. 2). The recorder removes this information before giving the notes to an external AI service. In our view, the facilitator does not record the session. A participant who is being recorded is less willing to describe what stops them from doing the job well.

Examples

Diane Magrane adapted the DAD questions to a specific problem. Teams from eight medical schools were preparing a national conference on the competencies to teach medical students. They were looking at how physicians can better attend to patients' spiritual needs. Before the conference, each team held at least three DADs in academic and clinical settings. The book reproduces the questions that she gave them.

QuestionField GuideDiane Magrane's version
1How do you know when problem X is present?How do you know when the spiritual needs of patients are being neglected?
2How do you contribute effectively to solving problem X?How do YOU attend to your own spiritual needs and the spiritual needs of patients?
4Do you know anybody who is able to frequently solve problem X and overcome barriers? What behaviors or practices made their success possible?Is there a person or a unit/group that seems to be particularly successful at attending to spiritual needs? How do they do it?
6What needs to be done to make it happen? Any volunteers?What steps would start to bring these ideas to life? Any volunteers?
In part three of the book, Diane Magrane adapts the DAD questions to patients' spiritual needs. Questions 3, 5 and 7 keep the Field Guide wording.

Question 2 keeps the two parts that the Field Guide recommends: the needs of the person who answers and those of the patients. According to Diane Magrane, the surprise came from the students. Many clinicians said that they lacked the time to attend to patients' spiritual needs. Students on clinical rotations had seen physicians under time pressure do it while they shared a difficult diagnosis. In our view, question 4 aims at this kind of discovery.

Visualisations

A diagram shows a DAD according to the book: the opening, the seven questions and the recap with their durations. The steps, the two versions of the structure, the TRIZ variation and Diane Magrane's questions fit into rows and columns.

Cost

PhaseLevelJustification
PreparationLowWord problem X in the front line's own terms. Find a recorder and a place in the unit.
ExecutionMedium25 to 70 minutes according to the book, with a facilitator and a recorder. A series of DADs repeats this time in each unit.
DocumentationLowThe recorder's recap: discoveries, action ideas and people to involve.

Tooling

The Field Guide calls for paper, a flipchart or a projected screen to record the discoveries and the actions. A flipchart that everyone can see shows the group what the recorder captures.

Online, the Zoom or Microsoft Teams chat takes the answers that the Field Guide has participants write. The breakout rooms of these tools hold the parallel groups of the site's version. Each scribe keeps a shared document there.

Sources

The book is published under a Creative Commons BY-NC-SA licence. The authors' site publishes the structures under a BY-SA 4.0 licence.

  • Henri Lipmanowicz, Keith McCandless, The Surprising Power of Liberating Structures: Simple Rules to Unleash a Culture of Innovation, 2013, ISBN 978-0-615-89337-2: the description of DAD with its invitation, its questions, its steps, its purposes, its tips, its variations, its examples and its attribution (Field Guide, part four); the note on positive deviance; the strings (chapter 6); the accounts of Sherry Belanger and Diane Magrane (part three).
  • Discovery and Action Dialogue (DAD), Liberating Structures: the site's version with its invitation, its groups, its roles, its steps and their durations, the wording of questions 5 and 6, the tips for hosts and running the structure online.
  • Positive Deviance Collaborative, Background: the origin of positive deviance in nutrition research, the book by Marian Zeitlin and the project of Jerry and Monique Sternin in Vietnam.
Dirty 30
All techniques
Disney Method